Explore topic-wise MCQs in Computer Science Engineering (CSE).

This section includes 1167 Mcqs, each offering curated multiple-choice questions to sharpen your Computer Science Engineering (CSE) knowledge and support exam preparation. Choose a topic below to get started.

551.

Which one is not a product quality factor of McCall quality model?(

A. Product revision
B. Product operation
C. Product specification
D. Product transition
Answer» D. Product transition
552.

__________ is the intellectual tool that allows us to deal with concepts apart fromparticular instances of those concepts.

A. Module
B. Abstraction
C. Fan-in
D. Fan-out
Answer» C. Fan-in
553.

Graphics

A. Extent to which a system or component performs a broad range of functions.
B. The objective of an organization to achieve.
C. Methods and techniques for converting data to or from graphic display via computers.
D. None of these
Answer» D. None of these
554.

If in a software system, the operation is degraded if results are not produced according to the specified timing require- ments then the software system is referred as

A. Soft real time system
B. hard real time system
C. Real time system
D. None of these
Answer» B. hard real time system
555.

Degree to which a system or component performs only the necessary functions relevant to a particular purpose

A. Abstractness
B. Acceptable risk
C. Acceptance testing
D. None of these
Answer» B. Acceptable risk
556.

Which one of the statements is not correct during requirements engineering?(

A. Requirements are difficult to uncover
B. Requirements are subject to change
C. Requirements should be consistent
D. Requirements are always precisely known.
Answer» E.
557.

Collection of logically related data stored together in one or more computerized files.

A. Database
B. Debugging
C. Defect testing
D. Defensive programming
Answer» B. Debugging
558.

Product features are related to:(

A. Functional requirements
B. Non functional requirements
C. Interface requirement
D. None of the above
Answer» B. Non functional requirements
559.

Robustness is

A. The probability that the system will cause an accident
B. Extent to which a system or component can function correctly in the presence of invalid inputs or stressful environment conditions
C. The frequency of occurrence with which unexpected behavior is likely to occur.
D. None of these
Answer» C. The frequency of occurrence with which unexpected behavior is likely to occur.
560.

Interoperability is

A. Ability of two or more systems, to exchange information and to use the information that has been exchanged.
B. Time taken to respond to an event.
C. Either the hazard not arises, if arise; it will not result in an accident.
D. None of these
Answer» B. Time taken to respond to an event.
561.

Which of the following describes”Is-a-Relationship”?

A. Aggregation
B. Inheritance
C. Dependency
D. All of the mentioned
Answer» C. Dependency
562.

Software requirement specification is

A. The official statement of what is required of the system developers
B. The non official statement of system interface
C. Non specified format of system working
D. None of these
Answer» B. The non official statement of system interface
563.

) CMM level 1 has(

A. 6 KPAs
B. 2 KPAs
C. 0 KPAs
D. None of the above
Answer» D. None of the above
564.

Transforming of logic and data from designspecifications (design descriptions) into a programming language

A. Compatibility
B. Compactness
C. Coding
D. Communication
Answer» D. Communication
565.

Reliability of software is dependent on number of errors(

A. removed
B. remaining
C. both (a) & (b)
D. None of the above
Answer» C. both (a) & (b)
566.

software engineering is a ----------------

A. Graphical technology
B. Layered technology
C. Paired technology
D. Electrical technology
Answer» B. Layered technology
567.

Risk assessment is

A. Here each identified risk is analyzed and prioritized
B. It begins after all hazards are identified. For each hazard, the outcome of the risk assessment process is a statement of acceptability.
C. The anticipate risks which night affect the project schedule or the quality of the software being developed and to take action to avoid these risks.
D. None of these
Answer» C. The anticipate risks which night affect the project schedule or the quality of the software being developed and to take action to avoid these risks.
568.

Clean room software development

A. One system is designed as the system controller and has responsibility for managing the execution of other subsystems.
B. Each system is named as in attribute- based identification and associated with one or more change requests.
C. An object class inheritance diagram, how entities have common characteristics.
D. The objective is to develop zero-defect software.
Answer» E.
569.

Software life cycle is

A. Time-period that begins when a software product is conceived and ends when the software is no longer available for use.
B. Adaptive maintenance, performed to make a computer program usable in a changed environment.
C. A simplified description of a software process that is presented from a particular perspective.
D. None of these
Answer» B. Adaptive maintenance, performed to make a computer program usable in a changed environment.
570.

In ----------- analyst examines information that has been recorded about system and aboutthe users.

A. Record Review
B. Interviews
C. Questionnaires
D. Observation
Answer» C. Questionnaires
571.

It is a property of the system that equates to its trustworthiness. It is the degree of user’s confidence that the system will operate as one expect, that the system would not fail in normal use.

A. Dependability
B. Availability
C. Maintainability
D. None of these
Answer» B. Availability
572.

__________in this each module and its dub module corresponding to a processing step inthe execution sequence.

A. Information hiding criteria
B. Conventional criteria
C. Data abstraction criteria
D. None of these
Answer» C. Data abstraction criteria
573.

______ is an orderly grouping of independent components linked togetheraccording to a plan to achieve a specific objective or goal.

