

MCQOPTIONS
Saved Bookmarks
This section includes 181 Mcqs, each offering curated multiple-choice questions to sharpen your Computer Science knowledge and support exam preparation. Choose a topic below to get started.
101. |
Measurements can be categorized in two ways. What are those two ways? |
A. | Direct and Indirect |
B. | Front and Rear |
C. | Metric |
D. | Quality and Reliability. |
Answer» B. Front and Rear | |
102. |
Measure of reliability is given by ______ . |
A. | Mean Time between success. |
B. | Mean reliable |
C. | Mean Time between failure (MTBF). |
D. | MTTR |
Answer» D. MTTR | |
103. |
Line of code(LOC) of the product comes under which type of measures? |
A. | Indirect measures |
B. | Direct measures |
C. | Coding |
D. | None of the above. |
Answer» C. Coding | |
104. |
Line of code(LOC) can be used to normalize quality and/or productivity measure for _______ . |
A. | Extended function point metrics |
B. | Function point metrics. |
C. | Size oriented metrics. |
D. | None of the above. |
Answer» D. None of the above. | |
105. |
Layout appropriateness according to sears is a worthwhile design metric for human/computer interfaces. |
A. | True |
B. | False |
Answer» B. False | |
106. |
Knowledge of software program, design and structure is essential in _______ . |
A. | Black-box testing |
B. | White-box testing |
C. | Integration testing |
D. | None of the above |
Answer» C. Integration testing | |
107. |
_________ is a piece of programming code which performs a well defined task. |
A. | Computer Program |
B. | Computer Software |
C. | Both A & B |
D. | None of the above |
Answer» B. Computer Software | |
108. |
In the requirement analysis which model depicts the information domain for the problem? |
A. | Data models |
B. | Class-Oriented models |
C. | Scenario-based models |
D. | Flow-oriented models |
Answer» B. Class-Oriented models | |
109. |
In the requirement analysis which model depicts how the software behaves as a consequence of external events? |
A. | Class-Oriented models |
B. | Scenario-based models |
C. | Flow-oriented models |
D. | Behavioural models |
Answer» E. | |
110. |
In the Empirical Estimation Technique which model is developed by Barry W. Boehm? |
A. | Putnam model |
B. | COCOMO |
C. | Both A & B |
D. | None of the above |
Answer» C. Both A & B | |
111. |
In software metrics which metrics evaluate the track budget, schedule and human resource? |
A. | Requirement metrics |
B. | Product metrics |
C. | Process metrics |
D. | None of the above |
Answer» D. None of the above | |
112. |
In Software validation, requirements can be checked against following conditions: 1) If they can be practically implemented 2) If they are valid and as per functionality and domain of software 3) If there are any ambiguities 4) If they are completed |
A. | True |
B. | False |
Answer» B. False | |
113. |
In software maintenance removing errors spotted by users is known as _______. |
A. | Adaptive |
B. | Corrective |
C. | Perfective |
D. | Preventive |
Answer» C. Perfective | |
114. |
In Risk management process what makes a note of all possible risks, that may occur in the project? |
A. | Manage |
B. | Monitor |
C. | Categorize |
D. | Identification |
Answer» E. | |
115. |
In Re-engineering process which concepts in order to get re-engineered software? |
A. | Apply forward engineering |
B. | Perform |
C. | Decide |
D. | Re-structure program |
Answer» B. Perform | |
116. |
In OOD, the attributes(data variables) and methods( operation on the data) are bundled together is called _______ . |
A. | Classes |
B. | Objects |
C. | Encapsulation |
D. | Inheritance |
Answer» D. Inheritance | |
117. |
If you have no clue of how to improve the process for the quality software which model is used? |
A. | A Continuous model |
B. | A Staged model |
C. | Both A & B |
D. | None of the above |
Answer» C. Both A & B | |
118. |
If the software process were based on scientific and engineering concepts, it would be easier to re-create new software than to scale an existing one. |
A. | True |
B. | False |
Answer» C. | |
119. |
If the objects focus on the problem domain, then we are concerned with ______. |
A. | Object Oriented Analysis |
B. | Object Oriented Design |
C. | Object Oriented Analysis and Design |
D. | None of the above |
Answer» B. Object Oriented Design | |
120. |
If P is risk probability, L is loss, then Risk Exposure (RE) is computed as_____ . |
A. | RE = P/L |
B. | RE = P + L |
C. | RE = P*L |
D. | RE = 2* P *L |
Answer» D. RE = 2* P *L | |
121. |
If maintenance cost changes are often left undocumented which may cause more conflicts in future software. |
A. | True |
B. | False |
Answer» B. False | |
122. |
If every requirement stated in the Software Requirement Specification (SRS) has only one interpretation, SRS is said to be correct _____ . |
A. | Unambiguous |
B. | Consistent |
C. | Verifiable |
D. | None of the above |
Answer» B. Consistent | |
123. |
If every requirement can be checked by a cost-effective process, then the SRS is _________ . |
A. | Verifiable |
B. | Traceable |
C. | Modifiable |
D. | Complete |
Answer» B. Traceable | |
124. |
If an application allows executing multiple instances of itself, they appear on the screen as separate windows are called ______ . |
A. | Window |
B. | Tabs |
C. | Menu |
D. | Cursor |
