1.

Prevention of bond between the steel and concrete is known as ___________

A. Bond prestressed concrete
B. Axial prestressing
C. De bonding
D. Proof stress
Answer» D. Proof stress
2.

Which of the following type of prestress applied to concrete in which tensile stresses to a limited degree are permitted is known as ___________

A. Moderate prestressing
B. Partial prestressing
C. Full prestressing
D. Axial prestressing
Answer» C. Full prestressing
3.

The phenomena of reduction of stress in steel at a constant strain are known as ___________

A. Reduction of stress
B. Relaxation of stress
C. De bonding
D. Proof stress
Answer» C. De bonding
4.

The ratio between the creep strain and elastic strain of concrete is defined as ___________

A. Creep ratio
B. Creep elasticity
C. Creep coefficient
D. Creep factor
Answer» D. Creep factor
5.

The phenomena of drying process of contraction concrete refer to ___________

A. Moisture loss
B. Shrinkage of concrete
C. Drying process
D. Weight loss
Answer» C. Drying process
6.

In case of continuous prestressed concrete members to gain continuity, splicing is done by ___________

A. Reinforcement
B. Steel
C. Concrete
D. Tendons
Answer» E.
7.

In circular prestressing members, the tendons are supplied in form of ___________

A. Cables
B. Bars
C. Wires
D. Rings
Answer» E.
8.

The load at which the prestressed member develops its first crack is called as ___________

A. Transfer load
B. Creep load
C. Bending load
D. Cracking load
Answer» E.
9.

In cab cable, the curved portion of the tendon and anchors lie in ___________

A. Compression and Tension zone
B. Cracking zone
C. Tension and Compression zone
D. Loading zone
Answer» D. Loading zone
10.

The length of the prestressing tendon between the end of the member and the point where the steel attains its stress is called ___________

A. Anchorage
B. De bonding
C. Cracking load
D. Transmission length
Answer» E.
11.

In the zone of anchorages the material preferred to minimize costs is ___________

A. High strength steel
B. High strength bars
C. High strength tendons
D. High strength concrete
Answer» E.
12.

The necessity of high strength concrete in prestressed concrete is due to ___________

A. Shear and Bonding
B. Loading and Unloading
C. Cracking
D. Bending
Answer» B. Loading and Unloading
13.

The significant observations which resulted from the pioneering research on prestressed concrete were ___________

A. High strength steel and losses of prestress
B. High strength tendon and losses of creep
C. High strength bars and losses of strain
D. High strength rings and losses of shrinkage
Answer» B. High strength tendon and losses of creep