1. |
Calculate spacing of a prestressed concrete T slab using 12mm diameter of two legged stirrups such that fc is 415, vcw = 1900kn, balance shear is 934 103? |
A. | 165kn |
B. | 345kn |
C. | 230kn |
D. | 450kn |
Answer» B. 345kn | |
2. |
Calculate the slope angle such that eccentricity is 750, length is 40m and stress induced is 1000n/m2? |
A. | 0.89 |
B. | 0.075 |
C. | 0.054 |
D. | 0.065 |
Answer» C. 0.054 | |
3. |
Check for ultimate shear strength such that shear force, Vu = 2834 kn, According to IRC: 18-2000, the ultimate shear resistance of the support section uncracked in flexure loss ratio is 0.8, p is 12000 103, area is 0.88 x 106mm2? |
A. | 11.3n/mm<sup>2</sup> |
B. | 23.5n/mm<sup>2</sup> |
C. | 19.9n/mm<sup>2</sup> |
D. | 10.9n/mm<sup>2</sup> |
Answer» E. | |
4. |
Calculate failure by crushing of concrete such that bw is 200, d is 1750, fck is 60n/mm2, b is800, Df is 400? |
A. | 12253x106nmm |
B. | 15253x106nmm |
C. | 18253x106nmm |
D. | 16253x106nmm |
Answer» D. 16253x106nmm | |
5. |
Calculate the mid support section given that Ap = 7980mm2, fck = 60n/mm2, b = 800mm, fp = 1862n/mm2, bw = 200mm, Mu(required) = 16865knm, Dt = 400mm, d = 1750mm, failure by yielding of steel? |
A. | 1204 |
B. | 23402 |
C. | 1298 |
D. | 45367 |
Answer» C. 1298 | |
6. |
Calculate effective length of Road on a highway given the overall thickness is 500mm and thickness of wearing coarse is 80mm (x is 3.6m)? |
A. | 4.76m |
B. | 34.8m |
C. | 2.34m |
D. | 1.45m |
Answer» B. 34.8m | |
7. |
Long span continuous prestressed concrete bridges are built of which type of box girders? |
A. | Single celled |
B. | 3 celled |
C. | Multi celled |
D. | 4 celled |
Answer» D. 4 celled | |
8. |
In India, a large number of long span bridges have been constructed using __________ |
A. | Simply supported beam |
B. | UDL |
C. | Point |
D. | Cantilever |
Answer» E. | |
9. |
The post tensioning is ideally suited for prestressing of __________ |
A. | Short span girders |
B. | Long span girders |
C. | Effective span |
D. | Limited span |
Answer» C. Effective span | |
10. |
The precast prestressed I and inverted T beams have been standardized by __________ |
A. | Pulverization association |
B. | Cement and concrete association |
C. | Brick association |
D. | Steel association |
Answer» C. Brick association | |
11. |
The prestressed concrete bridge decks generally comprise __________ |
A. | Precast pretensioned |
B. | Precast post tensioned |
C. | Partially pretensioned |
D. | Partially post tensioned |
Answer» B. Precast post tensioned | |