1. |
COCOMO-II_WAS_DEVELOPED_AT?$ |
A. | University of Texas |
B. | University of Southern California |
C. | MIT |
D. | IIT-Kanpur |
Answer» C. MIT | |
2. |
Which_one_is_not_a_stage_of_COCOMO-II?$ |
A. | Early design estimation model |
B. | Application Composition estimation model |
C. | Comprehensive cost estimation model |
D. | Post architecture estimation model |
Answer» B. Application Composition estimation model | |
3. |
Estimation of size for a project is dependent o? |
A. | Cost |
B. | Time |
C. | Schedule |
D. | None of the mentioned |
Answer» E. | |
4. |
COCOMO was developed initially by |
A. | B.Beizer |
B. | Rajiv Gupta |
C. | B.W.Bohem |
D. | Gregg Rothermal |
Answer» D. Gregg Rothermal | |
5. |
Which one is not a size measure for software product? |
A. | LOC |
B. | Halstead’s program length |
C. | Function Count |
D. | Cyclomatic Complexity |
Answer» E. | |
6. |
Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount. |
A. | Early design stage model |
B. | Post-architecture-stage model |
C. | Application composition model |
D. | All of the mentioned |
Answer» D. All of the mentioned | |
7. |
Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established? |
A. | Early design stage model |
B. | Post-architecture-stage model |
C. | Application composition model |
D. | All of the mentioned |
Answer» B. Post-architecture-stage model | |
8. |
COCOMO stands for |
A. | Constructive cost model |
B. | Comprehensive cost model |
C. | Constructive cost estimation model |
D. | Complete cost estimation model |
Answer» B. Comprehensive cost model | |
9. |
The empirical data that support most estimation models are derived from a vast sample of projects. |
A. | True |
B. | False |
Answer» C. | |
10. |
Which of the following uses empirically derived formulas to predict effort as a function of LOC or FP? |
A. | FP-Based Estimation |
B. | Process-Based Estimation |
C. | COCOMO |
D. | Both FP-Based Estimation and COCOMO |
Answer» E. | |