

MCQOPTIONS
Saved Bookmarks
This section includes 4 Mcqs, each offering curated multiple-choice questions to sharpen your Railway Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
What can be the remedial measure adopted for track level variations due to inadequate drainage due to high cess? |
A. | Improving side drainage by lowering the cess |
B. | Treatment with lime slurry pressure injection |
C. | Cement grouting |
D. | Cationic bituminous emulsion below ballast |
Answer» B. Treatment with lime slurry pressure injection | |
2. |
What can be done to reduce creep of soil? |
A. | Providing turfing |
B. | Providing mats |
C. | Providing side berms |
D. | Cement grouting |
Answer» D. Cement grouting | |
3. |
What is obtained to get an idea of the Track maintainability? |
A. | Number of visits to track |
B. | Site details |
C. | Ballast penetration profiles |
D. | History of affected section |
Answer» B. Site details | |
4. |
Which of the following is not included in the data regarding the history of the affected section? |
A. | Method of Construction |
B. | Date of opening to Traffic |
C. | Drainage conditions |
D. | Speed restrictions |
Answer» D. Speed restrictions | |