1101.

At the break even point,

A. total cost is more than the sales revenue
B. total cost is less than the sales revenue
C. total cost is equal to sales revenue
D. fixed cost is equal to variable cost
Answer» D. fixed cost is equal to variable cost
1102.

Which of the following conditions are necessary for applying linear programming?

A. These must be a well defined objective function.
B. The decision variables should be interrelated and non-negative.
C. The resources must be in limited supply.
D. all of the above
Answer» E.
1103.

A dummy activity becomes a critical activity when its earliest start time (EST) is same as its latest finishing time (LFT).

A. Correct
B. Incorrect
Answer» B. Incorrect
1104.

In time study, normal time is more than the standard time.

A. Yes
B. No
Answer» C.
1105.

Indirect expenses include

A. factory expenses
B. selling expenses
C. administrative expenses
D. all of these
Answer» E.
1106.

In a simple die

A. two or more operations are performed simultaneously at the single stroke of the ram
B. two or more cutting operations are performed at one station of the press in every stroke of the ram
C. both cutting and non-cutting operations are performed at one station of the press in every stroke of the ram
D. none of the above
Answer» E.
1107.

Seam weiding is a

A. continuous spot welding process
B. multi-spot welding process
C. arc welding process
D. process used for joining round bars
Answer» B. multi-spot welding process
1108.

Time study is carried out to determine the time required to complete job by

A. a slow worker
B. a fast worker
C. an average worker
D. an apprentice
Answer» D. an apprentice
1109.

The start or completion of task is called

A. an event
B. an activity
C. a duration
D. none of these
Answer» B. an activity
1110.

Slack may be positive, zero or negative.

A. Agree
B. Disagree
Answer» B. Disagree
1111.

According to Rowan plan of wage incentive system, bonus is paid to a worker

A. whose output exceeds 67% efficiency
B. on the percentage of time saved
C. on the percentage of time worked
D. on the percentage of standard time
Answer» D. on the percentage of standard time
1112.

Which of the following charts are used for plant layout design?

A. Operation process chart
B. Man machine chart
C. Travel chart
D. all of these
Answer» E.
1113.

The brass and bronze are welded by __________ flame.

A. neutral
B. oxidising
C. carburising
D. all of these
Answer» C. carburising
1114.

Projection welding is a

A. continuous spot welding process
B. multi-spot welding process
C. arc welding process
D. process used for joining round bars
Answer» C. arc welding process
1115.

The adhesiveness is the property of a sand due to which

A. it evolves a great amount of steam and other gases
B. the sand grains stick together
C. it cling to the sides of a moulding box
D. none of these
Answer» D. none of these
1116.

Travel charts are used to

A. analyse material handling
B. determine inventory control difficulties
C. plan material handling procedure and routes
D. all of the above
Answer» E.
1117.

The value engineering technique in which experts of the same rank assemble for product development is called

A. Delphi
B. brain storming
C. morphological analysis
D. direct expert comparison
Answer» C. morphological analysis
1118.

A stripper-plate machine is used to draw the pattern from the mould.

A. Yes
B. No
Answer» B. No
1119.

Process layout is employed

A. where low volume of production is required
B. where similar jobs are manufactured on similar machines
C. where machines are arranged on functional basis
D. all of the above
Answer» E.
1120.

The interchangeability can be achieved by

A. standardisation
B. better process planning
C. bonus plan
D. better product planning
Answer» B. better process planning
1121.

Which one of the following techniques is used for determining allowances in time study?

A. Acceptance sampling
B. Linear regression
C. Performance rating
D. Work sampling
Answer» E.
1122.

The operation of producing cup shaped parts from flat sheet metal blanks by bending and plastic flow of metal, is known as

A. drawing
B. squeezing
C. coining
D. planishing
Answer» B. squeezing
1123.

The algebraic difference between the maximum limit and the basic size is called

A. actual deviation
B. upper deviation
C. lower deviation
D. fundamental deviation
Answer» C. lower deviation
1124.

Actual performance of a task is called

A. an event
B. an activity
C. a duration
D. none of these
Answer» C. a duration
1125.

PERT

A. provides an approach for keeping planning up-to-date
B. provides a way for management to require that planning be done on a uniform and logical basis
C. permits management to foresee quickly the impact of variations from the plan
D. all of the above
Answer» E.
1126.

If A is the total items consumed per year, P is the procurement cost per order, and C is the annual inventory carrying cost per item, then the most economic ordering quantity is given by

A. <img src="/_files/images/mechanical-engineering/industrial-engineering-and-production-management/746-111-1.png">
B. <img src="/_files/images/mechanical-engineering/industrial-engineering-and-production-management/746-111-2.png">
C. <img src="/_files/images/mechanical-engineering/industrial-engineering-and-production-management/746-111-3.png">
D. <img src="/_files/images/mechanical-engineering/industrial-engineering-and-production-management/746-111-4.png">
Answer» D. <img src="/_files/images/mechanical-engineering/industrial-engineering-and-production-management/746-111-4.png">
1127.

