MCQOPTIONS
Saved Bookmarks
This section includes 18 Mcqs, each offering curated multiple-choice questions to sharpen your Master of Computer Applications (MCA) knowledge and support exam preparation. Choose a topic below to get started.
1. |
Which of these activities is not one of the activities recommended to be performed by an independent SQA group? |
A. | Prepare SQA plan for the project |
B. | Review software engineering activities to verify process compliance |
C. | Report any evidence of noncompliance to senior management |
D. | Serve as the sole test team for any software produced |
Answer» E. | |
2. |
Which of the following is not a section in the standard for SQA plans recommended by IEEE? |
A. | Budget |
B. | Documentation |
C. | Reviews and audits |
D. | Test |
Answer» B. Documentation | |
3. |
_________describes how the skills and experience of the project team members will be developed. |
A. | Staff development plan |
B. | Staff removal plan |
C. | Quality management plan |
D. | Quality assurance Plan |
Answer» B. Staff removal plan | |
4. |
Among the tools of TQM, the tool ordinarily used to aid in understanding the sequence of events through which a product travels is a |
A. | Pareto chart |
B. | Flow chart |
C. | Check sheet |
D. | Taguchi map |
Answer» C. Check sheet | |
5. |
If a sample of parts is measured and the mean of the measurements is outside the control limits the process is |
A. | In control, but not capable of producing within the established control limits |
B. | Out of control and the process should be investigated for assignable variation |
C. | Within the established control limits with only natural causes of variation |
D. | Monitored closely to see if the next sample mean will also fall outside the control limits |
Answer» C. Within the established control limits with only natural causes of variation | |
6. |
Which of the following is the task of a Tester?i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project.ii. Prepare and acquire Test Dataiii. Implement Tests on all test levels, execute and log the tests.iv. Create the Test Specifications |
A. | i, ii, iii is true and iv is false |
B. | ii, iii, iv is true and i is false |
C. | i is true and ii, iii, iv are false |
D. | iii and iv is correct and i and ii are incorrect |
Answer» C. i is true and ii, iii, iv are false | |
7. |
It measures the quality of a productIt is a specific part of the QA procedure; it is a corrective process,It applies for particular product & Deals with the product. |
A. | Validation |
B. | Verification |
C. | Quality Assurance |
D. | Quality Control |
Answer» E. | |
8. |
It measures the quality of processes used to create a quality product.It is a system of management activities,It is a preventive process, It applies for entire life cycle & Deals with Process. |
A. | Validation |
B. | Verification |
C. | Quality Assurance |
D. | Quality Control |
Answer» D. Quality Control | |
9. |
Which type of risk factor is most likely to cause problems for a software project developing commercial software? |
A. | Inadequate user documentation |
B. | Litigation expense |
C. | Low productivity |
D. | Cancellation of project |
Answer» B. Litigation expense | |
10. |
To check whether we are developing the right product according to the customer requirements are not. It is a static process |
A. | Validation |
B. | Verification |
C. | Quality Assurance |
D. | Quality Control |
Answer» C. Quality Assurance | |
11. |
To check whether we have developed the product according to the customer requirements are not. It is a Dynamic process. |
A. | Validation |
B. | Verification |
C. | Quality Assurance |
D. | Quality Control |
Answer» B. Verification | |
12. |
The review and approved document (i.e. Test plan, System Requirement Specification s) is called as |
A. | Delivery Document |
B. | Baseline Document |
C. | Checklist |
D. | none |
Answer» C. Checklist | |
13. |
_________ are defined to be the variance between the expected result and actual result when the software is put to operation. |
A. | Defect. |
B. | Coverage Analysis. |
C. | Bug. |
D. | Audit |
Answer» B. Coverage Analysis. | |
14. |
Control Charts is a statistical technique to assess, monitor, and ______the stability of a process. |
A. | Maintain |
B. | Process |
C. | Demand |
D. | Increase |
Answer» B. Process | |
15. |
Which of the following process ensures that versions of systems and components are recorded and maintained? |
A. | Codeline |
B. | Configuration control |
C. | Version |
D. | Workspace |
Answer» C. Version | |
16. |
Requirement and Analysis, Design, Development or Coding, Testing and __________is called as Software Development Life Cycle (SDLC) |
A. | Maintenance |
B. | Feedback |
C. | Analysis |
D. | Elicitation |
Answer» B. Feedback | |
17. |
Configuration Management Plan describes the Configuration Management procedures and _________to be used. |
A. | Structures |
B. | Process |
C. | People |
D. | Hardware |
Answer» B. Process | |
18. |
According to Pareto s principle, x% of defects can be traced to y% of all causes. What are the values of x and y? |
A. | 60, 40 |
B. | 70, 30 |
C. | 80, 20 |
D. | No such principle exists |
Answer» D. No such principle exists | |