MCQOPTIONS
Bookmark
Saved Bookmarks
→
Software Engineering
→
Software Components in Software Engineering
→
The CMMI assessment is based on a x-point scale. W..
1.
The CMMI assessment is based on a x-point scale. What is the value of x ?
A.
0
B.
2
C.
4
D.
6
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Which one of the following is not a maintenance model ?
Which property of a sociotechnical system depends on the technical system components, its operators, and its operating environment ?
Which property of a sociotechnical system varies depending on how the component assemblies are arranged and connected ?
Which regression test selection technique exposes faults caused by modifications ?
Which requirements are the foundation from which quality is measured ?
Who identifies, documents, and verifies that corrections have been made to the software ?
Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ?
Which of the following manuals is not a user documentation ?
Which of the following manuals is a user documentation ?
Which of the following is not included in failure costs ?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply