This section includes 162 Mcqs, each offering curated multiple-choice questions to sharpen your Automobile Engineering knowledge and support exam preparation. Choose a topic below to get started.
101. |
Time study is used to |
A. | determine standard costs |
B. | determine the number of machines a person may run |
C. | provide a basis for setting piece price or incentive wages |
D. | all of the above |
Answer» E. | |
102. |
If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be |
A. | TR |
B. | TR + [(S - T)/2] × R |
C. | TR + (S - T)R |
D. | TR + [(S - T)/S] × R |
Answer» C. TR + (S - T)R | |
103. |
In manufacturing management, the term 'Dispatching' is used to describe |
A. | dispatch of sales order |
B. | dispatch of factory mail |
C. | dispatch of finished product of the user |
D. | dispatch of work orders through shop floor |
Answer» E. | |
104. |
The correct sequence of phases in value engineering is |
A. | creative phase, information phase, investigation phase, evaluation phase |
B. | information phase, creative phase, investigation phase, evaluation phase |
C. | investigation phase, information phase, creative phase, evaluation phase |
D. | creative phase, investigation phase, evaluation phase, information phase |
Answer» B. information phase, creative phase, investigation phase, evaluation phase | |
105. |
If A is the total items consumed per year, P is the procurement cost per order, and C is the annual inventory carrying cost per item, then the most economic ordering quantity is given by |
A. | AP/C |
B. | 2AP/C |
C. | √(AP/C) |
D. | (AP/C)² |
Answer» D. (AP/C)² | |
106. |
The process capability of a machine is defined as the capability of the machine to |
A. | produce a definite volume of work per minute |
B. | perform definite number of operations |
C. | produce job at a definite spectrum of speed |
D. | hold a definite spectrum of tolerance and surface finish |
Answer» B. perform definite number of operations | |
107. |
Monte Carlo solution in queuing theory is extremely useful in queuing problems that can not be analysed mathematically. |
A. | Agree |
B. | Disagree |
C. | Can't say |
D. | None of these |
Answer» B. Disagree | |
108. |
The interchangeability can be achieved by |
A. | standardisation |
B. | better process planning |
C. | bonus plan |
D. | better product planning |
Answer» B. better process planning | |
109. |
In A-B-C analysis, which class of items are generally large in number? |
A. | A |
B. | B |
C. | C |
D. | none of these |
Answer» D. none of these | |
110. |
PERT |
A. | provides an approach for keeping planning up-to-date |
B. | provides a way for management to require that planning be done on a uniform and logical basis |
C. | permits management to foresee quickly the impact of variations from the plan |
D. | all of the above |
Answer» E. | |
111. |
The average time recorded by work study man for an operation is called |
A. | standard time |
B. | normal time |
C. | representative time |
D. | none of these |
Answer» D. none of these | |
112. |
A critical activity has |
A. | maximum slack |
B. | minimum slack |
C. | zero slack |
D. | average slack |
Answer» D. average slack | |
113. |
The purpose of micromotion study is to |
A. | assist in finding out the most efficient way of doing work |
B. | train the individual operator regarding the motion economy principles |
C. | help in collecting the motion time data for synthetic time standards |
D. | all of the above |
Answer» E. | |
114. |
Generally PERT is preferred over CPM for the purpose of project evaluation. |
A. | Yes |
B. | No |
C. | Can't say |
D. | None of these |
Answer» B. No | |
115. |
The main objective of work measurement is to |
A. | plan and schedule of production |
B. | formulate a proper incentive scheme |
C. | estimate the selling prices and delivery dates |
D. | all of the above |
Answer» E. | |
116. |
Queuing theory is used for |
A. | job-shop scheduling |
B. | inventory problems |
C. | traffic congestion studies |
D. | all of these |
Answer» E. | |
117. |
Which of the following wage incentive plan is applied to all workers? |
A. | Halsey plan |
B. | Gantt plan |
C. | Emerson's efficiency plan |
D. | Rowan plan |
Answer» B. Gantt plan | |
118. |
Which of the following charts are used for plant layout design? |
A. | Operation process chart |
B. | Man machine chart |
C. | Travel chart |
D. | all of these |
Answer» E. | |
119. |
Time study is carried out to determine the time required to complete job by |
A. | a slow worker |
B. | a fast worker |
C. | an average worker |
D. | an apprentice |
Answer» D. an apprentice | |
120. |
Which of the following statement is correct about the network diagram? |
A. | The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows. |
B. | The tail end of the arrow represents the start of an activity. |
C. | The head of the arrow represents the end of an activity. |
D. | all of the above |
Answer» E. | |
121. |
At the break even point, |
A. | total cost is more than the sales revenue |
B. | total cost is less than the sales revenue |
C. | total cost is equal to sales revenue |
D. | fixed cost is equal to variable cost |
Answer» D. fixed cost is equal to variable cost | |
122. |
Military type of organisation is known as |
A. | line organisation |
B. | functional organisation |
C. | line and staff organisation |
D. | line, staff and functional organisation |
Answer» B. functional organisation | |
123. |
A-B-C analysis |
A. | is a basic technique of materials management |
B. | is meant for relative inventory control |
