1. |
When should the inspection with the provision of MIL STD 105E be terminated? |
A. | When at least 10 consecutive lots remain on tightened inspection |
B. | When at least 7 consecutive lots remain on normal inspection |
C. | When at least 5 consecutive lots remain on tightened inspection |
D. | When at least 10 consecutive lots remain on normal inspection |
Answer» B. When at least 7 consecutive lots remain on normal inspection | |
2. |
When is the normal inspection to be instituted instead of tightened inspection? |
A. | When 3 lots are rejected consecutively |
B. | When 2 lots are accepted consecutively |
C. | When 5 lots are rejected consecutively |
D. | When 5 lots are accepted consecutively |
Answer» E. | |
3. |
Tightened inspection is instituted when at least ______ out of 5 consecutive lots have been rejected on original submission. |
A. | 1 |
B. | 4 |
C. | 2 |
D. | 5 |
Answer» D. 5 | |
4. |
Level I of inspection of MIL STD 105E requires about __________ amount inspection as Level II. |
A. | Zero |
B. | Half |
C. | 100% |
D. | 3/4th |
Answer» C. 100% | |
5. |
AQL is the __________ |
A. | Acceptable Quality Level |
B. | Acceptance Quality Level |
C. | Associated Quality Level |
D. | Assigned Quality level |
Answer» B. Acceptance Quality Level | |
6. |
MIL STD 105E is a _________ |
A. | Acceptance sampling plan |
B. | Acceptance sampling system |
C. | Both Acceptance sampling plan and Acceptance sampling system |
D. | Neither acceptance sampling plan nor system |
Answer» C. Both Acceptance sampling plan and Acceptance sampling system | |
7. |
TIGHTENED_INSPECTION_IS_INSTITUTED_WHEN_AT_LEAST_____OUT_OF_5_CONSECUTIVE_LOTS_HAVE_BEEN_REJECTED_ON_ORIGINAL_SUBMISSION.?$ |
A. | 1 |
B. | 4 |
C. | 2 |
D. | 5 |
Answer» D. 5 | |
8. |
When should the inspection with the provision of MIL STD 105E be terminated?$ |
A. | When at least 10 consecutive lots remain on tightened inspection |
B. | When at least 7 consecutive lots remain on normal inspection |
C. | When at least 5 consecutive lots remain on tightened inspection |
D. | When at least 10 consecutive lots remain on normal inspection |
Answer» B. When at least 7 consecutive lots remain on normal inspection | |
9. |
When_is_the_normal_inspection_to_be_instituted_instead_of_tightened_inspection?$ |
A. | When 3 lots are rejected consecutively |
B. | When 2 lots are accepted consecutively |
C. | When 5 lots are rejected consecutively |
D. | When 5 lots are accepted consecutively |
Answer» E. | |
10. |
Level I of inspection of MIL STD 105E requires about ____ amount inspection as Level II? |
A. | Zero |
B. | Half |
C. | 100% |
D. | 3/4th |
Answer» C. 100% | |
11. |
How many sample inspection levels are used in MIL STD 105E? |
A. | 1 |
B. | 2 |
C. | 5 |
D. | 3 |
Answer» E. | |
12. |
Which of these ISO standards were adopted from MIL STD 105E? |
A. | ISO 14000 |
B. | ISO 9000 |
C. | ISO 2859 |
D. | ISO 6000 |
Answer» D. ISO 6000 | |
13. |
Which of these is a derivative civilian standard which is quite similar to MIL STD 105E? |
A. | ANSI/ASQC Z1.4 |
B. | ANSI/ASQC Z1.1 |
C. | ANSI/ASQC Z1.8 |
D. | ANSI/ASQC Z1.7 |
Answer» B. ANSI/ASQC Z1.1 | |
14. |
AQL is the ____ |
A. | Acceptable Quality Level |
B. | Acceptance Quality Level |
C. | Associated Quality Level |
D. | Assigned Quality level |
Answer» B. Acceptance Quality Level | |
15. |
MIL STD 105E is a ___ |
A. | Acceptance sampling plan |
B. | Acceptance sampling system |
C. | Both Acceptance sampling plan and Acceptance sampling system |
D. | Neither acceptance sampling plan nor system |
Answer» C. Both Acceptance sampling plan and Acceptance sampling system | |
16. |
How many revisions have been done in the case of MIL STD 105E? |
A. | 1 |
B. | 2 |
C. | 3 |
D. | 4 |
Answer» E. | |
17. |
MIL STD 105E was first issued in ________ |
A. | 1949 |
B. | 1937 |
C. | 1945 |
D. | 1950 |
Answer» E. | |