Explore topic-wise MCQs in Irrigation Engineering.

This section includes 15 Mcqs, each offering curated multiple-choice questions to sharpen your Irrigation Engineering knowledge and support exam preparation. Choose a topic below to get started.

1.

The use of sealing compounds for vertical joints is very successful.

A. True
B. False
Answer» C.
2.

What is the most common metal used for water stops?

A. Monel metal
B. Annealed copper
C. Galvanised iron
D. Steel
Answer» C. Galvanised iron
3.

In case of the sealing joint, the lower part of the joint is occupied by joint filler.

A. True
B. False
Answer» C.
4.

Joint sealing compounds are impermeable ductile materials which are required to ___________________

A. increase the bond
B. provide a watertight seal by adhesion to concrete
C. shorten the water path
D. avoid the risk of a fault in an embedded water bar
Answer» C. shorten the water path
5.

Which of the following is sometimes used in expansion joints to avoid the risk of fault in an embedded water bar?

A. Joint fillers
B. Joint sealers
C. Joint covers plates
D. Water stops
Answer» D. Water stops
6.

What provides a permanent watertight seal during the whole range of joint movement?

A. Water bars
B. Joint fillers
C. Joint covers plates
D. Joint sealers
Answer» B. Joint fillers
7.

Which of the following can be used as support for an effective joint sealing compound in floor and floor joints?

A. Joint fillers
B. Water bars
C. Joint sealers
D. Primers
Answer» B. Water bars
8.

What is the maximum expansion or contraction allowed for the joint filler material with an initial gap of about 30 mm?

A. 10 mm
B. 5 mm
C. 20 mm
D. 30 mm
Answer» B. 5 mm
9.

The expansion joints in floors and walls should normally be provided at a spacing of not more than ___________

A. 30 m
B. 45 m
C. 50 m
D. 55 m
Answer» B. 45 m
10.

In reinforced concrete floors, the movement joints should normally be spaced at a maximum spacing of ____________

A. 6 m
B. 4.5 m
C. 7.5 m
D. 9 m
Answer» D. 9 m
11.

Which of the following is a movement joint with complete discontinuity in both reinforcement and concrete and intended to accommodate either expansion or contraction of the structure?

A. Contraction joint
B. Expansion joint
C. Sliding joint
D. Construction joints
Answer» C. Sliding joint
12.

Which of the following is a movement joint with deliberate discontinuity but no initial gap?

A. Contraction joint
B. Expansion joint
C. Sliding joint
D. Construction joints
Answer» B. Expansion joint
13.

A partial contraction joint is the one in which?

A. both the concrete and reinforcing steel are interrupted
B. only the concrete is interrupted
C. only the reinforcement is interrupted
D. none of them is interrupted
Answer» C. only the reinforcement is interrupted
14.

Which of the following is not a movement joint?

A. Contraction joint
B. Expansion joint
C. Sliding joint
D. Construction joints
Answer» E.
15.

Which of the following is usually adopted for contraction and construction joints?

A. Rubber water bars
B. V-shape metal bars
C. PVC water bars
D. Z-shape metal bars
Answer» D. Z-shape metal bars