1. |
In Hoyer’s system the projection of plugs left in concrete exceeds beyond ___________ |
A. | Middle of member |
B. | End of member |
C. | First of member |
D. | Transfer part of member |
Answer» C. First of member | |
2. |
The Hoyer’s system of prestressing proves to be economical for ___________ |
A. | Pre tensioning system |
B. | Post tensioning system |
C. | Beam casting |
D. | Bed casting |
Answer» C. Beam casting | |
3. |
Hoyer’s system of pretensioning can be done for beams. |
A. | 1 |
B. | More than 2 |
C. | Less than 2 |
D. | 2 |
Answer» C. Less than 2 | |
4. |
The Hoyer’s method of prestressing is done by ___________ |
A. | Pulling out of wires |
B. | Pushing wires |
C. | Heating of wires |
D. | Stressing of wires |
Answer» B. Pushing wires | |
5. |
The bond of prestressing wires in Hoyer’s system can be formed by ___________ |
A. | Helical crimping |
B. | Tangential crimping |
C. | Circular crimping |
D. | Diode crimping |
Answer» B. Tangential crimping | |
6. |
The transfer of prestress of concrete is achieved by ___________ |
A. | Plates |
B. | Rings |
C. | Steel bars |
D. | Jacks |
Answer» E. | |
7. |
Hoyer’s system of pre tensioning is generally adopted for ___________ |
A. | Small scale members |
B. | Large scale members |
C. | Middle span members |
D. | End members |
Answer» C. Middle span members | |
8. |
The tendons in the pretensioning system are tensioned between ___________ |
A. | Rigid anchorages |
B. | Hydraulic jacks |
C. | Concrete beds |
D. | Variable beams |
Answer» B. Hydraulic jacks | |
9. |
THE_HOYER‚ÄÖ√Ñ√∂‚ÀÖ√Ë‚ÀÖ¬•S_SYSTEM_OF_PRESTRESSING_PROVES_TO_BE_ECONOMICAL_FOR:?$# |
A. | Pre tensioning system |
B. | Post tensioning system |
C. | Beam casting |
D. | Bed casting |
Answer» C. Beam casting | |
10. |
In_Hoyer’s_system_the_projection_of_plugs_left_in_concrete_exceeds_beyond:$# |
A. | Middle of member |
B. | End of member |
C. | First of member |
D. | Transfer part of member |
Answer» C. First of member | |
11. |
The Hoyer’s system of pretensioning can be done for beams?# |
A. | 1 |
B. | More than 2 |
C. | Less than 2 |
D. | 2 |
Answer» C. Less than 2 | |
12. |
The Hoyer’s method of prestressing is done by:$ |
A. | Pulling out of wires |
B. | Pushing wires |
C. | Heating of wires |
D. | Stressing of wires |
Answer» B. Pushing wires | |
13. |
The bond of prestressing wires in Hoyer’s system can be formed by:$ |
A. | Helical crimping |
B. | Tangential crimping |
C. | Circular crimping |
D. | Diode crimping |
Answer» B. Tangential crimping | |
14. |
The transfer of prestress of concrete is achieved by: |
A. | Plates |
B. | Rings |
C. | Steel bars |
D. | Jacks |
Answer» E. | |
15. |
Hoyer’s system of pre tensioning is generally adopted for:$ |
A. | Small scale members |
B. | Large scale members |
C. | Middle span members |
D. | End members |
Answer» C. Middle span members | |
16. |
Which is one of the systems used for pretensioning? |
A. | Magnel-Balton system |
B. | Freyssinet system |
C. | Gifford-Udall system |
D. | Hoyer’s long line method |
Answer» E. | |
17. |
When the concrete attains sufficient strength, which elements are released? |
A. | Jacks |
B. | Casting bed |
C. | Tendons |
D. | Beams |
Answer» B. Casting bed | |
18. |
The tendons in the pretensioning system are tensioned between: |
A. | Rigid anchorages |
B. | Hydraulic jacks |
C. | Concrete beds |
D. | Variable beams |
Answer» B. Hydraulic jacks | |