| 701. | 
                                    Which is not a product metric?( | 
                            
| A. | Size | 
| B. | Reliability | 
| C. | Productivity | 
| D. | Functionality | 
| Answer» D. Functionality | |
| 702. | 
                                    ------------it shows a two dimensional depicting system elements and their linkages. | 
                            
| A. | Schematic Models | 
| B. | Flow system models | 
| C. | Static system models | 
| D. | Dynamic system models | 
| Answer» B. Flow system models | |
| 703. | 
                                    Software requirements specification are | 
                            
| A. | A set of activities and associated results that produce a software product. | 
| B. | It is concerned with re-implementing legacy system to make them more maintainable. | 
| C. | It is the official statement of what is required of the system developers; it includes uses requirements for a system and detailed specification of the system requirements | 
| D. | None of these. | 
| Answer» D. None of these. | |
| 704. | 
                                    DFD shows how things happen or the physical component is called ------------ | 
                            
| A. | Logical DFD | 
| B. | Physical DFD | 
| C. | Data dictionary | 
| D. | None of these | 
| Answer» B. Physical DFD | |
| 705. | 
                                    ----------- the degree to which the software assists in enabling new users to apply thesystem. | 
                            
| A. | Training | 
| B. | Traceability | 
| C. | Simplicity | 
| D. | Security | 
| Answer» B. Traceability | |
| 706. | 
                                    Which one is not infrastructure software?( | 
                            
| A. | Operating system | 
| B. | Database management system | 
| C. | Compilers | 
| D. | Result management system | 
| Answer» E. | |
| 707. | 
                                    Software implementation converts system specifications into | 
                            
| A. | Development system | 
| B. | System decomposition | 
| C. | Executable system | 
| D. | None of these | 
| Answer» D. None of these | |
| 708. | 
                                    Effectiveness is a major goal of these types of systems. | 
                            
| A. | Expert systems | 
| B. | Closed system | 
| C. | MIS | 
| D. | DSS | 
| Answer» B. Closed system | |
| 709. | 
                                    In system modeling : A-Classification model; B-Stimulus-response model; C-Data processing model: 1-Here data-flow diagram show how data is processed at different stages; 2-Here object class/inheritance diagram show, how entities have the common characteristics;3-Here state transition diagram shows the how the system reader to internal and external events | 
                            
| A. | A-2, B-3, C-1 | 
| B. | A-3, B-1, C-2 | 
| C. | A-1, B-2, C-3 | 
| D. | A-1, B-3, C-2 | 
| Answer» B. A-3, B-1, C-2 | |
| 710. | 
                                    It is concerned with making decision about the best way for an organization that acquire a system and deciding on the best suppliers of that system. | 
                            
| A. | System procurement | 
| B. | System quality assessment | 
| C. | System release management | 
| D. | System reliability | 
| Answer» B. System quality assessment | |
| 711. | 
                                    In system models, object is | 
                            
| A. | An entity that has a state and defined set of operations that operates on that state | 
| B. | Software program | 
| C. | Programming language, that develops any given program | 
| D. | None of these | 
| Answer» B. Software program | |
| 712. | 
                                    SDLC stands for( | 
                            
| A. | Software design life cycle | 
| B. | Software development life cycle | 
| C. | System development life cycle | 
| D. | System design life cycle | 
| Answer» C. System development life cycle | |
| 713. | 
                                    In McCall’s software quality factors, Product transition phase ----not conta | 
                            
| A. | Portability | 
| B. | Reusability | 
| C. | Interoperability | 
| D. | Testability | 
| Answer» E. | |
| 714. | 
                                    Spiral Model has high reliability requirements. | 
                            
| A. | True | 
| B. | False | 
| C. | all | 
| D. | none | 
| Answer» B. False | |
| 715. | 
                                    ERD stands for( | 
                            
| A. | Entity relationship diagram | 
| B. | Exit related diagram | 
| C. | Entity relationship design | 
| D. | Exit related design | 
| Answer» B. Exit related diagram | |
| 716. | 
                                    -----------system collect,store,modify and retrieve the transaction of an organization. | 
                            
| A. | Execution Information system(EIS) | 
| B. | Integrated system | 
| C. | Subsystem | 
| D. | Transaction processing system | 
| Answer» E. | |
| 717. | 
                                    .A data dictionary is created when a __________ created. | 
                            
| A. | Instance | 
| B. | Segment | 
| C. | Database | 
| D. | Dictionary | 
| Answer» D. Dictionary | |
| 718. | 
                                    FAST stands for( | 
                            
| A. | Functional Application Specification Technique | 
| B. | Fast Application Specification Technique | 
| C. | Facilitated Application Specification Technique | 
| D. | None of the above | 
| Answer» D. None of the above | |
| 719. | 
                                    What are Design Class Models? | 
                            