C. | does not depend upon the unit cost of the item but on its annual consumption |
D. | all of the above |
Answer» E. | |
124. |
PERT is applied for |
A. | marketing programmes and advertising programmes |
B. | installation of machinery |
C. | research and development of products |
D. | all of these |
Answer» E. | |
125. |
The procedure of modifying work content to give more meaning and enjoyment to the job by involving employees in planning, organisation and control of their work, is termed as |
A. | job enlargement |
B. | job enrichment |
C. | job rotation |
D. | job evaluation |
Answer» C. job rotation | |
126. |
Queuing theory is associated with |
A. | inventory |
B. | sales |
C. | waiting time |
D. | production time |
Answer» D. production time | |
127. |
Fixed position layout is also known as |
A. | analytical layout |
B. | synthetic layout |
C. | static product layout |
D. | none of these |
Answer» D. none of these | |
128. |
PERT requires |
A. | single time estimate |
B. | double time estimate |
C. | triple time estimate |
D. | none of these |
Answer» D. none of these | |
129. |
The chart which gives an estimate about the amount of materials handling between various work stations is known as |
A. | flow chart |
B. | process chart |
C. | travel chart |
D. | operation chart |
Answer» D. operation chart | |
130. |
A diagram showing the path followed by men and materials while performing a task is known as |
A. | string diagram |
B. | flow process chart |
C. | travel chart |
D. | flow diagram |
Answer» E. | |
131. |
A device used for lifting or lowering objects suspended from a hook at the end of retractable chains or cable is called |
A. | hoist |
B. | jib crane |
C. | portable elevator |
D. | chain conveyor |
Answer» B. jib crane | |
132. |
Simplex method is the method used for |
A. | value analysis |
B. | network analysis |
C. | linear programming |
D. | queuing theory |
Answer» D. queuing theory | |
133. |
String diagram is used |
A. | for checking the relative values of various layouts |
B. | when a group of workers are working at a place |
C. | where processes require the operator to be moved from one work place to another |
D. | all of the above |
Answer» E. | |
134. |
Direct expenses include |
A. | factory expenses |
B. | selling expenses |
C. | administrative expenses |
D. | none of these |
Answer» E. | |
135. |
In break even analysis, total cost consists of |
A. | fixed cost + sales revenue |
B. | variable cost + sales revenue |
C. | fixed cost + variable cost |
D. | fixed cost + variable cost + profit |
Answer» D. fixed cost + variable cost + profit | |
136. |
The product layout is more amenable to automation than process layout. |
A. | True |
B. | False |
C. | - |
D. | - |
Answer» B. False | |
137. |
Representative time is the average of times recorded by work study man for an operation. |
A. | Agree |
B. | Disagree |
C. | - |
D. | - |
Answer» B. Disagree | |
138. |
Which of the following type of layout is suitable for automobile manufacturing concern? |
A. | product layout |
B. | process layout |
C. | fixed position layout |
D. | combination layout |
Answer» B. process layout | |
139. |
In big automobile repair shop, for elevating and moving the heavy parts such as complete engine assembly, gear box etc., an overhead crane and a fork lift truck is used. |
A. | Yes |
B. | No |
C. | - |
D. | - |
Answer» B. No | |
140. |
The routing function in a production system design is concerned with |
A. | manpower utilisation |
B. | quality assurance of the product |
C. | machine utilisation |
D. | optimising material flow through the plant |
Answer» D. optimising material flow through the plant | |
141. |
Job evaluation is the method of determining the |
A. | relative values of a job |
B. | worker's performance on a job |
C. | worth of the machine |
D. | value of overall production |
Answer» B. worker's performance on a job | |
142. |
In order to avoid excessive multiplication of facilities, the layout preferred is |
A. | product layout |
B. | process layout |
C. | group layout |
D. | static layout |
Answer» C. group layout | |
143. |
A-B-C analysis is used in |
A. | CPM |
B. | PERT |
C. | inventory control |
D. | all of these |
Answer» D. all of these | |
144. |
Work study involues |
A. | only method study |
B. | only work measurement |
C. | method study and work measurement |
D. | only motion study |
Answer» D. only motion study | |
145. |
Which of the following are the guidelines for the construction of a network diagram? |
A. | Each activity is represented by one and only one arrow in the network. |
B. | Dangling must be avoided in a network diagram. |
C. | Dummy activity consumes no time or resource. |
D. | all of the above |
Answer» E. | |
146. |
In a line organisation |
A. | responsibility of each individual is fixed |
B. | discipline is strong |
C. | quick decisions are taken |
D. | all of these |
Answer» E. | |
147. |
The type of organisation preferred for a steel industry, is |
A. | line organisation |
B. | functional organisation |
C. | line and staff organisation |
D. | line, staff and functional organisation |
Answer» E. | |
148. |
Linear programming model can be applied to line balancing problem and transportation problem. |
A. | True |
B. | False |
C. | - |
D. | - |
Answer» B. False | |
149. |
PERT is an event oriented technique. |
A. | Correct |
B. | Incorrect |
C. | - |
D. | - |
Answer» B. Incorrect | |
150. |
Line organisation is suitable for a big organisation. |
A. | Correct |
B. | Incorrect |
C. | - |
D. | - |
Answer» C. - | |