This section includes 10 Mcqs, each offering curated multiple-choice questions to sharpen your Software Engg knowledge and support exam preparation. Choose a topic below to get started.
1. |
IDENTIFY_THE_CORRECT_OPTION_WITH_REFERENCE_TO_SOFTWARE_QUALITY_METRICS.?$ |
A. | Integrity = [Sigma(1 – threat)] * (1 – security) |
B. | Integrity = [1 – Sigma(threat)] * (1 – security) |
C. | Integrity = [1 – threat * Sigma(1 – security)]. |
D. | Integrity = Sigma[1 – threat * (1 – security)]. |
Answer» E. | |
2. |
MTTC_FALLS_THE_THE_CATEGORY_OF?$ |
A. | correctness |
B. | integrity |
C. | maintainability |
D. | all of the mentioned |
Answer» D. all of the mentioned | |
3. |
Metric is the act of obtaining a measure? |
A. | True |
B. | False |
Answer» C. | |
4. |
Percentage of modules that were inspected is a part of |
A. | Product Metrics |
B. | Process Metrics |
C. | Project Metrics |
D. | All of the mentioned |
Answer» C. Project Metrics | |
5. |
Which of the following is not categorized under Component-Level Design Metrics? |
A. | Complexity Metrics |
B. | Cohesion Metrics |
C. | Morphology Metrics |
D. | Coupling Metrics |
Answer» D. Coupling Metrics | |
6. |
The arc-to-node ratio is given as r = a/n. What does ‘a’ represent in the ratio?$ |
A. | maximum number of nodes at any level |
B. | longest path from the root to a leaf |
C. | number of modules |
D. | lines of control |
Answer» E. | |
7. |
Which of the following is not categorized under Product Operation of McCall’s Software Quality Factors?$ |
A. | Flexibility |
B. | Reliability |
C. | Usability |
D. | Integrity |
Answer» B. Reliability | |
8. |
Number of errors found per person hours expended is an example of a |
A. | measurement |
B. | measure |
C. | metric |
D. | all of the mentioned |
Answer» D. all of the mentioned | |
9. |
Cost and schedule are a part of |
A. | Product Metrics |
B. | Process Metrics |
C. | Project Metrics |
D. | All of the mentioned |
Answer» D. All of the mentioned | |
10. |
Size and Complexity are a part of |
A. | Product Metrics |
B. | Process Metrics |
C. | Project Metrics |
D. | All of the mentioned |
Answer» B. Process Metrics | |