201.

At what rated voltage is the shielded cable provided in a low voltage system?

A. Rated voltage < 1kV
B. Rated voltage < 500V
C. Rated voltage > 1 kV
D. Any of these
Answer» B. Rated voltage < 500V
202.

At what percentage of the rated speed is the starting winding of a capacitor start induction disconnected with the help of a centrifugal switch?

A. 50 % of the rated speed
B. 70 % of the rated speed
C. 25 % of the rated speed
D. 5 % of the rated speed
Answer» C. 25 % of the rated speed
203.

At what location are the shunt capacitors installed for voltages above 33 kV and above?

A. Are located near the motors
B. Are installed in distribution substations
C. Both (A) and (B)
D. None of these
Answer» C. Both (A) and (B)
204.

At what level is the load shedding carried out?

A. Distribution level
B. Transmission level
C. Both (A) and (B)
D. Depending upon the load
Answer» B. Transmission level
205.

At what condition does the corona start, if Es is the electrical stress and Ecr is the critical voltage?

A. Es > Ecr
B. Es = Ecr
C. Es < Ecr
D. Es << Ecr
Answer» B. Es = Ecr
206.

At what angle difference is the main winding and the start winding separated in a spilt phase capacitor start induction motor?

A. 45° electrical
B. 90° electrical
C. 45° mechanical
D. 90° mechanical
Answer» C. 45° mechanical
207.

Arrange these in the correct order of the sequence for designing the tower? i. Design data ii. Prototype manufacture iii. Providing tests iv. Preliminary design v. Final design vi. Earlier experience

A. vi – i – iv – v – ii – iii
B. vi – i – iv – ii – iii – v
C. i – vi – iv – v – ii – iii
D. i – iv – iv – ii – iii – v
Answer» C. i – vi – iv – v – ii – iii
208.

Arrange the following according to the starting procedure of a synchronous Generator? i. Start turbine auxiliaries ii. Start boiler iii. Roll the turbine iv. Start the boiler auxiliaries v. Keep the units as a spinning reserve

A. i, iii, v, iv, ii
B. i, iv, ii, iii, v
C. iv, i, ii, iii, v
D. iii, i, v, iv, ii
Answer» D. iii, i, v, iv, ii
209.

Above what ratings is it necessary to fix separate heat exchangers on the machines?

A. Above 500 kW
B. Above 300 kW
C. Above 100 kW
D. Above 1000 kW
Answer» C. Above 100 kW
210.

A primary cell is chemically _____________________.

A. Irreversible
B. Reversible
C. Reversible only once
D. Reversible upto five times
Answer» B. Reversible