1. |
A company manufactures two types of products A and B. The storage capacity of its godown is 100 units. Total investment amount is Rs. 30,000. The cost price of A and B are Rs. 400 and Rs. 900 respectively. If all the products have sold and per unit profit is Rs. 100 and Rs. 120 through A and B respectively. If x units of A and y units of B be produced, then two linear constraints and iso-profit line are respectively |
A. | \[x+y=100;\ 4x+9y=300,\ 100x+120y=c\] |
B. | \[x+y\le 100;\ 4x+9y\le 300,\ x+2y=c\] |
C. | \[x+y\le 100;\ 4x+9y\le 300,\ 100x+120y=c\] |
D. | \[x+y\le 100;\ 9x+4y\le 300,\ x+2y=c\] |
Answer» D. \[x+y\le 100;\ 9x+4y\le 300,\ x+2y=c\] | |
2. |
For the L.P. problem Min\[z=2{{x}_{1}}+3{{x}_{2}}\] such that \[-{{x}_{1}}+2{{x}_{2}}\le 4,\] \[{{x}_{1}}+{{x}_{2}}\le 6,\ \ {{x}_{1}}+3{{x}_{2}}\ge 9\] and \[{{x}_{1}},\ {{x}_{2}}\ge 0\] |
A. | \[{{x}_{1}}=1.2\] |
B. | \[{{x}_{2}}=2.6\] |
C. | \[z=10.2\] |
D. | All the above |
Answer» E. | |
3. |
A Firm makes pents and shirts. A shirt takes 2 hour on machine and 3 hour of man labour while a pent takes 3 hour on machine and 2 hour of man labour. In a week there are 70 hour machine and 75 hour of man labour available. If the firm determine to make x shirts and y pents per week, then for this the linear constraints are |
A. | \[x\ge 0,\ y\ge 0,\ 2x+3y\ge 70,\ 3x+2y\ge 75\] |
B. | \[x\ge 0,\ y\ge 0,\ 2x+3y\le 70,\ 3x+2y\ge 75\] |
C. | \[x\ge 0,\ y\ge 0,\ 2x+3y\ge 70,\ 3x+2y\le 75\] |
D. | \[x\ge 0,\ y\ge 0,\ 2x+3y\le 70,\ 3x+2y\le 75\] |
Answer» E. | |