Explore topic-wise MCQs in Construction Materials.

This section includes 18 Mcqs, each offering curated multiple-choice questions to sharpen your Construction Materials knowledge and support exam preparation. Choose a topic below to get started.

1.

_______ is necessary to provide at suitable vertical distance in multi storage buildings.

A. Push cocks
B. Water tanks
C. Wheel valve
D. Relief valves
Answer» E.
2.

The concussive or violently shaking type fitted _______ for the flushing of WC pans leads to vibration.

A. Spouts
B. Slab
C. Toilets
D. Push cocks
Answer» E.
3.

The joints in the _________ of WC seats and nahni trap should be filled with rich cement mortar and cured for 7 days.

A. Plumbing
B. Spouts
C. Traps
D. Toilet
Answer» B. Spouts
4.

For the overhead RCC ___________ it should be seen that the permissible limits of stresses relating to resistance to cracking are not exceeded.

A. Relief valves
B. Water tanks
C. Push cocks
D. Taps
Answer» C. Push cocks
5.

When compound like ____________ is added to cement during construction, it prevents seepage, leakage and damp cause by capillary absorption.

A. Puldo
B. POP
C. Steel
D. Chlorine
Answer» B. POP
6.

In _________ method, a layer of hot mastic Asphalt is laid on the roof surface.

A. Dampness
B. Termite proofing
C. Mastic Asphalt
D. Roofing
Answer» D. Roofing
7.

In __________ method, the surface of RCC slab is kept rough and on this surface a layer of concrete is laid.

A. Mastic Asphalt
B. Finishing
C. Bedding Concrete
D. Finishing
Answer» D. Finishing
8.

The remedy lies in _________ initially with epoxy mortar or at least later stage while repairing the causes of the problems due to aging.

A. Push cocks
B. Filling of joints
C. Design of floor slab
D. Plumbing
Answer» C. Design of floor slab
9.

________IS_NECESSARY_TO_PROVIDE_AT_SUITABLE_VERTICAL_DISTANCE_IN_MULTI_STORAGE_BUILDINGS.?$

A. Push cocks
B. Water tanks
C. Wheel valve
D. Relief valves
Answer» E.
10.

The concussive or violently shaking type fitted _______ for the flushing of WC pans leads to vibration?

A. Spouts
B. Slab
C. Toilets
D. Push cocks
Answer» E.
11.

The joints in the ______ of WC seats and nahni trap should be filled with rich cement mortar and cured for 7 days.

A. Plumbing
B. Spouts
C. Traps
D. Toilet
Answer» B. Spouts
12.

For the overhead RCC ______, it should be seen that the permissible limits of stresses relating to resistance to cracking are not exceeded.

A. Relief valves
B. Water tanks
C. Push cocks
D. Taps
Answer» C. Push cocks
13.

When compound like _______ is added to cement during construction, it prevents seepage, leakage and damp cause by capillary absorption.

A. Puldo
B. POP
C. Steel
D. Chlorine
Answer» B. POP
14.

In _____ method, a layer of hot mastic Asphalt is laid on the roof surface.

A. Dampness
B. Termite proofing
C. Mastic Asphalt
D. Roofing
Answer» D. Roofing
15.

In _____ method, the surface of RCC slab is kept rough and on this surface a layer of concrete is laid.

A. Mastic Asphalt
B. Finishing
C. Bedding Concrete
D. Finishing
Answer» D. Finishing
16.

For ordinary buildings of cheap construction, the ________ of roof surface is done at the time of laying cement concrete.

A. Finishing
B. Brushing
C. Plastering
D. Painting
Answer» B. Brushing
17.

The remedy lies in _________ initially with epoxy mortar or at least later stage while repairing the problems causes due to aging.

A. Push cocks
B. Filling of joints
C. Design of floor slab
D. Plumbing
Answer» C. Design of floor slab
18.

The term _________ in the buildings is used to mean the coming out of water from components like walls and floors of the buildings.

A. Damp proofing
B. Termite proofing
C. Water proofing
D. Dampness
Answer» D. Dampness