| 1. |
Which of the following are the cold working processes?(1) Forging(2) Bending(3) Squeezing (4) Pipe Welding(5) Drawing |
| A. | (1), (2) and (3) |
| B. | (2), (3) and (5) |
| C. | (2), (4) and (5) |
| D. | (1), (2), (3) and (5) |
| Answer» C. (2), (4) and (5) | |
| 2. |
Which of the following statements are true for ultrasonic welding?1. Productivity of ultrasonic welding is high2. Thin pieces can be welded to thicker pieces by ultrasonic welding3. Ultrasonic welds contain foreign inclusions 4. Post cleaning of welds is necessary in ultrasonic welding5. Preparation required for ultrasonic welding process is very little |
| A. | (1), (2) and (4) |
| B. | (2), (3) and (4) |
| C. | (1), (3) and (5) |
| D. | (1), (2) and (5) |