1. |
Short circuit method is used for _____________ |
A. | drying out the transformer and oil simultaneously in the transformer tank |
B. | drying the transformer only, out of its tank. |
C. | for any type of drying |
D. | never used |
Answer» D. never used | |
2. |
Which readings should be taken while drying out process of transformer? |
A. | Insulation reading between HV and LV |
B. | Temperature |
C. | Time |
D. | Insulation, temperature, time all readings |
Answer» E. | |
3. |
For 400 kV transformer, moisture content required is _______________ |
A. | below 0.1% |
B. | below 0.5% |
C. | above 0.5% |
D. | below 1% |