| A. | They show classes in a software system | 
| B. | They represents attributes,operations, association in abstraction from language | 
| C. | They show implementation details | 
| D. | All of the mentioned | 
| Answer» E. | |
| 720. | 
                                    Commonality | 
                            
| A. | It takes project, product hardware and personnel attributes into account when formulating a cost estimate. | 
| B. | In it server provides set of services and set of clients uses these services. | 
| C. | Extent to which standards are used to achieve interoperability | 
| D. | None of these | 
| Answer» D. None of these | |
| 721. | 
                                    Which of these comes under business activities? | 
                            
| A. | Project | 
| B. | Operations | 
| C. | Planning | 
| D. | Project & Operations | 
| Answer» E. | |
| 722. | 
                                    Risk management is now recognized as one of the most important project management tasks. | 
                            
| A. | true | 
| B. | false | 
| Answer» B. false | |
| 723. | 
                                    It is always best to start process analysis with a new test model. | 
                            
| A. | True | 
| B. | False | 
| C. | none | 
| D. | all | 
| Answer» C. none | |
| 724. | 
                                    Software engineering deals with | 
                            
| A. | Software development | 
| B. | Hardware development | 
| C. | System development | 
| D. | Network development | 
| Answer» B. Hardware development | |
| 725. | 
                                    ) KPA in CMM stands for( | 
                            
| A. | Key Process Area | 
| B. | Key Product Area | 
| C. | Key Principal Area | 
| D. | Key Performance Area | 
| Answer» B. Key Product Area | |
| 726. | 
                                    User requirements are written in | 
                            
| A. | Natural language | 
| B. | FORTRAN | 
| C. | Assembly language | 
| D. | None of these | 
| Answer» B. FORTRAN | |
| 727. | 
                                    Which of these is wrong in terms of definition? | 
                            
| A. | Planing is formulating scheme for doing project | 
| B. | Organizing is directing people doing project work | 
| C. | Project is one time effort to achieve a particular goal for organization | 
| D. | Staffing is filing the positions in an organizational structure | 
| Answer» C. Project is one time effort to achieve a particular goal for organization | |
| 728. | 
                                    During validation( | 
                            
| A. | Process is checked | 
| B. | Product is checked | 
| C. | Developer’s performance is evaluated | 
| D. | The customer checks the product | 
| Answer» E. | |
| 729. | 
                                    In system modeling : A-Model;B-Prototype;;1- it’s an abstract view of a system that ignores system details; 2-It’s an initial version of system software which givers end-users a concrete impression of the system capacities | 
                            
| A. | A-1, B-2 | 
| B. | A-1, B-1 | 
| C. | B-1, A-2 | 
| D. | A-2, B-2 | 
| Answer» B. A-1, B-1 | |
| 730. | 
                                    Which one is a quality attribute?( | 
                            
| A. | Reliability | 
| B. | Availability | 
| C. | Security | 
| D. | All of the above | 
| Answer» E. | |
| 731. | 
                                    SRS stands for( | 
                            
| A. | Software requirements specification | 
| B. | System requirements specification | 
| C. | Systematic requirements specifications | 
| D. | None of the above | 
| Answer» B. System requirements specification | |
| 732. | 
                                    Cost of ownership is | 
                            
| A. | Process of estimating the costs associated with software development projects that include the effort, time, and labor required. | 
| B. | Overall cost of maintaining a computer system that includes the costs associated with personnel/training/ maintenance of hardware and software/ requirements growth. | 
| C. | Overall cost of operating a computer system that includes the costs associated with personnel / training / system operations. | 
| D. | Overall cost of a computer system to an organization that includes the costs associated with operating/ maintaining the system, and the lifetime of operational use of the system. | 
| Answer» E. | |
| 733. | 
                                    In Data tension | 
                            
| A. | It shows the software process as a set of activities each of which carries out data transformation. | 
| B. | Data and associated programs are re- engineered to remove limits on the data processing | 
| C. | It is responsible for the definition, operation, protection, performance, and recovery of a database. | 
| D. | Development of a database to meet a user’s requirements | 
| Answer» C. It is responsible for the definition, operation, protection, performance, and recovery of a database. | |
| 734. | 
                                    Extent to which a system or component makes efficient use of its data storage space- occupies a small volume. | 
                            
| A. | Compatibility | 
| B. | Compactness | 
| C. | Code | 
| D. | Communication | 
| Answer» C. Code | |
| 735. | 
                                    When is a system where each sub-system can respond to generated event are referred as ? | 
                            
| A. | Event driven control system | 
| B. | Object oriented model | 
| C. | Manager control model | 
| D. | None of these | 
| Answer» B. Object oriented model | |
| 736. | 
                                    Cost of operation is | 
                            
