1.

One of the element considered in the economy of prestressed concrete structural system is?

A. Structural optimization
B. Beam optimization
C. Slab optimization
D. Transverse optimization
Answer» B. Beam optimization
2.

The first non linear programming procedure to be used in which year?

A. 1950
B. 1940
C. 1960
D. 1970
Answer» D. 1970
3.

The method of feasible direction can be grouped under the _________

A. Direct methods of approach
B. Sequential method of approach
C. Terminate method of approach
D. Laminar method of approach
Answer» B. Sequential method of approach
4.

One of the techniques developed for solution of non linear programming is?

A. Single programming
B. Multilinear propramming
C. Reverse programming
D. Dynamic programming
Answer» E.
5.

In non linear programming the boundaries of the contours of the function are _________

A. Parallel line
B. Zig Zag lines
C. Straight lines
D. Trapezoidal lines
Answer» D. Trapezoidal lines
6.

One of the most powerful techniques for solving non linear programming is to transform the _________

A. Data
B. Problems
C. Materials
D. Labour
Answer» C. Materials
7.

Linear programming problems can be solved by _________

A. Revised simplex method
B. Termed method
C. Moment derivation method
D. Hollow method
Answer» B. Termed method
8.

A linear function in three-dimensional space is a _________

A. Midpoint
B. Plane
C. Laminar
D. Zero
Answer» C. Laminar
9.

In linear programming, the solution is based on _________

A. Tensile properties
B. Strain properties
C. Elementary properties
D. None of the mentioned
Answer» D. None of the mentioned
10.

The technique for selecting a new point depends upon _____________

A. Scope of the problem
B. Nature of the problem
C. Range of the problem
D. Analysis of the problem
Answer» C. Range of the problem