Answer» C. Menu | |
125. |
IEEE provides a standard as IEEE 830-1993. For which activity this standard is recommended standard? |
A. | Software requirement specification. |
B. | Software design. |
C. | Testing. |
D. | Both a and b |
Answer» B. Software design. | |
126. |
IEEE 830-1993 is a IEEE recommended standard for _______ . |
A. | Software Requirement Specification |
B. | Software design |
C. | Testing |
D. | Both (A) and (B) |
Answer» B. Software design | |
127. |
How many numbers of maturity levels in CMM are available? |
A. | 3 |
B. | 4 |
C. | 5 |
D. | 6 |
Answer» D. 6 | |
128. |
How many characteristics does Value Adjustment Factor(VAF) in Function Point Analysis have? |
A. | 11 |
B. | 12 |
C. | 13 |
D. | 14 |
Answer» E. | |
129. |
Give the name to diagram that represents the flow of activities described by the use cases and at the same time the captors are involved in UML . |
A. | State diagram |
B. | Swim lane diagram |
C. | Activity diagram |
D. | Component diagram |
Answer» C. Activity diagram | |
130. |
Give the disadvantages of modularization. |
A. | Smaller components are easier to maintain |
B. | Program can be divided based on functional aspects |
C. | Desired level of abstraction can be brought in the program |
D. | None of the above |
Answer» E. | |
131. |
Function oriented metric were first proposed by ___________ and he suggested a measure called the __________ . |
A. | Barry Boehm, KLOC. |
B. | Barry Boehm, Function point. |
C. | Albrecht, Function point. |
D. | Albrecht, KLOC. |
Answer» D. Albrecht, KLOC. | |
132. |
Function-oriented design is comprised of many smaller sub-systems is known as, Functions. |
A. | Yes |
B. | No |
Answer» B. No | |
133. |
From the following which quality deals with maintaining the quality of the software product? |
A. | Quality assurance |
B. | Quality control |
C. | Quality efficiency |
D. | None of the above |
Answer» C. Quality efficiency | |
134. |
From the following select the correct option that is used to display the available option for selection. |
A. | Check-box |
B. | Text-box |
C. | Button |
D. | Radio-Button |
Answer» E. | |
135. |
From the following methods which size of the software product can be calculated? |
A. | Counting the lines of delivered code |
B. | Counting delivered function points |
C. | Both A and B |
D. | None of the above |
Answer» D. None of the above | |
136. |
From the following give three major categories of risk, 1) Schedule risk 2) Project risk 3) Technical risk 4) Business risk |
A. | 1,2 and 3 |
B. | 2,3 and 4 |
C. | 1,2 and 4 |
D. | 1,3 and 4 |
Answer» C. 1,2 and 4 | |
137. |
FAST stands for ______ . |
A. | Facilitated Application Software Technique. |
B. | Functional Application Software Technique. |
C. | Facilitated Application Specification Technique. |
D. | None of the above. |
Answer» D. None of the above. | |
138. |
FAST stands for ________ . |
A. | Functional Application Specification Technique |
B. | Fast Application Specification Technique |
C. | Facilitated Application Specification Technique |
D. | None of the above |
Answer» D. None of the above | |
139. |
Fan-in is an indication of _______ . |
A. | Objects |
B. | Inheritance |
C. | Messages |
D. | Polymorphism |
Answer» C. Messages | |
140. |
Every attribute is defined by its corresponding set of values is called ______ . |
A. | Entity |
B. | Domain |
C. | Relationship |
D. | None of the above |
Answer» C. Relationship | |
141. |
Every attribute is defined by its corresponding set of values, called Attributes. |
A. | True |
B. | False |
Answer» C. | |
142. |
ER model shows the _______ . |
A. | Static view |
B. | Functional view |
C. | Dynamic view |
D. | All the above |
Answer» B. Functional view | |
143. |
Elements of module in functional cohesion are grouped because they all contribute to a single well-defined function. It can also be reused. |
A. | True |
B. | False |
Answer» B. False | |
144. |
Each metric should be validated empirically in a wide variety of contexts before being published and that are used to make decisions. |
A. | True |
B. | False |
Answer» B. False | |
145. |
Develop an abbreviated solution for the problem is an objective for building an analysis model. |
A. | True |
B. | False |
Answer» C. | |
146. |
Data flow diagram is a graphical representation of flow of data in an information system. |
A. | True |
B. | False |
Answer» B. False | |
147. |
Coupling and cohesion can be represented using a _______ . |
A. | cause-effect graph |
B. | dependence matrix |
C. | Structure chart |
D. | SRS |
Answer» C. Structure chart | |
148. |
Cost of Production = Right The First time cost (RTF +-----------) . |
A. | Cost of Deployment |
B. | Cost of Quality |
C. | Cost of maintenance |
D. | Cost of Production |
Answer» C. Cost of maintenance | |
149. |
Constantine suggests four “organizational paradigms” for software engineering teams. The best project team organizational model to use when handling extremely complex problems is ________ . |
A. | Random paradigm |
B. | Open paradigm |
C. | Synchronous paradigm |
D. | Closed paradigm |
Answer» B. Open paradigm | |
150. |
Configuration management is an essential part of the system maintenance. It is aided with version control tools to control versions, semi-version or patch management. |
A. | True |
B. | False |
Answer» B. False | |