1. |
The lateral leachate collection pipes shall slope towards ________ pipe. |
A. | Sump |
B. | Drain |
C. | Main |
D. | Longitude |
Answer» D. Longitude | |
2. |
What is the formula for quantification of leachate generation from landfill? |
A. | I = P P (CR/O) AET +/- S |
B. | P = I P (CR/O) AET +/- S |
C. | I = S P (CR/O) AET +/- P |
D. | I = P S (CR/O) AET +/- Y |
Answer» B. P = I P (CR/O) AET +/- S | |
3. |
Drainage pipes of leachate collection system is filled with ________ |
A. | Gravel |
B. | Dust |
C. | Clay |
D. | Grass |
Answer» B. Dust | |
4. |
PVC liners are suitable for landfills. |
A. | True |
B. | False |
Answer» B. False | |
5. |
Bentonite is mixed when there is not enough clay available at a site to construct a soil liner. |
A. | True |
B. | False |
Answer» B. False | |
6. |
Excavation of soil in a location for liner is known as ________ pit. |
A. | Dig |
B. | Borrow |
C. | Barrow |
D. | Excavated |
Answer» C. Barrow | |