A CC pavement has sufficient structural strength and no significant distress. But it has insufficient thickness. What rehabilitation strategy is to be used in this case? |
A. | Bonded asphalt overlay |
B. | Hot mix asphalt overlay |
C. | Bonded concrete overlay |
D. | Cold mix asphalt overlay |
Answer» D. Cold mix asphalt overlay | |