| 1. |
In water bound macadam roads, binding material is Brick dust. |
| A. | True |
| B. | False |
| Answer» C. | |
| 2. |
An impermeable layer is provided at the bed and sides of canal to improve the life and discharge capacity of canal known as ______________ |
| A. | canal modification |
| B. | canal concreting |
| C. | canal lining |
| D. | canal regulation |
| Answer» D. canal regulation | |
| 3. |
The kind of canal section involved in irrigation work is __________ |
| A. | canal high in embankment in partly in excavation |
| B. | canal partly in excavation and partly in embankment |
| C. | canal less in embankment |
| D. | canal half in excavation |
| Answer» C. canal less in embankment | |