This section includes 7 Mcqs, each offering curated multiple-choice questions to sharpen your Pavement Design knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
It is proposed to improve the existing highway for 145 lakhs. Estimate the annual cost of the pavement if it to last for 15 years and the rate of interest is 6%. |
| A. | 13.94 lakhs |
| B. | 13.49 lakhs |
| C. | 14.93 lakhs |
| D. | 14.39 lakhs |
| Answer» D. 14.39 lakhs | |
| 2. |
______ is the foundation on which the economic analysis is done. |
| A. | Time cost |
| B. | Value of money |
| C. | Time value of money |
| D. | Money value of time |
| Answer» D. Money value of time | |
| 3. |
What is the formula to find the viability of a proposal using the rate of return method? |
| A. | (R= frac{0+A-M}{P} 100 ) |
| B. | (R= frac{0+A+M}{P} ) |
| C. | (R= frac{0+A+M}{P} 100 ) |
| D. | (R= frac{0+A-M}{P} ) |
| Answer» B. (R= frac{0+A+M}{P} ) | |
| 4. |
______ is used to refer to for the economic evaluation of highway projects. |
| A. | IRC:SP:30-2001 |
| B. | IRC:SP:20-2001 |
| C. | IRC:SP:30-2009 |
| D. | IRC:SP:20-2009 |
| Answer» D. IRC:SP:20-2009 | |
| 5. |
The project is said to be worth undertaking if the benefit-cost ratio is ______ |
| A. | Less than 1 |
| B. | Less than 5 |
| C. | More than 1 |
| D. | More than 5 |
| Answer» D. More than 5 | |
| 6. |
The economic analysis is concerned with the source of financing, analysis of cost-benefit to the road users and consequences. |
| A. | True |
| B. | False |
| Answer» C. | |
| 7. |
Which of the below is not a method used for the economic analysis of the pavements? |
| A. | Rate of return method |
| B. | Cost-benefit method |
| C. | Annual cost method |
| D. | Average cost method |
| Answer» E. | |