151. |
Computer software is a complete package, which includes software program, its documentation and user guide on how to use the software. |
A. | True |
B. | False |
Answer» B. False | |
152. |
COCOMO stands for ______ . |
A. | COnsumed COst MOdel |
B. | COnstructive COst MOdel |
C. | COmmon COntrol MOdel |
D. | COmposition COst MOdel |
Answer» C. COmmon COntrol MOdel | |
153. |
CMM model in Software Engineering is a technique of ______ . |
A. | Develop the software. |
B. | Improve the software process. |
C. | Improve the testing process. |
D. | All of the above. |
Answer» C. Improve the testing process. | |
154. |
Classes communicate with one another via ______ . |
A. | Read sensors |
B. | Dial phones |
C. | Messages |
D. | None of the above |
Answer» D. None of the above | |
155. |
Choose the correct option according to the given statement. Statement 1: Software is a physical rather than a logical system element. Statement 2: Computer software is the product that software engineers design and build. Statement 3: Software is a logical rather than a physical system element. Statement 4: Software is a set of application programs that are built by software engineers. |
A. | Statement 1 and 2 are correct. |
B. | Only Statement 2 and 3 are correct. |
C. | Statement 2 and 3 and 4 are correct. |
D. | All statements are correct |
Answer» D. All statements are correct | |
156. |
Choose the correct option according to given below statement. Statement 1: Umbrella activities are independent of any one framework activity and occur throughout the process. Statement 2: software quality assurance, software configuration management are umbrella activity. Statement 3: software quality assurance, software configuration management are not umbrella activity. |
A. | Only statement 1 is correct. |
B. | Statement 1 and statement 2 are correct. |
C. | Only statement 3 is correct. |
D. | Statement 1 and statement 3 are correct. |
Answer» C. Only statement 3 is correct. | |
157. |
Changes are made to the system to reduce the future system failure chances is called _________ . |
A. | Preventive Maintenance |
B. | Adaptive Maintenance |
C. | Corrective Maintenance |
D. | Perfective Maintenance |
Answer» B. Adaptive Maintenance | |
158. |
CASE tools cannot be grouped together if they have similar functionality, process activities and capability of getting integrated with other tools. |
A. | True |
B. | False |
Answer» C. | |
159. |
CASE tools are used by software project managers, analysts and engineers to develop software system. |
A. | True |
B. | False |
Answer» B. False | |
160. |
CASE tools are set of automated software application programs, that are not used to support, accelerate and smoothen the SDLC activities. |
A. | Yes |
B. | No |
Answer» C. | |
161. |
CASE Tool stands for. |
A. | Computer Aided Software Engineering |
B. | Component Aided Software Engineering |
C. | Constructive Aided Software Engineering |
D. | Computer Analysis Software Engineering |
Answer» B. Component Aided Software Engineering | |
162. |
Burst force, backtracking, cause elimination are strategies used in art of debugging. |
A. | Yes |
B. | No |
Answer» B. No | |
163. |
Building an excellent product or system that no one really want a risk is a ________ . |
A. | Technical risk |
B. | Schedule risk |
C. | Business risk |
D. | Performance risk |
Answer» D. Performance risk | |
164. |
Budget is not a section in the standard SQA plans that are recommended in IEEE. |
A. | True |
B. | False |
Answer» B. False | |
165. |
Boehm suggests an approach that addresses project objectives, milestones and schedules, responsibilities, management and technical approaches and required resources, This principle is called as ______ . |
A. | W3HH principle |
B. | WHO principle |
C. | W5HH principle |
D. | None of the above. |
Answer» D. None of the above. | |
166. |
Application of science, tools and methods to find cost effective solution to the problems is a definition of software engineering. |
A. | True |
B. | False |
Answer» C. | |
167. |
An entity in ER Model is a real world being, which has some properties called_____ . |
A. | Attributes |
B. | Relationship |
C. | Domain |
D. | None of the above |
Answer» B. Relationship | |
168. |
An effective risk management plan will need to address which of the following issues? |
A. | Risk avoidance |
B. | Risk monitoring |
C. | Contingency planning |
D. | All mentioned above |
Answer» E. | |
169. |
Alpha and Beta Testing are forms of _______ . |
A. | Acceptance testing |
B. | Integration testing |
C. | System Testing |
D. | Unit testing |
Answer» B. Integration testing | |
170. |
Aggregation represents ______ . |
A. | is_a relationship |
B. | part_of relationship |
C. | composed_of relationship |
D. | none of above |
Answer» D. none of above | |
171. |
Activities and action taken on the data are represented by circle or round-edged rectangles is called _____ . |
A. | Entities |
B. | Process |
C. | Data storage |
D. | Data flow |
Answer» C. Data storage | |
172. |
Activities and action taken on the data that are represented by Circle or Round-edged Rectangles are called, _________ . |
A. | Process |
B. | Data storage |
C. | Data flow |
D. | Entities |
Answer» B. Data storage | |
173. |
Abbreviate the term SMI. |
A. | Software Maturity Index |
B. | Software Model Instruction |
C. | Software Maturity Instruction |
D. | Software Model Index |
Answer» B. Software Model Instruction | |
174. |
Abbreviate the term OOHMD. |
A. | Object-Oriented Hypermedia Design Method |
B. | Objet-Oriented High Design method |
C. | Objet-Oriented Hypermedia Development Method |
D. | Object-Oriented Hypermedia Distributed Method |
Answer» B. Objet-Oriented High Design method | |
175. |
Abbreviate the term CASE. |
A. | Computer Authorized Software Engineering |
B. | Computer Aided Software Engineering |
C. | Common Authorized Software Engineering |
D. | Common Aided Software Engineering |
Answer» C. Common Authorized Software Engineering | |
176. |
A software project manager is a person who undertakes the responsibility of carrying out the software project. |
A. | True |
B. | False |
Answer» B. False | |
177. |
A small picture representing an associated application, what does it mean? |
A. | Icon |
B. | Window |
C. | Menu |
D. | Cursor |
Answer» B. Window | |
178. |
A quality objective for a software team is achieve in how many DRE approaches? |
A. | 2 |
B. | 3 |
C. | 1 |
D. | 4 |
Answer» D. 4 | |
179. |
A good structured design has low cohesion and high coupling arrangements. |
A. | True |
B. | False |
Answer» C. | |
180. |
A good design review is not important for good software design and its accuracy and quality. |
A. | True |
B. | False |
Answer» C. | |
181. |
A generic process framework for software engineering encompasses five activities. What are those activities? |
A. | Communication, risk management, measurement, production, deployment. |
B. | Communication, Planning, Modeling, construction, deployment. |
C. | Analysis, designing, programming, debugging, maintenance |
D. | None of the above. |
Answer» C. Analysis, designing, programming, debugging, maintenance | |