

MCQOPTIONS
Saved Bookmarks
This section includes 8 Mcqs, each offering curated multiple-choice questions to sharpen your Construction Materials knowledge and support exam preparation. Choose a topic below to get started.
1. |
_______ is necessary to provide at suitable vertical distance in multi storage buildings. |
A. | Push cocks |
B. | Water tanks |
C. | Wheel valve |
D. | Relief valves |
Answer» E. | |
2. |
The concussive or violently shaking type fitted _______ for the flushing of WC pans leads to vibration. |
A. | Spouts |
B. | Slab |
C. | Toilets |
D. | Push cocks |
Answer» E. | |
3. |
The joints in the _________ of WC seats and nahni trap should be filled with rich cement mortar and cured for 7 days. |
A. | Plumbing |
B. | Spouts |
C. | Traps |
D. | Toilet |
Answer» B. Spouts | |
4. |
For the overhead RCC ___________ it should be seen that the permissible limits of stresses relating to resistance to cracking are not exceeded. |
A. | Relief valves |
B. | Water tanks |
C. | Push cocks |
D. | Taps |
Answer» C. Push cocks | |
5. |
When compound like ____________ is added to cement during construction, it prevents seepage, leakage and damp cause by capillary absorption. |
A. | Puldo |
B. | POP |
C. | Steel |
D. | Chlorine |
Answer» B. POP | |
6. |
In _________ method, a layer of hot mastic Asphalt is laid on the roof surface. |
A. | Dampness |
B. | Termite proofing |
C. | Mastic Asphalt |
D. | Roofing |
Answer» D. Roofing | |
7. |
In __________ method, the surface of RCC slab is kept rough and on this surface a layer of concrete is laid. |
A. | Mastic Asphalt |
B. | Finishing |
C. | Bedding Concrete |
D. | Finishing |
Answer» D. Finishing | |
8. |
The remedy lies in _________ initially with epoxy mortar or at least later stage while repairing the causes of the problems due to aging. |
A. | Push cocks |
B. | Filling of joints |
C. | Design of floor slab |
D. | Plumbing |
Answer» C. Design of floor slab | |