Explore topic-wise MCQs in Computer Science Engineering (CSE).

This section includes 128 Mcqs, each offering curated multiple-choice questions to sharpen your Computer Science Engineering (CSE) knowledge and support exam preparation. Choose a topic below to get started.

51.

Which of the following is not a major task of Exit criteria?

A. checking test logs against the exit criteria specified in test planning.
B. logging the outcome of test execution.
C. assessing if more tests are needed.
D. writing a test summary report for stakeholders.
Answer» C. assessing if more tests are needed.
52.

Which of the following is a form of functional testing?

A. boundary value analysis
B. usability testing
C. performance testing
D. security testing
Answer» B. usability testing
53.

Which of the following is not described in a unit test standard?

A. syntax testing
B. equivalence partitioning
C. stress testing
D. modified condition/decision coverage
Answer» D. modified condition/decision coverage
54.

Independent Verification & Validation is

A. done by the developer
B. done by the test engineers
C. done by management
D. done by an entity outside the project’s sphere of influence
Answer» E.
55.

When a new testing tool is purchased, it should be used first by:

A. a small team to establish the best way to use the tool
B. everyone who may eventually have some use for the tool
C. the independent testing team
D. the vendor contractor to write the initial scripts
Answer» B. everyone who may eventually have some use for the tool
56.

Inspections can find all the following except

A. variables not defined in the code
B. spelling and grammar faults in the documents
C. requirements that have been omitted from the design documents
D. how much of the code has been covered
Answer» E.
57.

Which of these can be successfully tested using Loop Testing methodology?

A. simple loops
B. nested loops
C. concatenated loops
D. all of the above
Answer» E.
58.

Which of the following is not a characteristic for Testability?

A. operability
B. observability
C. simplicity
D. robustness
Answer» E.
59.

How much testing is enough

A. this question is impossible to answer
B. the answer depends on the risks for your industry, contract and special requirements
C. the answer depends on the maturity of your developers
D. the answer should be standardized for the software development industry
Answer» C. the answer depends on the maturity of your developers
60.

Function/Test matrix is a type of

A. interim test report
B. final test report
C. project status report
D. management report
Answer» D. management report
61.

The process starting with the terminal modules is called

A. top-down integration
B. bottom-up integration
C. none of the above
D. module integration
Answer» C. none of the above
62.

Which, in general, is the least required skill of a good tester?

A. being diplomatic
B. able to write software
C. having good attention to detail
D. able to be relied on
Answer» C. having good attention to detail
63.

The purpose of requirement phase is

A. to freeze requirements
B. to understand user needs
C. to define the scope of testing
D. all of the above
Answer» E.
64.

During which test activity could faults be found most cost effectively?

A. execution
B. design
C. planning
D. check exit criteria completion
Answer» D. check exit criteria completion
65.

Which of the following statements about component testing is not true?

A. component testing should be performed by development
B. component testing is also known as isolation or module testing
C. component testing should have completion criteria planned
D. component testing does not involve regression testing
Answer» E.
66.

If an expected result is not specified then:

A. we cannot run the test
B. it may be difficult to repeat the test
C. it may be difficult to determine if the test has passed or failed
D. we cannot automate the user inputs
Answer» D. we cannot automate the user inputs
67.

A regression test

A. will always be automated
B. will help ensure unchanged areas of the software have not been affected
C. will help ensure changed areas of the software have not been affected
D. can only be run during user acceptance testing
Answer» C. will help ensure changed areas of the software have not been affected
68.

Who has the primary responsibility of setting the quality culture in the organization?

A. senior management
B. the training department
C. the quality department
D. nobody
Answer» D. nobody
69.

Quality Assurance methods are usually considered

A. detective
B. corrective
C. preventive
D. proactive
Answer» D. proactive
70.

A Plan to overcome the risk called as

A. migration plan
B. master plan
C. maintenance plan
D. mitigation plan
Answer» E.
71.

Optimization, Defect Prevention, and Quality Control. Its come under the

A. cmm level 2
B. cmm level 3
C. cmm level 4
D. cmm level5
Answer» E.
72.

Which of the following is not one of the techniques to find defects

A. operational techniques
B. functional techniques
C. dynamic techniques
D. static techniques
Answer» B. functional techniques
73.

