| 1. |
The concrete used for fixed-form paving has a higher slump than the concrete used for slip-form paving. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 2. |
The amp meter provided in a central mix plant is used to determine the ______ of the mix. |
| A. | Consistency |
| B. | Water content |
| C. | Aggregate content |
| D. | Flowability |
| Answer» B. Water content | |
| 3. |
Which of the below options represents the different batches of the concrete materials? |
| A. | Aggregates, cement, water and stabilizers |
| B. | Aggregates, cementitious materials and water |
| C. | Coarse aggregates, fine aggregates and cement |
| D. | Aggregates and cement |
| Answer» C. Coarse aggregates, fine aggregates and cement | |
| 4. |
What is the next step in the construction process after the preparation of the subgrade and sub-base? |
| A. | Mixing of concrete |
| B. | Batching of materials |
| C. | Placing formworks |
| D. | Compaction |
| Answer» D. Compaction | |
| 5. |
The maximum size of coarse aggregates used in the concrete must not exceed ______ of the slab thickness. |
| A. | Twice |
| B. | Half |
| C. | One fourth |
| D. | Three fourth |
| Answer» D. Three fourth | |
| 6. |
The maintenance works required on the rigid pavement is mainly in the ______ |
| A. | Surface coating |
| B. | Steel reinforcement |
| C. | Joints |
| D. | Slab surface |
| Answer» D. Slab surface | |
| 7. |
The drainage layer must be provided ______ the width of the pavement. |
| A. | Half |
| B. | Along |
| C. | Across |
| D. | Throughout |
| Answer» E. | |
| 8. |
The construction of rigid pavement mainly involves the construction of ______ |
| A. | Slab |
| B. | Slab and reinforcement |
| C. | Slab and drainage |
| D. | Slab and joint |
| Answer» E. | |
| 9. |
What are the two methods to construct the cement concrete slab? |
| A. | Alternative method and continuative method |
| B. | Alter bay method and continuing bay method |
| C. | Alternate bay method and continuous bay method |
| D. | Altering method and continuity method |
| Answer» D. Altering method and continuity method | |
| 10. |
______ is the feature that makes cement concrete popular for use in pavements? |
| A. | High strength |
| B. | Appearance |
| C. | Less maintenance |
| D. | Long lasting |
| Answer» C. Less maintenance | |