MCQOPTIONS
Saved Bookmarks
This section includes 68 Mcqs, each offering curated multiple-choice questions to sharpen your Software Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
Which one of the following is not a maintenance model ? |
A. | Waterfall model |
B. | Reuse-oriented model |
C. | Iterative enhancement model |
D. | Quick fix model |
Answer» B. Reuse-oriented model | |
2. |
Which property of a sociotechnical system depends on the technical system components, its operators, and its operating environment ? |
A. | security |
B. | usability |
C. | volume |
D. | reliability |
Answer» C. volume | |
3. |
Which property of a sociotechnical system varies depending on how the component assemblies are arranged and connected ? |
A. | security |
B. | security |
C. | volume |
D. | reliability |
Answer» D. reliability | |
4. |
Which regression test selection technique exposes faults caused by modifications ? |
A. | Efficiency |
B. | Precision |
C. | Generality |
D. | Inclusiveness |
Answer» E. | |
5. |
Which requirements are the foundation from which quality is measured ? |
A. | Hardware |
B. | Software |
C. | Programmers |
D. | None of the mentioned |
Answer» C. Programmers | |
6. |
Who identifies, documents, and verifies that corrections have been made to the software ? |
A. | Project manager |
B. | Project team |
C. | SQA group |
D. | All of the mentioned |
Answer» D. All of the mentioned | |
7. |
Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ? |
A. | CMM |
B. | ISO 9001 |
C. | ISO 9000-3 |
D. | None of the mentioned |
Answer» D. None of the mentioned | |
8. |
Which of the following manuals is not a user documentation ? |
A. | Beginner’s Guide |
B. | Installation guide |
C. | Reference Guide |
D. | SRS |
Answer» E. | |
9. |
Which of the following manuals is a user documentation ? |
A. | SRS -Software Requirement Specification |
B. | SDD -Software Design Document |
C. | System Overview |
D. | None of the mentioned |
Answer» D. None of the mentioned | |
10. |
Which of the following is not included in failure costs ? |
A. | rework |
B. | repair |
C. | failure mode analysis |
D. | none of the mentioned |
Answer» E. | |
11. |
Which of the following is not included in External failure costs ? |
A. | testing |
B. | help line support |
C. | warranty work |
D. | complaint resolution |
Answer» B. help line support | |
12. |
Which of the following is not an appraisal cost in SQA ? |
A. | inter-process inspection |
B. | maintenance |
C. | quality planning |
D. | testing |
Answer» D. testing | |
13. |
Which of the following is not a SQA plan for a project ? |
A. | evaluations to be performed |
B. | amount of technical work |
C. | audits and reviews to be performed |
D. | documents to be produced by the SQA group |
Answer» C. audits and reviews to be performed | |
14. |
Which of the following is not a part of process change ? |
A. | Introducing new practices, methods or processes |
B. | Introducing new team members to existing project |
C. | Introducing or removing deliverable |
D. | Introducing new roles or responsibilities |
Answer» C. Introducing or removing deliverable | |
15. |
Which of the following is not a maturity level in CMM ? |
A. | Design |
B. | Repeatable |
C. | Managed |
D. | Optimizing |
Answer» D. Optimizing | |
16. |
Which of the following companies provide certifications for their own products ? |
A. | CISCO |
B. | ORACLE |
C. | Microsoft |
D. | All of the mentioned |
Answer» E. | |
17. |
What type of software testing is generally used in Software Maintenance ? |
A. | Regression Testing |
B. | System Testing |
C. | Integration Testing |
D. | Unit Testing |
Answer» B. System Testing | |
18. |
What is often undefined and is left to the ingenuity of the project managers and engineers ? |
A. | Role |
B. | Exception |
C. | Activity |
D. | Process |
Answer» C. Activity | |
19. |
What is not included in prevention costs ? |
A. | quality planning |
B. | formal technical reviews |
C. | test equipment |
D. | equipment calibration and maintenance |
Answer» E. | |
20. |
What is a tangible output of an activity that is predicted in a project plan ? |
A. | Deliverable |
B. | Activity |
C. | Condition |
D. | Process |
Answer» B. Activity | |
21. |
What is a software patch ? |
A. | Required or Critical Fix |
B. | Emergency Fix |
C. | Daily or routine Fix |
D. | None of the mentioned |
Answer» C. Daily or routine Fix | |
22. |
What does ACT stands for in In Boehm model for software maintenance ? |
A. | Actual change track |
B. | Annual change track |
C. | Annual change traffic |
D. | Actual change traffic |
Answer» D. Actual change traffic | |
23. |
What are the two ways to view the human error of a sociotechnical system ? |
A. | hardware and software approach |
B. | management and users approach |
C. | person and systems approach |
D. | all of the mentioned |
Answer» D. all of the mentioned | |
24. |
What are legacy systems ? |
A. | new systems |
B. | old systems |
C. | under-developed systems |
D. | none of the mentioned |
Answer» C. under-developed systems | |
25. |
“Understandability” answers which of the following description ? |
A. | The extent to which the process is explicitly defined |
B. | Process errors are avoided or trapped before they result in product errors |
C. | Defined process is acceptable and usable by the engineers responsible for producing the software product |
