Explore topic-wise MCQs in Testing Subject.

This section includes 657 Mcqs, each offering curated multiple-choice questions to sharpen your Testing Subject knowledge and support exam preparation. Choose a topic below to get started.

1.

-------------------is represented by organization chart.

A. Formal Information system
B. Closed system
C. MIS
D. DIS
Answer» B. Closed system
2.

Which one is not a step of requirement engineering?(

A. Requirements elicitation
B. Requirements analysis
C. Requirements design
D. Requirements documentation
Answer» D. Requirements documentation
3.

An Acquisition cycle time is

A. Unplanned events, which results in injury, damage to property, or to the environment
B. Quantitative measure of the magnitude of error
C. Period that starts when a system is considered and ends when the product meets its initial operational capability
D. All the above
Answer» D. All the above
4.

MTTF stands for(

A. Mean time to failure
B. Maximum time to failure
C. Minimum time to failure
D. None of the above
Answer» B. Maximum time to failure
5.

) Site for Beta testing is(

A. Software company
B. User’s site
C. Anywhere
D. All of the above
Answer» C. Anywhere
6.

Which model is most popular for student’s small projects?(

A. Waterfall model
B. Spiral model
C. Quick and fix model
D. Prototyping model
Answer» D. Prototyping model
7.

DD path graph is called as(

A. Design to Design Path graph
B. Defect to Defect Path graph
C. Destination to Destination Path graph
D. Decision to decision Path graph
Answer» E.
8.

In Data recording

A. Here data-flow diagram show, how data is processed at different stages in the system.
B. It registers all/ selected activities of a computer system.
C. Technique used to transform raw data into a more useful form.
D. Data is shifted to modern data base management system.
Answer» C. Technique used to transform raw data into a more useful form.
9.

___________ This module gets data from super-ordinate and forward it to sub-ordinates.

A. Afferent modules
B. Efferent modules
C. Co-ordinate modules
D. Transform modules.
Answer» C. Co-ordinate modules
10.

The system modeling is normally referred to

A. An abstract viewing of a system
B. The system running
C. Programming language
D. None of these
Answer» B. The system running
11.

CASE Tools

A. A measure of the amount of work a system can perform
B. It provides automated support for software process.
C. Support individual process tasks
D. Set of tools to support a particular phase of software process such as design, implementation or testing
Answer» D. Set of tools to support a particular phase of software process such as design, implementation or testing
12.

Analyst use ----------to learn about feelings, opinions and general experiences or to explorea process or problems.

A. open ended questionnaires
B. Close ended questionnaires
C. Record Inspection
D. Observation
Answer» B. Close ended questionnaires
13.

Which is not the part of scheduling process?

A. Creating project chart
B. Defining roles/activities
C. Estimating failures
D. Selling product
Answer» E.
14.

------- The compactness of the program in terms of lines of code.

A. Conciseness
B. Consistency
C. Data commonality
D. Error tolerance
Answer» B. Consistency
15.

Which one is functional component ?

A. Reliability
B. Maintainability
C. Computation
D. Performance
Answer» D. Performance
16.

Which of the following is not a business goal of re-engineering?

A. Cost reduction
B. Time reduction
C. Maintainability
D. None of the mentioned
Answer» E.
17.

)In Logarithmic Poisson execution model, ‘θ’ is known as(

A. Failure intensity function parameter
B. Failure intensity decay parameter
C. Failure intensity measurement
D. Failure intensity increment parameter
Answer» C. Failure intensity measurement
18.

--------------will be able to interface it with another system.

A. Correctness
B. Interoperability
C. Usability
D. Flexibility
Answer» B. Interoperability
19.

) McCall has developed a(

A. Quality model
B. Process improvement model
C. Requirement model
D. Design model
Answer» B. Process improvement model
20.

Conceptual models are useful for which of the following reasons?

A. Understanding problem design
B. Data Requirements and Product design
C. Validating requirements
D. All of the mentioned
Answer» E.
21.

)The relationship of data elements in a module is called(

A. Coupling
B. Cohesion
C. Modularity
D. None of the above
Answer» C. Modularity
22.

Modules with _______ must have good cohesion.

A. Factoring
B. Fan-in
C. Fan-out
D. System shape
Answer» C. Fan-out
23.

Hard real time systems are

A. These system runs on a single processor or an integrated group of processors
B. A system where each sub-system can respond to generated events where the events might be generated from other sub-systems or from the environment of the system.
C. A system continues in operation after some system faults have manifested themselves.
D. A system whose operation is incorrect, if results are not produced according to the timing specifications
Answer» E.
24.

Which of these software engineering activities are not a part of software processes?

