 
			 
			MCQOPTIONS
 Saved Bookmarks
				This section includes 10 Mcqs, each offering curated multiple-choice questions to sharpen your Surveying knowledge and support exam preparation. Choose a topic below to get started.
| 1. | Which of the following involves in the sequence of rocky strata? | 
| A. | Marking profile | 
| B. | Placing rocks | 
| C. | Improving foul gases | 
| D. | Recording values | 
| Answer» B. Placing rocks | |
| 2. | Which of the following can act as an alternative for blasting? | 
| A. | Tunneling | 
| B. | Continuous blasting | 
| C. | Sequential blasting | 
| D. | Fire-setting | 
| Answer» E. | |
| 3. | Which method can be adopted in case of rock tunneling? | 
| A. | Full face method | 
| B. | Benching | 
| C. | Tracing | 
| D. | Back bearing method | 
| Answer» B. Benching | |
| 4. | A steel cylinder which is pushed in the soft soil is determined as ________ | 
| A. | Jar born | 
| B. | Shield | 
| C. | Rod | 
| D. | Pole | 
| Answer» C. Rod | |
| 5. | Among the following, which can be adopted for providing support for soft strata? | 
| A. | Bents of aluminum | 
| B. | Bents of iridium | 
| C. | Bents of steel | 
| D. | Bents of plastic | 
| Answer» D. Bents of plastic | |
| 6. | Which method can be adopted if full face excavation is not possible? | 
| A. | Back bearing method | 
| B. | Plotting | 
| C. | Trenching | 
| D. | Benching | 
| Answer» E. | |
| 7. | Among the following, which doesn t belong to tunnel classification? | 
| A. | Firm ground | 
| B. | Running ground | 
| C. | Rocky ground | 
| D. | Soft ground | 
| Answer» D. Soft ground | |
| 8. | Which of the following should be considered while aligning a tunnel? | 
| A. | Atmospheric conditions | 
| B. | Hydrological conditions | 
| C. | Climatic conditions | 
| D. | Surface limits | 
| Answer» C. Climatic conditions | |
| 9. | The line at which the tunnel wall breaks from sloping outward can be given as _________ | 
| A. | Spring line | 
| B. | Oval line | 
| C. | Centre line | 
| D. | Middle line | 
| Answer» B. Oval line | |
| 10. | Tunneling is required in case of ____________ | 
| A. | Laying pavement | 
| B. | Laying road | 
| C. | On ground passage | 
| D. | Underground passage | 
| Answer» E. | |