

MCQOPTIONS
Saved Bookmarks
1. |
A CPM family includes____________________? |
A. | CPA (Critical Path Analysis) |
B. | CPP (Critical Path Plotted) |
C. | MCE (Minimum Cost Expenditure) |
D. | CPS (Critical Path Scheduling) |
E. | all of the above |
Answer» F. | |