| A. | Process of estimating the costs associated with software development projects that include the effort, time, and labor required. | 
| B. | Overall cost of maintaining a computer system that includes the costs associated with personnel / training/ maintenance of hardware and software/ requirements growth. | 
| C. | Overall cost of operating a computer system that includes the costs associated with personnel / training / system operations. | 
| D. | Overall cost of a computer system to an organization that includes the costs associated with operating/ maintaining the system, and the lifetime of operational use of the system. | 
| Answer» D. Overall cost of a computer system to an organization that includes the costs associated with operating/ maintaining the system, and the lifetime of operational use of the system. | |
| 737. | 
                                    Classification model | 
                            
| A. | One system is designed as the system controller and has responsibility for managing the execution of other subsystems. | 
| B. | Each system is named as in attribute- based identification and associated with one or more change requests. | 
| C. | An object class inheritance diagram, how entities have common characteristics. | 
| D. | The objective of this software develop- ment is zero-defect software. | 
| Answer» D. The objective of this software develop- ment is zero-defect software. | |
| 738. | 
                                    Software engineering is an engineering discipline concerned with | 
                            
| A. | Software development | 
| B. | Software production | 
| C. | Software implementation | 
| D. | All the above | 
| Answer» E. | |
| 739. | 
                                    Software mistakes during coding are known as:( | 
                            
| A. | failures | 
| B. | defects | 
| C. | bugs | 
| D. | errors | 
| Answer» D. errors | |
| 740. | 
                                    ------------- encompass a broad array of tasks that include project planning andestimation system analysis, design of data structure, program architecture, coding, testingand maintenance. | 
                            
| A. | Software engineering tools | 
| B. | Software engineering Procedures | 
| C. | Software engineering Methods | 
| D. | None of these | 
| Answer» B. Software engineering Procedures | |
| 741. | 
                                    The waterfall model of the software process considers each process activity as a_______ pha | 
                            
| A. | separate | 
| B. | discrete | 
| C. | Both a and b options | 
| D. | None of the above | 
| Answer» D. None of the above | |
| 742. | 
                                    Software maintenance is | 
                            
| A. | It is the general process of changing system after it has been delivered. The changes can be to correct coding error to correct design error, or adding new components to system. | 
| B. | It is concerned with deriving a numeric value for some attribute of a software product or a software process. | 
| C. | It is any type of measurement, which relates to software system, process and related documentation. | 
| D. | None of these | 
| Answer» B. It is concerned with deriving a numeric value for some attribute of a software product or a software process. | |
| 743. | 
                                    Which phase is not available in software life cycle?( | 
                            
| A. | Coding | 
| B. | Testing | 
| C. | Maintenance | 
| D. | Abstraction | 
| Answer» E. | |
| 744. | 
                                    Software metric is | 
                            
| A. | It is the general process of changing system after it has been delivered. The changes can be to correct coding error to correct design error, or adding new components to system. | 
| B. | It is concerned with deriving a numeric value for some attribute of a software product or a software process. | 
| C. | It is any type of measurement, which relates to software system, process and related documentation. | 
| D. | None of these Software specification is | 
| Answer» B. It is concerned with deriving a numeric value for some attribute of a software product or a software process. | |
| 745. | 
                                    Risk planning process | 
                            
| A. | Extent to which a software module can be used in more than one computing program | 
| B. | It involves regular monitoring of the risks identified and of new risks that develops. | 
| C. | It considers each of the key risks that are identified and identifies strategies to manage the risk. | 
| D. | None of these | 
| Answer» D. None of these | |
| 746. | 
                                    Which of the following represents the use of Conceptual models during product design? | 
                            
| A. | Understanding the problem design | 
| B. | Setting Data Requirements | 
| C. | Validating Requirements | 
| D. | All of the mentioned | 
| Answer» E. | |
| 747. | 
                                    If all tasks must be executed in the same time-span, what type of cohesion is beingexhibited? | 
                            
| A. | Functional Cohesion | 
| B. | Temporal Cohesion | 
| C. | Functional Cohesion | 
| D. | Sequential Cohesion | 
| Answer» C. Functional Cohesion | |
| 748. | 
                                    A generic software engineering design follows which of the activities? | 
                            
| A. | Analysis | 
| B. | Architectural Design | 
| C. | Finalize Design | 
| D. | Analysis & Architectural Design | 
| Answer» E. | |
| 749. | 
                                    ---------- The damage that occurs when the program encounters an error. | 
                            
| A. | Error tolerance | 
| B. | Training | 
| C. | Traceability | 
| D. | simplicity | 
| Answer» B. Training | |
| 750. | 
                                    Program is( | 
                            
| A. | Subset of software | 
| B. | super set of software | 
| C. | Software | 
| D. | none of the above | 
| Answer» B. super set of software | |