101.

What is the product of the probability of incurring a loss due to the risk and the potential magnitude of that loss ?

A. Risk exposure
B. Risk prioritization
C. Risk analysis
D. All of the mentioned
Answer» B. Risk prioritization
102.

What threatens the viability of the software to be built ?

A. Known risks
B. Business risks
C. Project risks
D. Technical risks
Answer» C. Project risks
103.

Which of the following is an important factor that can affect the accuracy and efficacy of estimates ?

A. Project size
B. Planning process
C. Project complexity
D. Degree of structural uncertainty
Answer» B. Planning process
104.

Which of the following uses empirically derived formulas to predict effort as a function of LOC or FP ?

A. FP-Based Estimation
B. Process-Based Estimation
C. COCOMO
D. Both FP-Based Estimation and COCOMO
Answer» E.
105.

Which one is not a risk management activity ?

A. Risk assessment
B. Risk generation
C. Risk control
D. None of the mentioned
Answer» C. Risk control
106.

COCOMO stands for____________________?

A. Constructive cost model
B. Comprehensive cost model
C. Constructive cost estimation model
D. Complete cost estimation model
Answer» B. Comprehensive cost model
107.

Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?

A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned
Answer» B. Post-architecture-stage model
108.

COCOMO-II was developed at _____________________?

A. University of Texas
B. University of Southern California
C. MIT
D. IIT-Kanpur
Answer» C. MIT
109.

COCOMO was developed initially by _____________________ ?

A. B.Beizer
B. Rajiv Gupta
C. B.W.Bohem
D. Gregg Rothermal
Answer» D. Gregg Rothermal
110.

Quality planning is the process of developing a quality plan for__________________?

A. team
B. project
C. customers
D. project manager
Answer» C. customers
111.

What all has to be identified as per risk identification ?

A. Threats
B. Vulnerabilities
C. Consequences
D. All of the mentioned
Answer» E.
112.

Identify the sub-process of process improvement ___________________?

A. Process introduction
B. Process analysis
C. De-processification
D. Process distribution
Answer» C. De-processification
113.

Which of the following is incorrect activity for the configuration management of a software system ?

A. Internship management
B. Change management
C. Version management
D. System management
Answer» B. Change management
114.

The process each manager follows during the life of a project is known as ___________________?

A. Project Management
B. Manager life cycle
C. Project Management Life Cycle
D. All of the mentioned
Answer» D. All of the mentioned
115.

What describes the data and control to be processed ?

A. Planning process
B. Software scope
C. External hardware
D. Project complexity
Answer» C. External hardware
116.

Which one is not a size measure for software product ?

A. LOC
B. Halstead’s program length
C. Function Count
D. Cyclomatic Complexity
Answer» E.
117.

Estimation of size for a project is dependent on___________________?

A. Cost
B. Time
C. Schedule
D. None of the mentioned
Answer» E.