A. System
B. Software
C. Subsystem
D. Physical system
Answer» B. Software
574.

Event-driven control systems are

A. These system runs on a single proce- ssor or an integrated group of processors
B. A system where each sub-system can respond to generated events where the events might be generated from other sub-systems or from the environment of the system.
C. A system continues in operation after some system faults have manifested themselves.
D. A system whose operation is incorrect, if results are not produced according to the timing specifications
Answer» C. A system continues in operation after some system faults have manifested themselves.
575.

Which one is not a Category of COCOMO-II?(

A. End User Programming
B. Infrastructure Sector
C. Requirement Sector
D. System Integration
Answer» D. System Integration
576.

In incremental process model, some high end function are desig

A. Construction framework
B. Modeling framework
C. Planning framework
D. Deployment framework
Answer» C. Planning framework
577.

Software implementation is

A. It is concern with modification of existing system to meet changing requirements.
B. It is a process of converting system specifications into an executable system.
C. It analyzes and checks system representation such as the requirements document, design diagrams and program source code.
D. None of these
Answer» C. It analyzes and checks system representation such as the requirements document, design diagrams and program source code.
578.

Software reliability is(

A. The probability of failure free operation of a program for a specified time in a specified environment
B. The probability of failure of a program for a specified time in a specified environment
C. The probability of success of a program for a specified time in any environment
D. None of the above
Answer» B. The probability of failure of a program for a specified time in a specified environment
579.

Client server architecture

A. It takes project, product hardware and personnel attributes into account when formulating a cost estimate.
B. In it server provides set of services and set of clients uses these services.
C. Extent to which standards are used to achieve interoperability.
D. None of these
Answer» C. Extent to which standards are used to achieve interoperability.
580.

Software validation is

A. Checking system conformations to its specifications
B. Developing system conformations to its specifications
C. Operating system
D. None of these
Answer» B. Developing system conformations to its specifications
581.

Which of the following is a requirement management activity?

A. Investigation
B. Design
C. Construction and Test
D. All of the mentioned
Answer» E.
582.

Restart is

A. Reason for a computer program to resume execution after a failure, using status and results recorded at a checkpoint.
B. Period of time in the software life cycle during which support for a software product is terminated.
C. The fault detection mechanism is initiated after the system state has been changed to check if a fault has occurred.
D. None of these
Answer» B. Period of time in the software life cycle during which support for a software product is terminated.
583.

What is MTTF?

A. Maximum time to failure
B. Mean time to failure
C. Minimum time to failure
D. None of the mentioned
Answer» C. Minimum time to failure
584.

Use of Email instead of post & telegraph is due to

A. Technology changes
B. Requirement changes
C. Users access
D. All the above
Answer» E.
585.

Taxonomy is

A. Classification scheme, which shows who object class is related to other class through common attributes and services
B. Standard modeling language, used for object oriented modeling
C. Set of tools to support software process
D. None of these
Answer» B. Standard modeling language, used for object oriented modeling
586.

Infrastructure software are covered under

A. Generic products
B. Customized products
C. Generic and Customized products
D. none of the above
Answer» B. Customized products
587.

MTBF stands for(

A. Mean time between failure
B. Maximum time between failures
C. Minimum time between failures
D. Many time between failures
Answer» B. Maximum time between failures
588.

An event driven control system, when an event is transmitted to each sub-system and each sub-system that handles that event responds to it is referred as

A. Broadcast model
B. Manager control model
C. Call-return control model
D. None of these
Answer» B. Manager control model
589.

Context diagram explains(

A. The overview of the system
B. The internal view of the system
C. The entities of the system
D. None of the above
Answer» B. The internal view of the system
590.

The outcome of construction phased can be treated as:(

A. Product release
B. Beta release
C. Alpha release
D. All of the above
Answer» C. Alpha release
591.

Software consists of(

A. Set of instructions + operating system
B. Programs + documentation + operating procedures
C. Programs + hardware manuals
D. Set of programs
Answer» C. Programs + hardware manuals
592.

Software Quality is(

A. Conformance to requirements
B. Fitness for the purpose
C. Level of satisfaction
D. All of the above
Answer» E.
593.

User documentation defines

A. Computer program
B. Computer system
C. Use of computer systems
D. Structure of computer system
Answer» D. Structure of computer system
594.

In Boehm’s spiral model, each loop in the spiral represents _____ of thesoftwa

A. phase
B. design
C. documentation
D. none of the above
Answer» B. design
595.

Which of the following term is best defined by the statement:”The ability to represent local and global data is an essential element of component-level design.”?

A. data representation
B. logic verification
C. “code-to” ability
D. automatic processing
Answer» B. logic verification
596.

In function point analysis, number of Complexity adjustment factor is(

A. 10
B. 20
C. 14
D. 12
Answer» D. 12
597.

Which of the following diagram is not supported by UML considering Data-driven modeling?

A. Activity
B. Data Flow Diagram (DFD)
C. State Chart
D. Component
Answer» C. State Chart
598.

Which of these terms have its role in project planning?

A. Schedule
B. Milestone
C. Estimation
D. All of the mentioned
Answer» E.
599.

Error location and repair is

A. System modeling process
B. System design process
C. System verification process
D. System decomposition process
Answer» D. System decomposition process
600.

Alpha testing is done by(

A. Customer
B. Tester
C. Developer
D. All of the above
Answer» B. Tester