CPM requires

A. single time estimate
B. double time estimate
C. triple time estimate
D. none of these
Answer» B. double time estimate
1128.

Which of the following wage incentive plan is applied to all workers?

A. Halsey plan
B. Gantt plan
C. Emerson's efficiency plan
D. Rowan plan
Answer» B. Gantt plan
1129.

Earliest finish time can be regarded as

A. earliest start time + duration of activity
B. earliest start time - duration of activity
C. latest finish time + duration of activity
D. latest finish time - duration of activity
Answer» B. earliest start time - duration of activity
1130.

Abbreviated work factor data is applied for

A. material handling operation
B. maintenance operation
C. packing and shipping operation
D. all of these
Answer» E.
1131.

Routing

A. prescribes the sequence of operations to be followed
B. determines the programme for the operations
C. is concerned with starting of processes
D. regulates the progress of job through various processes
Answer» B. determines the programme for the operations
1132.

The bonus increases in proportion to the increase in efficiency. This statement applies to

A. Halsey plan
B. Ganttplan
C. Emerson's efficiency plan
D. Rowan plan
Answer» D. Rowan plan
1133.

Which of the following statement is correct about the network diagram?

A. The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows.
B. The tail end of the arrow represents the start of an activity.
C. The head of the arrow represents the end of an activity.
D. all of the above
Answer» E.
1134.

P.M.T.S. (Predetermined Motion Time Systems) include

A. M.T.M. (Method Time Measurement)
B. W.F.S. (Work Factor Systems)
C. B.M.T.S. (Basic Motion Time Study)
D. all of these
Answer» E.
1135.

Performance rating is equal to

A. observed performance + normal performance
B. observed performance - normal performance
C. observed performance x normal performance
D. none of the above
Answer» E.
1136.

The factors which are to be considered while developing a good wage incentive plan will include

A. adequate incentive
B. ease of administration
C. guaranteed basic pay
D. all of these
Answer» E.
1137.

Work study is mainly aimed at

A. determining the most efficient method of performing a job
B. establishing the minimum time of completion of a job
C. developing the standard method and standard time of a job
D. economising the motions involved on the part of the worker while performing a job
Answer» B. establishing the minimum time of completion of a job
1138.

The type of organisation preferred for an automobile industry, is

A. line organisation
B. functional organisation
C. line and staff organisation
D. line, staff and functional organisation
Answer» D. line, staff and functional organisation
1139.

The work study is done by means of

A. planning chart
B. process chart
C. stop watch
D. any one of these
Answer» D. any one of these
1140.

The production cost per unit can be reduced by

A. producing more with increased inputs
B. producing more with the same inputs
C. eliminating idle time
D. minimising resource waste
Answer» C. eliminating idle time
1141.

In manufacturing management, the term 'Dispatching' is used to describe

A. dispatch of sales order
B. dispatch of factory mail
C. dispatch of finished product of the user
D. dispatch of work orders through shop floor
Answer» E.
1142.

Product layout is also known as

A. analytical layout
B. synthetic layout
C. static product layout
D. none of these
Answer» C. static product layout
1143.

When slack of an activity is zero, the activity is critical and any delay in its performance will delay the completion of the whole project.

A. Yes
B. No
Answer» B. No
1144.

Merit rating is the method of determining the

A. relative values of a job
B. worker's performance on a job
C. worth of a machine
D. value of overall production
Answer» C. worth of a machine
1145.

PERT stands for

A. Programme Estimation and Reporting Technique
B. Process Estimation and Review Technique
C. Programme Evaluation and Review Technique
D. Planning Estimation and Resulting Technique
Answer» D. Planning Estimation and Resulting Technique
1146.

In Emerson's efficiency plan of wage incentive system, bonus is paid to a worker

A. whose output exceeds 67% efficiency
B. on the percentage of time saved
C. on the percentage of time worked
D. on the percentage of standard time
Answer» B. on the percentage of time saved
1147.

M.T.M. is used to

A. improve existing methods
B. establish time standards
C. develop effective methods in advance of the beginning of production
D. all of the above
Answer» E.
1148.

For material transportation, conveyors are used when the prevailing conditions include

A. loads are uniform
B. routes do not vary
C. materials move relatively continuously
D. all of these
Answer» E.
1149.

The planning and scheduling of job order manufacturing differ from planning and scheduling of mass production manufacturing.

A. Correct
B. Incorrect
Answer» B. Incorrect
1150.

The type of layout used for manufacturing steam turbines, is

A. product layout
B. process layout
C. fixed position layout
D. any one of these
Answer» D. any one of these