1. |
What can be the remedial measure adopted for track level variations due to inadequate drainage due to high cess? |
A. | Improving side drainage by lowering the cess |
B. | Treatment with lime slurry pressure injection |
C. | Cement grouting |
D. | Cationic bituminous emulsion below ballast |
Answer» B. Treatment with lime slurry pressure injection | |