This section includes 176 Mcqs, each offering curated multiple-choice questions to sharpen your Mechanical Engineering Questions knowledge and support exam preparation. Choose a topic below to get started.
101. |
The most important objective behind plant layout is_____________________? |
A. | overall simplification, safety of integration |
B. | economy in space |
C. | maximum travel time in plant |
D. | to provide conveniently located shops |
E. | to avoid any bottlenecks |
Answer» B. economy in space | |
102. |
The main disadvantage of line organisation is_________________? |
A. | top level executives have to do excessive work |
B. | structure is rigid |
C. | communication delays occur |
D. | all of the above |
E. | none of the above |
Answer» E. none of the above | |
103. |
A low unit cost can be obtained by following____________________? |
A. | product layout |
B. | functional layout |
C. | automatic material handling equipment |
D. | specialisation of operation |
E. | minimum travel time plan and com¬pact layout |
Answer» B. functional layout | |
104. |
Process layout is employed for_________________? |
A. | batch production |
B. | continuous type of product |
C. | effective utilisation of machines |
D. | all of the above |
E. | none of the above |
Answer» B. continuous type of product | |
105. |
Travel charts provide__________________? |
A. | an idea of the flow of materials at various stages |
B. | a compact estimate of the handling which must be done between various work sections |
C. | the information for changes required in rearranging material handling equipment |
D. | an approximate estimate of the handling which must be done at a particular station |
E. | solution to handling techniques to achieve most optimum^ results |
Answer» C. the information for changes required in rearranging material handling equipment | |
106. |
Gnatt charts are used for_________________? |
A. | forecasting sales |
B. | production schedule |
C. | scheduling and routing |
D. | linear programming |
E. | none of the above |
Answer» C. scheduling and routing | |
107. |
Motion study involves analysis of________________? |
A. | actions of operator |
B. | layout of work place |
C. | tooling and equipment |
D. | all of the above |
E. | none of the above |
Answer» B. layout of work place | |
108. |
In inventory control, the economic order quantity is the_________________? |
A. | optimum lot size |
B. | highest level of inventory |
C. | lot corresponding to break-even point |
D. | capability of a plant to produce |
E. | none of the above |
Answer» B. highest level of inventory | |
109. |
Gnatt charts provide information about_____________? |
A. | break even point analysis |
B. | production schedule |
C. | material handling layout |
D. | determining selling price |
E. | value analysis |
Answer» C. material handling layout | |
110. |
Which of the following layouts is suited for mass production_________________? |
A. | process layout |
B. | product layout |
C. | fixed position layout |
D. | plant layout |
E. | functional layout |
Answer» C. fixed position layout | |
111. |
The employees provident fund act is applicable to________________? |
A. | all industries |
B. | all industries other than small and medium industries |
C. | volunteers |
D. | the industries notified by Government |
E. | all major industries |
Answer» E. all major industries | |
112. |
In the Halsey 50-50 plan, the following are rewarded more___________________? |
A. | past good workers |
B. | past poor workers |
C. | past average workers |
D. | all of the above |
E. | none of the above |
Answer» C. past average workers | |
113. |
Pick up the incorrect statement about advantages of work sampling_________________? |
A. | permits a fine breakdown of activities and delays |
B. | simultaneous study of many operators may be made by a single observer |
C. | calculations are easier, method is economical and less time consuming |
D. | no time measuring devices are generally needed |
E. | as operators are not watched for long periods, chances of obtaining misleading results are less |
Answer» B. simultaneous study of many operators may be made by a single observer | |
114. |
Micromotion study is__________________? |
A. | enlarged view of motion study |
B. | analysis of one stage of motion study |
C. | minute and detailed motion study |
D. | subdivision of an operation into therbligs and their analysis |
E. | motion study of small components upto mirco-seconds |
Answer» E. motion study of small components upto mirco-seconds | |
115. |
Material handling and plant location is analysed by________________? |
A. | Gnatt chart |
B. | bin chart |
C. | Emerson chart |
D. | travel chart |
E. | activity chart |
Answer» E. activity chart | |
116. |
In Lincoln plan (one type of group incentive plan), the amount of the profit which an .employee receives in addition to the guaranteed basic _________________?