Cost of Production = Right The First time cost(RTF. + Cost of Quality.

A. true
B. false
Answer» B. false
74.

AdHoc testing is a part of

A. unit testing
B. regression tesing
C. exploratory testing
D. performance testing
Answer» D. performance testing
75.

TQM represents

A. tool quality management
B. test quality manager
C. total quality management
D. total quality manager
Answer» D. total quality manager
76.

Project Risk affects The Schedule or Resources.

A. true
B. false
Answer» B. false
77.

How severely the bug is effecting the application is called as

A. severity
B. priority
C. fix ability
D. traceability
Answer» B. priority
78.

Quality plan describes the quality procedures and standards that will be used in a project.

A. false
B. true
Answer» C.
79.

Application should be stable. Clear Design and Flow of the application is needed for Automation testing.

A. false
B. true
Answer» C.
80.

Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes.

A. true
B. false
Answer» B. false
81.

A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as

A. process metric
B. product metric
C. test metrics
Answer» B. product metric
82.

Integration, It will come under

A. cmm level 1
B. cmm level 3
C. cmm level 2
D. none
Answer» C. cmm level 2
83.

Types of quality tools are Problem Identification Tools and Problem Analysis Tools.

A. true
B. false
Answer» B. false
84.

Validation plan describes the approach ,resources and schedule used for system validation

A. true
B. false
Answer» B. false
85.

Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required

A. true
B. false
Answer» B. false
86.

Defects generally fall into the following categories?

A. wrong
B. missing
C. extra
D. all the above
Answer» E.
87.

This type of test include, how well the user will be able to understand and interact with the system?

A. usability testing
B. user acceptance testing
C. alpha testing
D. beta testing.
Answer» B. user acceptance testing
88.

Path Tested = Number of Path Tested / Total Number of Paths

A. true
B. false
Answer» B. false
89.

Standards and procedures for managing changes in an evolving software product is called?

A. confirmation management
B. confederation mangement
C. configuration management
D. compartability management
Answer» D. compartability management
90.

It provides a set of levels and an assessment model, and presents a set of recommended practices that allow organizations to improve their testing processes.

A. tim (testing improving model)
B. tmm (testing maturity model)
C. tqm(total quality management)
Answer» B. tmm (testing maturity model)
91.

SPICE Means

A. software process improvement and capability determination
B. software process improvement and compatibility determination.
C. software process invention and compatibility determination.
D. software process improvement and control determination
Answer» B. software process improvement and compatibility determination.
92.

Retesting modules connected to the program or component after a change has been made?

A. full regression testing
B. unit regression
C. regional regression
D. retesting.
Answer» D. retesting.
93.

Informing to the developer which bug to be fix first is called as

A. severity
B. priority
C. fix ability
D. traceability
Answer» C. fix ability
94.

Earlier a defect is found the cheaper it is to fix it. Is the above statement correct?

A. yes
B. no
Answer» B. no
95.

Business Risk affects The Organization developing or Procuring the software.

A. true
B. false
Answer» B. false
96.

Executing the same test case on a modified build called as

A. regression testing
B. retesting
C. ad hoc testing
D. sanity testing
Answer» B. retesting
97.

Product Risk affects The quality or performance of the software.

A. true
B. false
Answer» B. false
98.

A metric used to measure the characteristic of documentation and code called as

A. process metric
B. product metric
C. test metrics
Answer» C. test metrics
99.

Boundary value analysis belongs to which testing method?

A. black box testing
B. white box testing
Answer» B. white box testing
100.

Retesting the entire application after a change has been made called as?

A. full regression testing
B. unit regression
C. regional regression
D. retesting
Answer» B. unit regression