

MCQOPTIONS
Saved Bookmarks
This section includes 12 Mcqs, each offering curated multiple-choice questions to sharpen your Prestressed Concrete Structures knowledge and support exam preparation. Choose a topic below to get started.
1. |
If the spans are large, they can be sub divided by means of ____________ |
A. | Struts |
B. | Piers |
C. | Ridges |
D. | Walls |
Answer» C. Ridges | |
2. |
The construction procedure must be planned using ____________ |
A. | Sequential computations |
B. | Reverse computations |
C. | Complicated computations |
D. | Aligned computations |
Answer» B. Reverse computations | |
3. |
What is the main feature of this method comprises a moveable temporary arrangement to limit? |
A. | Feasible stress |
B. | Cantilever stress |
C. | Rigidity stress |
D. | Bond stress |
Answer» C. Rigidity stress | |
4. |
The construction starts at one end of the structure and proceeds continuously to the other end is? |
A. | Progressive placement method |
B. | Transverse placement method |
C. | Horizontal placement method |
D. | Linear placement method |
Answer» B. Transverse placement method | |
5. |
In push out technique each unit in cast directly against the ____________ |
A. | Previous unit |
B. | Tensile unit |
C. | Last units |
D. | Progressive units |
Answer» B. Tensile unit | |
6. |
The cantilever method has been successfully used in the span range of ____________ |
A. | 40-150 |
B. | 30-150 |
C. | 50-200 |
D. | 40-200 |
Answer» D. 40-200 | |
7. |
In the cost insitu method the least time required to move formwork is? |
A. | 7 |
B. | 8 |
C. | 3 |
D. | 2 |
Answer» B. 8 | |
8. |
The main advantage of using precast segmental units is they can be cast on ____________ |
A. | Beam |
B. | Slab |
C. | Edges |
D. | Ground |
Answer» E. | |
9. |
One of the example of cast insitu construction. |
A. | Boussens bridge, France |
B. | Larens bridge, Uganda |
C. | Lithcher bridge, Spain |
D. | Rouli bridge, Africa |
Answer» B. Larens bridge, Uganda | |
10. |
In cat insitu construction the formwork is supported by ____________ |
A. | Aluminium frame work |
B. | Wood frame work |
C. | Steel frame work |
D. | Cloth formwork |
Answer» D. Cloth formwork | |
11. |
The major methods of cantilever construction are classified into how many types? |
A. | 2 tyres |
B. | 3 types |
C. | 4 types |
D. | 6 types |
Answer» B. 3 types | |
12. |
Cantilever construction eliminates the use of ____________ |
A. | Steel |
B. | Cement |
C. | Formwork |
D. | Workman |
Answer» D. Workman | |