| 1. | What is the last step in chain surveying? | 
| A. | Reconnaissance | 
| B. | Marking | 
| C. | Fixing | 
| D. | Running survey lines | 
| Answer» E. | |
| 2. | What is used for marking the stations which can be used for a very long time? | 
| A. | Wooden pegs | 
| B. | Spikes | 
| C. | Standard shape stone | 
| D. | Cement motar | 
| Answer» D. Cement motar | |
| 3. | What is driven or filled or embedded in the roads during the marking of survey stations? | 
| A. | Wooden pegs | 
| B. | Spikes | 
| C. | Standard shape | 
| D. | Cement motar | 
| Answer» C. Standard shape | |
| 4. | What is driven or filled in the soft ground during the marking of survey stations? | 
| A. | Wooden pegs | 
| B. | Spikes | 
| C. | Nails | 
| D. | Cement motar | 
| Answer» B. Spikes | |
| 5. | What is the immediate procedure after selecting survey stations? | 
| A. | Reconnaissance | 
| B. | Marking | 
| C. | Fixing | 
| D. | Running survey lines | 
| Answer» C. Fixing | |
| 6. | Which of the following should be examined by a surveyor before selecting the stations? | 
| A. | Intervisibility | 
| B. | Shearing stress | 
| C. | Ultimate strength | 
| D. | Porousness | 
| Answer» B. Shearing stress | |
| 7. | In which of the following steps does a reference sketch of the ground should be prepared? | 
| A. | Marking | 
| B. | Fixing survey stations | 
| C. | Reconnaissance | 
| D. | Running survey lines | 
| Answer» D. Running survey lines | |
| 8. | What is the first principle of surveying? | 
| A. | Part to whole | 
| B. | Whole to part | 
| C. | Whole to whole | 
| D. | Part to part | 
| Answer» C. Whole to whole | |
| 9. | In soft ground, spikes or nails are driven into the ground it comes under which step of surveying? | 
| A. | Running survey line | 
| B. | Reconnaissance | 
| C. | Selecting | 
| D. | Marking | 
| Answer» E. | |
| 10. | In which of the following case to mark a survey station, a portion may be dug and filled with cement motor? | 
| A. | Soft grounds | 
| B. | Hard grounds | 
| C. | Pavements | 
| D. | In all cases | 
| Answer» C. Pavements | |