1. |
The control limits for the p-chart and the standardized p-chart are different. |
A. | True |
B. | False |
Answer» B. False | |
2. |
The values of control limits for the standardized c-chart are different from the control limits of the standardized p-chart. |
A. | True |
B. | False |
Answer» C. | |
3. |
Which of these does not have the LCL and UCL at ∓3? |
A. | Standardized u-chart |
B. | Standardized R-chart |
C. | Standardized c-chart |
D. | Standardized p-chart |
Answer» C. Standardized c-chart | |
4. |
Which of these correctly shows the correct values for standardized u-chart in the order of CL, UCL and LCL? |
A. | 0, 3 and -3 |
B. | 3, 0 and -3 |
C. | 0, -3 and 3 |
D. | -3, 0 and 3 |
Answer» B. 3, 0 and -3 | |
5. |
The center line of the np-chart is at _______ |
A. | -2 |
B. | +2 |
C. | 0 |
D. | 3 |
Answer» D. 3 | |
6. |
The LCL of the standardized p-chart is ________ |
A. | -2 |
B. | +3 |
C. | -1 |
D. | -3 |
Answer» E. | |
7. |
The upper limit of the standardized c-chart for short production runs is ________ |
A. | 1 |
B. | 2 |
C. | -3 |
D. | +3 |
Answer» E. | |
8. |
What is the value of the statistic plotted on the standardized np-chart? |
A. | \(z_i=\frac{n\hat{p}_i+n\bar{p}}{\sqrt{n\bar{p}(1+\bar{p})}}\) |
B. | \(z_i=\frac{n\hat{p}_i-n\bar{p}}{\sqrt{n\bar{p}(1+\bar{p})}}\) |
C. | \(z_i=\frac{n\hat{p}_i+n\bar{p}}{\sqrt{n\bar{p}(1-\bar{p})}}\) |
D. | \(z_i=\frac{n\hat{p}_i-n\bar{p}}{\sqrt{n\bar{p}(1-\bar{p})}}\) |
Answer» E. | |
9. |
What is the standard deviation of the number of nonconformities per unit, when the standardized u-chart is used for monitoring the process? |
A. | \(\sqrt{\frac{\bar{u}}{2n}}\) |
B. | \(\sqrt{\frac{\bar{u}}{n}}\) |
C. | \(\frac{\sqrt{u}}{n}\) |
D. | \(\sqrt{\bar{u}}\) |
Answer» C. \(\frac{\sqrt{u}}{n}\) | |
10. |
The attribute ui when plotted on standardized control chart for short production runs, the statistic plotted on the chart has the value equal to __________ |
A. | \(Z_i=\frac{u_i-\bar{u}}{\sqrt{\frac{\bar{u}}{n}}}\) |
B. | \(Z_i=\frac{u_i+2\bar{u}}{\sqrt{\frac{\bar{u}}{n}}}\) |
C. | \(Z_i=\frac{u_i+\bar{u}}{\sqrt{\frac{\bar{u}}{n}}}\) |
D. | \(Z_i=\frac{u_i-2\bar{u}}{\sqrt{\frac{\bar{u}}{n}}}\) |
Answer» B. \(Z_i=\frac{u_i+2\bar{u}}{\sqrt{\frac{\bar{u}}{n}}}\) | |
11. |
What is the value of the target value for the number nonconforming chart? |
A. | np |
B. | 2p |
C. | 3p |
D. | 2np |
Answer» B. 2p | |
12. |
What is the value of the statistic to be plotted on the standardized c-chart which is designed to run in the short production? |
A. | \(Z_i=\frac{c_i+2\bar{c}}{\sqrt{\bar{c}}}\) |
B. | \(Z_i=\frac{c_i-2\bar{c}}{\sqrt{\bar{c}}}\) |
C. | \(Z_i=\frac{c_i-\bar{c}}{\sqrt{\bar{c}}}\) |
D. | \(Z_i=\frac{c_i+\bar{c}}{\sqrt{\bar{c}}}\) |
Answer» C. \(Z_i=\frac{c_i-\bar{c}}{\sqrt{\bar{c}}}\) | |
13. |
What is the standard deviation value for the standardized c chart used for the short production runs? |
A. | \(\sqrt{c}\) |
B. | \(\sqrt{\bar{c}}\) |
C. | \(\bar{c}\) |
D. | \(\hat{c}\) |
Answer» C. \(\bar{c}\) | |
14. |
What is the value of standard deviation for the standardized p-chart for short production runs? |
A. | \(\sqrt{\frac{\bar{p}(1-\bar{p})}{n}}\) |
B. | \(\sqrt{\frac{\bar{p}(1+\bar{p})}{n}}\) |
C. | \(\sqrt{\frac{\bar{p}(\bar{p}-1)}{n}}\) |
D. | \(\sqrt{\frac{\bar{p}(1-\bar{p})}{2n}}\) |
Answer» B. \(\sqrt{\frac{\bar{p}(1+\bar{p})}{n}}\) | |
15. |
What is the statistic used to plot on control chart for a standardized p-chart for short production runs? |
A. | \(Z_i=\frac{\hat{p}_i+\bar{p}}{\frac{\sqrt{\bar{p}(1+\bar{p})}}{n}}\) |
B. | \(Z_i=\frac{\hat{p}_i-\bar{p}}{\frac{\sqrt{\bar{p}(1-\bar{p})}}{n}}\) |
C. | \(Z_i=\frac{\hat{p}_i-\bar{p}}{\frac{\sqrt{\bar{p}(1+\bar{p})}}{n}}\) |
D. | \(Z_i=\frac{\hat{p}_i+\bar{p}}{\frac{\sqrt{\bar{p}(1-\bar{p})}}{n}}\) |
Answer» C. \(Z_i=\frac{\hat{p}_i-\bar{p}}{\frac{\sqrt{\bar{p}(1+\bar{p})}}{n}}\) | |