Explore topic-wise MCQs in Computer Science Engineering (CSE).

This section includes 12 Mcqs, each offering curated multiple-choice questions to sharpen your Computer Science Engineering (CSE) knowledge and support exam preparation. Choose a topic below to get started.

1.

Which of the following statements is/are false?1. Fault tree analysis method is used to determine reliability of product2. The goal of Six Sigma is to reduce number of defects to 2.4 parts per billion3. Six sigma is represented by normal distribution curve4. Poka yoke is a policy which prevents occurrence of human errors

A. only statement 3
B. statement 2 and statement 3
C. only statement 2
D. statement 1, 3 and 4
Answer» D. statement 1, 3 and 4
2.

In Six Sigma, a is de ned as any process output that does not meet customer speci cations

A. error
B. cost
C. quality
D. defect
Answer» E.
3.

Data are onthe check sheet to record the frequency of speci c events during a datacollection period.

A. collected and tabulated
B. "circulated"
C. "reported"
D. none of the above
Answer» B. "circulated"
4.

What is the main aim of Software Con guration Management (SCM)?

A. identify change
B. control change
C. ensure that change is
D. all of the above
Answer» E.
5.

What are the criteria to decide the testing efforts?1. Time and budget2. Size of development team3. Size of testers4. Risk associated with project

A. 1, 3, 4
B. 1, 2, 3
C. 1, 4
D. 1, 3
Answer» D. 1, 3
6.

Choose the correct option according to the given statements regarding risk management.Statement 1: A risk is a potential problem it might happen, it might not. Statement 2: Managers, software engineers, and customers participate in risk analysis and management. Statement 3: Only Managers participate in risk analysis and management.

A. statement 1 and 2 are correct.
B. only statement 1 is correct.
C. only statement 3 is correct.
D. statement 1 and 3 are correct.
Answer» B. only statement 1 is correct.
7.

White Box techniques are also classi ed as

A. design based testing
B. structural testing
C. error guessing technique
D. none of the mentioned
Answer» C. error guessing technique
8.

A tool is piece of software that enables people to de ne software testing tasks.

A. testautomation
B. selenium
C. hpe
D. ranorex
Answer» B. selenium
9.

Which automation framework step is based on the input provided by the gap analysis.

A. work plan
B. businesscase
C. requirement anlysiss
D. risk management
Answer» D. risk management
10.

Apache is an open source Java application designed to load test functional behavior and gauge software performance.

A. junit
B. selenium
C. jmeter
D. loader
Answer» D. loader
11.

The main goal of Automation Testing is to the number of test cases to be run manually

A. increase
B. reduce
C. enlarge
D. multiply
Answer» C. enlarge
12.

A is an existing defect that hasn t yet ust because another defect has yet caused a failure because the exact set of conditions were never met.

A. mutant defect
B. bksu defect
C. latent defect
D. delayed defect
Answer» D. delayed defect