101.

The cubic meters of water that can be stored in an irrigation tank between full tank level and sill level of the lowest supply sluice is known as __________________

A. the gross capacity
B. effective capacity
C. the specific capacity
D. total capacity
Answer» C. the specific capacity
102.

Which among the following is a correct representation of Ryve’s formula?

A. Qₚ = C₁. A^2/3
B. Qₚ = C₁. A^1/3
C. Qₚ = C₁. L A^2/3
D. Qₚ = C₁. A
Answer» B. Qₚ = C₁. A^1/3
103.

While planning a water supply reservoir as compared to an irrigation reservoir the design yield may be kept __________________

A. higher
B. lower
C. equal
D. lower or higher as per designers discretion
Answer» C. equal
104.

A flow duration curve is a curve plotted between ________________

A. Accumulated flow v/s time
B. Discharge v/s time
C. (Cumulative Inflow – Cumulative Outflow) v/s time
D. Streamflow v/s Percent of time the flow is equaled or exceeded
Answer» E.
105.

The dead storage in a dam reservoir is the available volume for collection of silt and sediment between _______________

A. bed level of the reservoir and minimum reservoir level
B. bed level of the reservoir and the silt level in the reservoir
C. bed level of the reservoir and the normal pool level
D. above the minimum pool level
Answer» B. bed level of the reservoir and the silt level in the reservoir
106.

In what reaches the river flows in a zigzag manner?

A. Boulder River Stage
B. Lower Reaches
C. Degrading
D. Tidal Rivers
Answer» C. Degrading
107.

What type of river stage widens the bed?

A. Degrading
B. Incised River Stage
C. Boulder River Stage
D. Stable Type
Answer» D. Stable Type
108.

In the meandering process on which side of the bank erosion takes place?

A. Convex Side
B. Bottom of the River
C. Concave Side
D. Due to Sediment Load
Answer» D. Due to Sediment Load
109.

Into how many groups the rivers in floodplains can further be divided?

A. 5
B. 6
C. 4
D. 3
Answer» B. 6
110.

Into how many groups rivers in India are divided?

A. 3
B. 2
C. 4
D. 5
Answer» C. 4
111.

A river before joining the sea or ocean gets divided into branches.

A. True
B. False
C. May be True or False
D. Can't say
Answer» B. False
112.

A river which does not change its alignment, slope is called a stable river.

A. True
B. False
C. May be True or False
D. Can't say
Answer» B. False
113.

In which type of river building up of slope is present?

A. Deltaic
B. Stable type
C. Degrading Type
D. Aggrading Type
Answer» E.
114.

What is the shape of cross section of a straight reach?

A. Rectangular
B. Circular
C. Trough
D. Trapezoidal
Answer» D. Trapezoidal
115.

Meandering of the river causes some serious problems.

A. True
B. False
C. May be True or False
D. Can't say
Answer» B. False
116.

What is the main aim of mean water training?

A. Effective Disposal of Suspended and Bed Loads
B. To Constant Velocity
C. Flood Control
D. Provide Sufficient Water Depth
Answer» B. To Constant Velocity
117.

River training works are undertaken for effective disposal of floods and sediment loads.

A. True
B. False
C. May be True or False
D. Can't say
Answer» B. False
118.

Which category of river training work deals with flood control?

A. Training for Sediment
B. Low Water Training
C. Training for Depth
D. Training for Discharge
Answer» E.
119.

Which of the following method does not give more than 3% error in the determination of the capacity of a reservoir?

A. Prismoidal formula
B. Trapezoidal method
C. Average formula
D. Integration method
Answer» E.
120.

Where are shoals formed in a bend in a river?

A. Concave Side
B. Convex Side
C. Middle Section of the River
D. At the Bottom of the River Bed
Answer» C. Middle Section of the River
121.

The area-elevation curve when integrated will yield the capacity-elevation curve.

A. True
B. False
C. May be True or False
D. Can't say
Answer» B. False
122.

Average yield of a storage reservoir is the arithmetic average of its ________________

A. firm yields over a long period
B. secondary yields over a long period
C. firm and secondary yields over a long period
D. reservoir yield over a long period
Answer» D. reservoir yield over a long period
123.

Which of the following is known as a debris dam?

A. Storage dam
B. Detention dam
C. Diversion dam
D. Rigid dam
Answer» C. Diversion dam
124.

Which project ranks first in the man-power utilization among the gigantic projects of its own kind in the world?

A. Nagarjuna Sagar Project
B. Bhakra Nangal Project
C. Damodar Valley Project
D. Indira Gandhi Canal
Answer» B. Bhakra Nangal Project
125.

Lock and dams constructions for creation of a series of slack-water pools along a river for promoting its navigability is adopted only when ________________________

A. the river is perennial
B. the river carries heavy sediment load
C. the available water in the river is quite less
D. the available water in the river is quite large
Answer» D. the available water in the river is quite large
126.

Which foundation suggests the adoption of an earth dam or very low gravity dam?

A. Solid rock foundation
B. Gravel foundation
C. Silt and fine sand foundation
D. Clay foundation
Answer» D. Clay foundation
127.

