MCQOPTIONS
Saved Bookmarks
This section includes 3 Mcqs, each offering curated multiple-choice questions to sharpen your Manufacturing Engineering Questions & Answers Quality Assurance knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
M.T.M is used to |
| A. | improve existing methods |
| B. | establish time standards |
| C. | develop effective methods in advance of the beginning of production |
| D. | all of the mentioned |
| Answer» E. | |
| 2. |
P.M.T.S( Predetermined Motion Time System) include |
| A. | M.T.M (Method Time Measurement) |
| B. | W.F.S (Work Factor Systems) |
| C. | B.M.T.S (Basic Motion Time Study) |
| D. | All of the mentioned |
| Answer» E. | |
| 3. |
MRP-II system is called a closed loop system because it considers |
| A. | inventory |
| B. | finance |
| C. | man power |
| D. | none of the mentioned |
| Answer» C. man power | |