MCQOPTIONS
Saved Bookmarks
This section includes 13 Mcqs, each offering curated multiple-choice questions to sharpen your Prestressed Concrete Structures knowledge and support exam preparation. Choose a topic below to get started.
1. |
Prevention of bond between the steel and concrete is known as ___________ |
A. | Bond prestressed concrete |
B. | Axial prestressing |
C. | De bonding |
D. | Proof stress |
Answer» D. Proof stress | |
2. |
Which of the following type of prestress applied to concrete in which tensile stresses to a limited degree are permitted is known as ___________ |
A. | Moderate prestressing |
B. | Partial prestressing |
C. | Full prestressing |
D. | Axial prestressing |
Answer» C. Full prestressing | |
3. |
The phenomena of reduction of stress in steel at a constant strain are known as ___________ |
A. | Reduction of stress |
B. | Relaxation of stress |
C. | De bonding |
D. | Proof stress |
Answer» C. De bonding | |
4. |
The ratio between the creep strain and elastic strain of concrete is defined as ___________ |
A. | Creep ratio |
B. | Creep elasticity |
C. | Creep coefficient |
D. | Creep factor |
Answer» D. Creep factor | |
5. |
The phenomena of drying process of contraction concrete refer to ___________ |
A. | Moisture loss |
B. | Shrinkage of concrete |
C. | Drying process |
D. | Weight loss |
Answer» C. Drying process | |
6. |
In case of continuous prestressed concrete members to gain continuity, splicing is done by ___________ |
A. | Reinforcement |
B. | Steel |
C. | Concrete |
D. | Tendons |
Answer» E. | |
7. |
In circular prestressing members, the tendons are supplied in form of ___________ |
A. | Cables |
B. | Bars |
C. | Wires |
D. | Rings |
Answer» E. | |
8. |
The load at which the prestressed member develops its first crack is called as ___________ |
A. | Transfer load |
B. | Creep load |
C. | Bending load |
D. | Cracking load |
Answer» E. | |
9. |
In cab cable, the curved portion of the tendon and anchors lie in ___________ |
A. | Compression and Tension zone |
B. | Cracking zone |
C. | Tension and Compression zone |
D. | Loading zone |
Answer» D. Loading zone | |
10. |
The length of the prestressing tendon between the end of the member and the point where the steel attains its stress is called ___________ |
A. | Anchorage |
B. | De bonding |
C. | Cracking load |
D. | Transmission length |
Answer» E. | |
11. |
In the zone of anchorages the material preferred to minimize costs is ___________ |
A. | High strength steel |
B. | High strength bars |
C. | High strength tendons |
D. | High strength concrete |
Answer» E. | |
12. |
The necessity of high strength concrete in prestressed concrete is due to ___________ |
A. | Shear and Bonding |
B. | Loading and Unloading |
C. | Cracking |
D. | Bending |
Answer» B. Loading and Unloading | |
13. |
The significant observations which resulted from the pioneering research on prestressed concrete were ___________ |
A. | High strength steel and losses of prestress |
B. | High strength tendon and losses of creep |
C. | High strength bars and losses of strain |
D. | High strength rings and losses of shrinkage |
Answer» B. High strength tendon and losses of creep | |