|
A. | a standard rating system |
B. | a merit rating system |
C. | a job evaluation system |
D. | his individual performance |
E. | all of the above |
Answer» C. a job evaluation system | |
117. |
‘Value’ for value engineering and analysis purposes is defined as_____________________? |
A. | purchase value |
B. | saleable value |
C. | depreciated value |
D. | present worth |
E. | function/cost |
Answer» F. | |
118. |
Graphical method, simplex method, and transportation method are concerned with__________________? |
A. | break-even analysis |
B. | value analysis |
C. | linear programming |
D. | queing theory |
E. | tnaterial handling |
Answer» D. queing theory | |
119. |
CPM has following time estimate__________________ |
A. | one time estimate |
B. | two time estimate |
C. | three time estimate |
D. | four time estimate |
E. | nil time estimate |
Answer» B. two time estimate | |
120. |
Tick the odd man out_______________? |
A. | Taylor |
B. | Drucker |
C. | McGregor |
D. | Galileo |
E. | Parkinson |
Answer» E. Parkinson | |
121. |
Routing is essential in the following type of industry_________________? |
A. | assembly industry |
B. | process industry |
C. | job order industry |
D. | mass production industry |
E. | steel industry |
Answer» B. process industry | |
122. |
Queuing theory deals with problems of________________? |
A. | material handling |
B. | reducing the waiting time or idle Jajme |
C. | better utilization of man services |
D. | effective use of machines |
E. | none of the above |
Answer» C. better utilization of man services | |
123. |
For ship vessel industry the following layout is best suited_________________? |
A. | process layout |
B. | product layout |
C. | fixed position layout |
D. | plant layout |
E. | functional layout |
Answer» D. plant layout | |
124. |
The objective of time study is to determine the time required to complete a job by_______________? |
A. | fast worker |
B. | average worker |
C. | slow worker |
D. | new entrant |
E. | any one of the above |
Answer» C. slow worker | |
125. |
According to MAPI formula, the old machine should be replaced by new one when_____________? |
A. | CAM < DAM |
B. | CAM > DAM |
C. | CAM = DAM |
D. | there is no such criterion |
E. | none of the above |
Answer» B. CAM > DAM | |
126. |
Standing orders which are statutory are applicable to__________________? |
A. | all industries |
B. | all process industries and thermal power plants |
C. | only major industries |
D. | only key industries |
E. | all industries employing more than 100 workers |
Answer» F. | |
127. |
The deductions for, employees provident fund start________________? |
A. | immediately on joining the service |
B. | after 60 days of joining the service |
C. | after 100 days of joining the service |
D. | after 240 days of joining the service |
E. | after one year of joining the service |
Answer» E. after one year of joining the service | |
128. |
Value engineering aims at finding out the________________? |
A. | depreciation value of a product |
B. | resale value of a product |
C. | major function of the item and accomplishing the same at least cost without change in quality |
D. | break even point when machine re-quires change |
E. | selling price of an item |
Answer» D. break even point when machine re-quires change | |
129. |
Which of the following organisation is preferred in automobile industry________________? |
A. | functional organisation |
B. | line organisation |
C. | staff organisation |
D. | line and staff organisations |
E. | scalar organisation |
Answer» E. scalar organisation | |
130. |
String diagram is used_________________? |
A. | for checking the relative values of various layouts |
B. | when a group of workers are working at a place |
C. | where processes require the operator to be moved from one place to another |
D. | all of the above |
E. | none of the above |
Answer» E. none of the above | |
131. |
The technique of value analysis can be applied to____________________? |
A. | complicated items only |
B. | simple items only |
C. | crash programmer items only |
D. | cost consciousness items only |
E. | any item |
Answer» F. | |
132. |
The appellate authority for an industrial dispute is________________? |
A. | management |
B. | labour court |
C. | high court/supreme court |
D. | board of directors |
E. | president |
Answer» D. board of directors | |
133. |
Father of industrial engineering is_________________? |
A. | Jeck Gilberth |
B. | Gnatt |
C. | Taylor |
D. | Newton |
E. | none of the above |
Answer» C. Taylor | |
134. |
In steel plant the most important system for materials handling is_____________________? |
A. | conveyors |
B. | cranes and hoists |
