After fixing the plane table to the tripod, the main operations which are needed at each plane table station are ______________ ?_x005F_x000D_1. levelling_x005F_x000D_2. orientation_x005F_x000D_3. centering_x005F_x000D_The correct sequence of these operations is

A. (1), (2),(3)
B. (1), (3), (2)
C. (3), (1), (2)
D. (2), (3), (1)
Answer» C. (3), (1), (2)