1.

What can be the remedial measure adopted for track level variations due to inadequate drainage due to high cess?

A. Improving side drainage by lowering the cess
B. Treatment with lime slurry pressure injection
C. Cement grouting
D. Cationic bituminous emulsion below ballast
Answer» B. Treatment with lime slurry pressure injection