1. |
Transformers with high leakage impedance is used in ___________ |
A. | arc welding |
B. | power distribution |
C. | power generating terminals |
D. | none of the mentioned |
Answer» B. power distribution | |
2. |
A single phase transformer of 2200/220 V having rated l.v. current of 150 A has to undergo open circuit test on h.v side. The instruments used are voltmeter of 200V and ammeter of 1A. Then the results ___________ |
A. | will be wrong |
B. | will be accurate |
C. | of ammeter will burn |
D. | none of the mentioned |
Answer» D. none of the mentioned | |
3. |
A single phase transformer of 2000/200 V having rated l.v. current of 100 A has to undergo short circuit test on l.v. side. Which of the below instruments range should be used? |
A. | 200V,10A |
B. | 20V, 10A |
C. | 300V,100A |
D. | 200V,50A |
Answer» B. 20V, 10A | |
4. |
A single phase transformer of 2200/220 V having rated l.v. current of 150 A has to undergo open circuit test on h.v. side. Which of the below instruments range should be used? |
A. | 6A, 200V |
B. | 150A, 22V |
C. | 60A, 220V |
D. | 6A, 20V |
Answer» B. 150A, 22V | |
5. |
To conduct the short circuit test, test is conducted on the ___________ |
A. | l.v. side |
B. | h.v. side |
C. | primary |
D. | secondary |
Answer» C. primary | |
6. |
To conduct the open circuit test, test is conducted on the _____________ |
A. | l.v. side |
B. | h.v. side |
C. | primary |
D. | secondary |
Answer» B. h.v. side | |
7. |
Power required during the open circuit and short circuit test is? |
A. | losses incurring in the transformer |
B. | executing the power requirements by measuring instruments |
C. | power for the core losses only |
D. | all of the mentioned |
Answer» B. executing the power requirements by measuring instruments | |