| 1. |
In the construction procedure for bituminous carpet, what treatment is provided if the existing surface is made of soft aggregates? |
| A. | Tack coat |
| B. | Prime coat |
| C. | Seal coat |
| D. | Stabilization |
| Answer» C. Seal coat | |
| 2. |
The full grout penetration macadam is used in which type of areas? |
| A. | Low rainfall |
| B. | Frost condition |
| C. | Heavy rainfall |
| D. | Hot condition |
| Answer» D. Hot condition | |
| 3. |
Premix carpet can be classified as open-graded and dense-graded. |
| A. | True |
| B. | False |
| Answer» C. | |
| 4. |
What is the specified thickness of asphaltic concrete? |
| A. | 40 mm |
| B. | 75 mm |
| C. | 50 mm |
| D. | 65 mm |
| Answer» B. 75 mm | |
| 5. |
What type of construction does the below figure represent? |
| A. | Mastic asphalt |
| B. | Carpet |
| C. | Built-up Grout |
| D. | Penetration Macadam |
| Answer» E. | |
| 6. |
The premix type of bituminous construction is carried out in the ______ |
| A. | Travelling plant |
| B. | Field |
| C. | Mixing plant |
| D. | Base |
| Answer» C. Mixing plant | |
| 7. |
The use of bituminous surface dressing with precoated aggregates is used when ______ is required. |
| A. | Poor adhesion |
| B. | Better adhesion |
| C. | Poor cohesion |
| D. | Better cohesion |
| Answer» C. Poor cohesion | |
| 8. |
Rolling of the sub-base material is done till ______ of the maximum density of the material. |
| A. | 98% |
| B. | 50% |
| C. | 100% |
| D. | 75% |
| Answer» B. 50% | |
| 9. |
Which of the below is not a type of premix bituminous construction? |
| A. | Bituminous concrete |
| B. | Mastic asphalt |
| C. | Penetration macadam |
| D. | Carpet |
| Answer» D. Carpet | |
| 10. |
Lateral confinement is provided by constructing ______ in advance. |
| A. | Kerbs |
| B. | Shoulders |
| C. | Camber |
| D. | Poles |
| Answer» C. Camber | |
| 11. |
Which of the below is not involved in the preparation of the subgrade? |
| A. | Compaction |
| B. | Grading |
| C. | Site clearance |
| D. | Spreading |
| Answer» E. | |