A. Software dependence
B. Software development
C. Software validation
D. Software specification
Answer» B. Software development
25.

Extendibility is

A. Trustworthiness with which a system or component can be modified to increase its storage or functional capacity
B. Pertaining to a system/component that automatically places itself in a safe operating mode in the event of a failure.
C. Pertaining to a system or component that continues to provide partial operational capability in the event of certain failures.
D. None of these
Answer» B. Pertaining to a system/component that automatically places itself in a safe operating mode in the event of a failure.
26.

Software consists of

A. Computer program only
B. Computer program and associated documentations
C. Documentation only
D. Hardware
Answer» C. Documentation only
27.

----------system in one which automatically controls or modifies its own operation byresponding to data generated by the system itself.

A. Open System
B. Closed system
C. MIS
D. DIS
Answer» C. MIS
28.

--------The use of uniform design and documentation techniques throughout thesoftware development project.

A. Conciseness
B. Consistency
C. Data commonality
D. Error tolerance
Answer» C. Data commonality
29.

Estimation of size for a project is dependent on(

A. Cost
B. Schedule
C. Time
D. None of the above
Answer» E.
30.

Mutable requirements are

A. Requirements that change due to the environment in which the organization is operating
B. Emerges due to user’s understanding of system
C. Dependent on particular system
D. None of these
Answer» B. Emerges due to user’s understanding of system
31.

Which one is not the generic process model ?

A. Waterfall model
B. Evolutionary development
C. Re-use oriented development
D. Marketing model
Answer» E.
32.

The objective of software engineering is to produce ----------

A. Software Product
B. Output
C. Input
D. Processing
Answer» B. Output
33.

In iterative process model, software process represents

A. Sequential activities
B. Cycle of activities
C. Random activities
D. None of these
Answer» C. Random activities
34.

The Linear Sequential or Classic Life Cycle is also ca

A. Waterfall Model
B. Incremental Model
C. Spiral model
D. Prototyping Model
Answer» B. Incremental Model
35.

Components such as wheel, chain, handle etc are assembled to produce bicycle. The use of bicycle as transportation device is considered to be

A. Functional property
B. Non-functional property
C. Software system
D. None of these
Answer» B. Non-functional property
36.

Represents the number of discrete levers in the inheritance tree where subclasses inherit attributes and operations from super classes.

A. Depth of inheritance tree
B. Breath of inheritance tree
C. Radius of inheritance tree
D. None of these Fan- out is referred to
Answer» B. Breath of inheritance tree
37.

Software design activities involved

A. System programming
B. System operations
C. Component design
D. Component development
Answer» D. Component development
38.

As the reliability increases, failure intensity(

A. decreases
B. increases
C. no effect
D. None of the above
Answer» B. increases
39.

The term module used during design phase refers to(

A. Function
B. Procedure
C. Sub program
D. All of the above
Answer» E.
40.

-------------systems used organizational data as well as external data collected fromenvironment of the organization.

A. Formal Information system
B. Closed system
C. MIS
D. DSS
Answer» E.
41.

Maintenance plan describes

A. Quality procedure
B. Schedule procedure
C. Maintenance procedure
D. Configuration procedure
Answer» D. Configuration procedure
42.

A module has _______if there is some logical relationship in the elements of a module.

A. Logical cohesion
B. Temporal cohesion
C. Both A And B
D. None of these
Answer» B. Temporal cohesion
43.

What fails a project?

A. Lack of anticipation of resources to accomplish tasks
B. Problems faced by rules governing project
C. All of the mentioned
D. None of the mentioned
Answer» D. None of the mentioned
44.

Which of the following is a type of software?(

A. System Software
B. Embedded Software
C. Application
D. all of the above
Answer» B. Embedded Software
45.

RAD Model ha

A. 2 phases
B. 3 phase
C. 5 phases
D. 6 phases
Answer» D. 6 phases
46.

Which one is not be structured design model ?

A. Data flow model
B. Entity relation model
C. Object-oriented model
D. Debugging
Answer» E.
47.

Software process involves

A. Software specification and developments
B. Software validation and evolution
C. A and B both
D. None of these
Answer» D. None of these
48.

The term user requirements

A. Are statements, made in natural language and diagrams of services that system is expected to provide and the constrains on the system
B. The system services and details, can serve as contract between buyer and software developers
C. An abstract description of software design
D. None of these
Answer» B. The system services and details, can serve as contract between buyer and software developers
49.

Software safety is equivalent to software reliability.

A. True
B. False
C. none
D. all
Answer» C. none
50.

The DFD depicts(

A. Flow of data
B. Flow of control
C. Both (a) & (b)
D. None of the above
Answer» B. Flow of control