1. |
Solidification of HW is done at TSDF to reduce ________ |
A. | Area |
B. | Volume |
C. | Analysis |
D. | Record keeping |
Answer» C. Analysis | |
2. |
The design of TSDF facilities should follow __________ guidelines. |
A. | CPCB |
B. | PCB |
C. | SPCB |
D. | LPCB |
Answer» B. PCB | |
3. |
External safety audit at an incinerator facility is carried out once in _____ year. |
A. | 1 |
B. | 2 |
C. | 3 |
D. | 4 |
Answer» C. 3 | |
4. |
Storage of incinerable hazardous waste at the site is ______ months. |
A. | 2 |
B. | 4 |
C. | 6 |
D. | 8 |
Answer» D. 8 | |
5. |
What type of waste does Subtitle D of RCRA regulate? |
A. | Solid hazardous waste |
B. | Chemical hazardous waste |
C. | Non-hazardous solid waste |
D. | D. Radioactive waste |
Answer» D. D. Radioactive waste | |
6. |
Transporters of hazardous waste does not require RCRA permit. |
A. | True |
B. | False |
Answer» B. False | |
7. |
Permits are typically granted for a period up to ____ years. |
A. | 7 |
B. | 8 |
C. | 9 |
D. | 10 |
Answer» E. | |
8. |
RCRA permits require facilities to develop emergency plans. |
A. | False |
B. | True |
Answer» C. | |
9. |
TSDFs has to obtain permission in the form of ___________ permit. |
A. | CERCLA |
B. | SARA |
C. | RCRA |
D. | HPL |
Answer» D. HPL | |
10. |
The unit-specific design is required to __________ |
A. | Prevent the release of HW |
B. | Good housekeeping |
C. | Analysis |
D. | Export activities |
Answer» B. Good housekeeping | |
11. |
The final step in RCRA s cradle-to-grave concept is ___________ |
A. | Disposal |
B. | TSDF |
C. | STDF |
D. | TSFF |
Answer» C. STDF | |