D. | Process continues in spite of unexpected problems |
Answer» B. Process errors are avoided or trapped before they result in product errors | |
26. |
Third Party Certification for software standards is based on ___________________? |
A. | Ul 1998, Second Edition |
B. | UT 1998, Second Edition |
C. | Ul 1992, Second Edition |
D. | Ul 1996, Second Edition |
Answer» B. UT 1998, Second Edition | |
27. |
There are _______________ overlapping stages in the lifetime of large and complex sociotechnical systems? |
A. | two |
B. | three |
C. | four |
D. | five |
Answer» C. four | |
28. |
The two dimensions of spiral model are ______________________? |
A. | diagonal, angular |
B. | radial, perpendicular |
C. | radial, angular |
D. | diagonal, perpendicular |
Answer» D. diagonal, perpendicular | |
29. |
The process of transforming a model into source code is known as___________________? |
A. | Forward engineering |
B. | Reverse engineering |
C. | Re-engineering |
D. | Reconstructing |
Answer» B. Reverse engineering | |
30. |
The process of generating analysis and design documents is known as ___________________? |
A. | Software engineering |
B. | Software re-engineering |
C. | Reverse engineering |
D. | Re-engineering |
Answer» D. Re-engineering | |
31. |
The primary objective of formal technical reviews is to find _________________ during the process so that they do not become defects after release of the software? |
A. | errors |
B. | equivalent faults |
C. | failure cause |
D. | none of the mentioned |
Answer» B. equivalent faults | |
32. |
The modification of the software to match changes in the ever changing environment, falls under which category of software maintenance ? |
A. | Corrective |
B. | Adaptive |
C. | Perfective |
D. | Preventive |
Answer» C. Perfective | |
33. |
The ISO 9000 series of standards is a program that can be used for external quality assurance purposes ? |
A. | True |
B. | False |
Answer» C. | |
34. |
The Incremental Model is combination of elements of_____________________? |
A. | Build & FIX Model & Waterfall Model |
B. | Linear Model & RAD Model |
C. | Linear Model & Prototyping Model |
D. | Waterfall Model & RAD Model |
Answer» D. Waterfall Model & RAD Model | |
35. |
The documentation of a process which records the tasks, the roles and the entities used is called__________________? |
A. | Process metric |
B. | Process analysis |
C. | Process modelling |
D. | None of the mentioned |
Answer» D. None of the mentioned | |
36. |
The cost of re-engineering is often significantly less than the costs of developing new software ? |
A. | True |
B. | False |
Answer» B. False | |
37. |
The CMM emphasizes____________________? |
A. | continuous process improvement |
B. | the need to record information |
C. | the need to accept quality system |
D. | none of the mentioned |
Answer» C. the need to accept quality system | |
38. |
The CMMI assessment is based on a x-point scale. What is the value of x ? |
A. | 0 |
B. | 2 |
C. | 4 |
D. | 6 |
Answer» E. | |
39. |
The Capability Maturity Model (CMM) is a continuous model ? |
A. | True |
B. | False |
Answer» C. | |
40. |
Robustness” answers which of the following description ? |
A. | CASE tools be used to support the process activities |
B. | Process errors are avoided or trapped before they result in product errors |
C. | Defined process is acceptable and usable by the engineers responsible for producing the software |
D. | Process continues in spite of unexpected problems |
Answer» E. | |
41. |
Reverse engineering is the last activity in a re-engineering project _____________________? |
A. | True |
B. | False |
Answer» C. | |
42. |
Regression testing is a very expensive activity? |
A. | True |
B. | False |
Answer» B. False | |
43. |
Prototypes and 4GL business systems are categorized under which process ? |
A. | Informal |
B. | Managed |
C. | Methodical |
D. | Supported |
Answer» B. Managed | |
44. |
Program modularization and Source code translation are the activities of ____________________? |
A. | Forward engineering |
B. | Reverse Engineering |
C. | Reengineering |
D. | Reverse Engineering and Reengineering |
Answer» D. Reverse Engineering and Reengineering | |
45. |
Processes for evolving a software product depend on __________________? |
A. | Type of software to be maintained |
B. | Development processes used |
C. | Skills and experience of the people involved |
D. | All of the mentioned |
Answer» E. | |
46. |
Process improvement is the set of activities, methods, and transformations that developers use to develop and maintain information systems ? |
A. | True |
B. | False |
Answer» C. | |
47. |
National Voluntary Laboratory Accreditation Program approve accreditation in ___________________? |
A. | Environmental standards |
B. | Computers and electronics |
C. | Product testing |
D. | All of the mentioned |
Answer» E. | |
48. |
Model preferred to create client/server applications is _______________________? |
A. | WINWIN Spiral Model |
B. | Spiral Model |
C. | Concurrent Model |
D. | Incremental Model |
Answer» D. Incremental Model | |
49. |
_______________ measures the ability of a regression test selection technique to handle realistic applications ? |
A. | Efficiency |
B. | Precision |
C. | Generality |
D. | Inclusiveness |
Answer» D. Inclusiveness | |
50. |
It is always best to start process analysis with a new test model ? |
A. | True |
B. | False |
Answer» C. | |