C. | trucks |
D. | locos |
E. | none of the above |
Answer» E. none of the above | |
135. |
The most popular type of organisation used for Civil Engineering Constructions is_________________? |
A. | line organisation |
B. | line and staff organisation |
C. | functional organisation |
D. | effective organisation |
E. | none of the above |
Answer» B. line and staff organisation | |
136. |
Frederick W. Taylor introduced a system of working known as________________? |
A. | line organisation |
B. | line and staff organisation |
C. | functional organisation |
D. | effective organisation |
E. | none of the above |
Answer» D. effective organisation | |
137. |
Work sampling observations are taken on the basis of_______________? |
A. | detailed calculations |
B. | convenience |
C. | table of random numbers |
D. | past experience |
E. | fixed percentage of daily production |
Answer» D. past experience | |
138. |
Basic motion time study gives times for basic motions in ten thousandths of_______________? |
A. | second |
B. | minute |
C. | hour |
D. | day |
E. | none of the above |
Answer» C. hour | |
139. |
String diagram is used when__________________? |
A. | team of workers is working at a place |
B. | material handling is to be done |
C. | idle time is to be reduced |
D. | all of the above |
E. | none of the above |
Answer» B. material handling is to be done | |
140. |
TMU in method time measurement stands for__________________? |
A. | time motion unit |
B. | time measurement unit |
C. | time movement unit |
D. | technique measurement unit |
E. | time method unit |
Answer» C. time movement unit | |
141. |
Micro motion study is__________________? |
A. | analysis of a man-work method by using a motion picture camera with a timing device in the field of view |
B. | motion study* observed on enhanced time intervals |
C. | motion study of a sequence of operations conducted systematically |
D. | study of man and machine conducted simultaneously |
E. | scientific, analytically procedure for determining optimum work method |
Answer» B. motion study* observed on enhanced time intervals | |
142. |
The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as_________________? |
A. | Rowan Plan |
B. | Bedaux Plan |
C. | Taylor Differential Piece rate system |
D. | Halsey Premium plan |
E. | Day work plan |
Answer» E. Day work plan | |
143. |
What does symbol ‘V’ employ in work study________________? |
A. | operation |
B. | inspection |
C. | delay/ temporary Storage |
D. | permanent storage |
E. | none of the above |
Answer» E. none of the above | |
144. |
Work study is concerned with_________________? |
A. | improving present method and finding standard time |
B. | motivation of workers |
C. | improving production capability |
D. | improving production planning and control |
E. | all of the above |
Answer» B. motivation of workers | |
145. |
What does symbol ‘O’ imply in work study________________? |
A. | operation |
B. | inspection |
C. | transport |
D. | delay/temporary storage |
E. | none of the above |
Answer» B. inspection | |
146. |
A big advantage of PERT over Gantt charts is that in the former case_________________? |
A. | activities and events are clearly shown |
B. | early start and late finish of an activity are clearly marked |
C. | activity times are clear |
D. | critical path can be easily determined |
E. | inter-relationship among activities is clearly shown |
Answer» F. | |
147. |
The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as_________________? |
A. | Dry work Plan |
B. | Halsey Premium Plan |
C. | Taylor Plan |
D. | Bedaux Plan |
E. | Rowan Plan |
Answer» F. | |
148. |
Slack represents the difference between the___________________? |
A. | latest allowable time and the normal expected time |
B. | latest allowable time and the earliest expected time |
C. | proposed allowable time and the earliest expected time |
D. | normal allowable time and the latest expected time |
E. | project initiation tune and actual starting time |
Answer» C. proposed allowable time and the earliest expected time | |
149. |
PMTP (predetermined motion time systems) include___________________? |
A. | MTM (method time measurement) |
B. | WFS (work factor systems) |
C. | BNTS (basic motion time study) |
D. | all of the above |
E. | none of the above |
Answer» E. none of the above | |
150. |
Pessimistic time is___________________? |
A. | the maximum time which an activity might require |
B. | the average time required for a job |
C. | the most probable time considering all conditions |
D. | the minimum time in which an activity can possibly be accomplished |
E. | the earliest finish |
Answer» B. the average time required for a job | |