The temporary structures that are built to enclose certain worksite is ______________

A. storage dam
B. coffer dam
C. timber dam
D. steel dam
Answer» C. timber dam
128.

The dredger which excavates sand deposits of a river and discharges the excavated material with water over long distances is called a _________________

A. ladder dredger
B. suction dredger
C. dipper dredger
D. upper dredger
Answer» C. dipper dredger
129.

Projecting collars are provided on sides of a rectangular tunnel of length L made through an earthen dam to increase the seepage path. Their projection length (X) and numbers (N) are decided so as to provide increased seepage path equal to 2NX where 2NX should generally be ______________________

A. greater than L/4
B. greater than L/3
C. greater than L/2
D. greater than L
Answer» B. greater than L/3
130.

The capacity-inflow ratio for a reservoir _________________

A. is a constant factor overtime
B. increases with time
C. decreases with time
D. may increase or decrease with time
Answer» D. may increase or decrease with time
131.

If A₁ represents the area of a tank bed at bottom and A₂ is the area of the tank at F.T.L, then the storage capacity of the tank of height H is given as ________________________

A. H [A₁ + A₂ + A₁.A₂]
B. H/2 [A₁ + A₂ + A₁.A₂]
C. H/3 [A₁ + A₂ + A₁.A₂]
D. 2H [A₁ + A₂ + A₁.A₂]
Answer» D. 2H [A₁ + A₂ + A₁.A₂]
132.

Into how many groups groynes are classified according to the function they serve?

A. 2
B. 4
C. 3
D. 5
Answer» C. 3
133.

Groynes can be used with other training works depending upon the purpose they are used for.

A. True
B. False
C. May be True or False
D. Can't say
Answer» B. False
134.

Which of the following is the only modern dam that has failed?

A. Koyna dam in India
B. Vega de Tera dam in Spain
C. Mauvoision dam in Switzerland
D. Trinity dam in California, USA
Answer» C. Mauvoision dam in Switzerland
135.

Aswan dam on Nile River in Egypt was perhaps the first modern dam of the world. Its construction was completed in the year _________

A. 1664
B. 1798
C. 1902
D. 1931
Answer» D. 1931
136.

Which of the following is the highest stone masonry gravity dam of India as well as of the world?

A. Ramganga dam
B. Nagarjuna Sagar dam
C. Hirakud dam
D. Mettur dam
Answer» B. Nagarjuna Sagar dam
137.

The maximum level to which the water rises during the worst design flood is known as _________________________

A. full Reservoir level
B. maximum conservation level
C. minimum pool level
D. surcharge storage
Answer» B. maximum conservation level
138.

In general practice adopted for capacity computations is to actually survey the site contours only at vertical distances of __________________

A. 5 m or more
B. Less than 5 m
C. 0.5 m or more
D. Less than 0.5 m
Answer» B. Less than 5 m
139.

The usual difference between F.T.L and M.T.L is rarely allowed to exceed _____________

A. 0.3 m
B. 0.6 m
C. 0.9 m
D. 0.5 m
Answer» D. 0.5 m
140.

Which of the following dredger is not suitable for rocky or boulder river reaches?

A. Suction dredger
B. Ladder dredger
C. Dipper dredger
D. Both ladder and dipper dredger
Answer» B. Ladder dredger
141.

A hydel power project has been envisaged to serve the water supply and irrigation needs of the area at its inception stage. The dam reservoir so constructed is known as __________________

A. multipurpose reservoir
B. single-purpose reservoir
C. distribution reservoir
D. retarding reservoir
Answer» B. single-purpose reservoir
142.

How types of methods are adopted for the training of rivers?

A. 7
B. 8
C. 5
D. 6
Answer» B. 8
143.

The lowest portion of the capacity-elevation curve of a proposed irrigation reservoir draining 20 km² of catchment is represented by the following data:i. The rate of silting for the catchment = 300 m³ / km² / yearii. Life of the reservoir = 50 yearsiii. Dead storage = 30iv. The FSD of the canal at the head = 80 cmv. The crop water requirement = 250 ha.mvi. Dependable yield of the catchment = 0.29 mCalculate the gross capacity of the reservoir.

A. 287.5 ha.m
B. 317.5 ha.m
C. 580 ha.m
D. 37.5 ha.m
Answer» C. 580 ha.m
144.

Which structures are best suited to resist earthquake shocks without danger?

A. Earthen dams
B. Concrete gravity dams
C. Timber dam
D. Both earthen and concrete gravity dams
Answer» E.
145.

How types of groynes are there?

A. 4
B. 2
C. 3
D. 5
Answer» C. 3
146.

Which of the following intake structure is widely used in small works?

A. Sluiceways
B. Simple submerged intakes
C. Wet intake towers
D. Dry intake towers
Answer» C. Wet intake towers
147.

What are the types of flood control reservoirs?

A. Multipurpose reservoir and Single purpose reservoir
B. Storage reservoir and retarding reservoirs
C. Distribution reservoir and Storage reservoir
D. Distribution reservoir and multipurpose reservoir
Answer» C. Distribution reservoir and Storage reservoir
148.

Which of the following type of tank weirs are provided with a number of vertical steps instead of horizontal or sloping downstream apron?

A. Type A: Masonry weir with a vertical drop
B. Type B: Rock-fill weirs with a sloping apron
C. Type C: Masonry weirs with a glacis
D. Type D: Combination of Type A and Type C
Answer» E.
149.

In which type of river there is a reduction of the available slope?

A. Braided
B. Stable Type
C. Aggrading Type
D. Degrading Type
Answer» E.
150.

A sequent peak algorithm is a plot between __________________

A. Accumulated flow v/s time
B. Discharge v/s time
C. (Cumulative Inflow – Cumulative Outflow) v/s time
D. Mass outflow v/s time
Answer» E.