

MCQOPTIONS
Saved Bookmarks
This section includes 20 Mcqs, each offering curated multiple-choice questions to sharpen your Prestressed Concrete Structures knowledge and support exam preparation. Choose a topic below to get started.
1. |
Which type of analysis should be done which will lead to an optimal design of planning a structure? |
A. | Comparative analysis |
B. | Strength analysis |
C. | Transferred analysis |
D. | Global analysis |
Answer» B. Strength analysis | |
2. |
Calculate the cracking load such that section adopted is 50000, the loss ratio is 0.8, compressive strength of concrete is 9.43 and minimum reinforcement is 4.0mm2? |
A. | 455kn |
B. | 324kn |
C. | 577.2kn |
D. | 456.6kn |
Answer» D. 456.6kn | |
3. |
Calculate the number of wires which are subjected to prestressing force of 471.5kn, the section adopted is 50000 using 7mm diameter high tensile wires initially stressed at 1100n/mm2? |
A. | 13.2 |
B. | 11.13 |
C. | 24.5 |
D. | 34.2 |
Answer» C. 24.5 | |
4. |
Calculate the area of concrete section such that loss ratio is 0.18 and compressive strength is 15n/mm2 (Nd = 377×103)? |
A. | 9.43n/mm2 |
B. | 6.54n/mm2 |
C. | 8.5n/mm2 |
D. | 9.34n/mm2 |
Answer» B. 6.54n/mm2 | |
5. |
The steel bearing plates which are anchored serves as __________ |
A. | Loading |
B. | Bearing |
C. | Stressing |
D. | Deforming |
Answer» C. Stressing | |
6. |
The polygonal trusses are less economical than? |
A. | Circular |
B. | Bow type |
C. | Curved |
D. | Oval |
Answer» B. Bow type | |
7. |
The polygonal trusses with inclined top chords are generally made of __________ |
A. | 8m Blocks |
B. | 6m blocks |
C. | 12m block |
D. | 65m block |
Answer» C. 12m block | |
8. |
For spans in the range of 18-24m, the trusses are made in how many pieces? |
A. | 4 pieces |
B. | 2 pieces |
C. | 1 piece |
D. | 5 pieces |
Answer» D. 5 pieces | |
9. |
The precast roof slabs are used for __________ |
A. | Roof coverings |
B. | Slab coverings |
C. | Column coverings |
D. | Beam coverings |
Answer» B. Slab coverings | |
10. |
The chords and struts of trusses are designed for convenience in __________ |
A. | Plastering |
B. | Fabricating |
C. | Rubbing |
D. | Forrowing |
Answer» C. Rubbing | |
11. |
CALCULATE_THE_CRACKING_LOAD_SUCH_THAT_SECTION_ADOPTED_IS_50000,_THE_LOSS_RATIO_IS_0.8,_COMPRESSIVE_STRENGTH_OF_CONCRETE_IS_9.43_AND_MINIMUM_REINFORCEMENT_IS_4.0MM2??$ |
A. | 455kn |
B. | 324kn |
C. | 577.2kn |
D. | 456.6kn |
Answer» D. 456.6kn | |
12. |
Which type of analysis should be done which will lead to an optimal design of planning a structure?$ |
A. | Comparative analysis |
B. | Strength analysis |
C. | Transferred analysis |
D. | Global analysis |
Answer» B. Strength analysis | |
13. |
Calculate the number of wires which are subjected to prestressing force of 471.5kn, the section adopted is 50000 using 7mm diameter high tensile wires initially stressed at 1100n/mm2? |
A. | 13.2 |
B. | 11.13 |
C. | 24.5 |
D. | 34.2 |
Answer» C. 24.5 | |
14. |
Calculate the area of concrete section such that loss ratio is 0.18 and compressive strength is 15n/mm2 (Nd = 377√ó103)?$ |
A. | 9.43n/mm<sup>2</sup> |
B. | 6.54n/mm<sup>2</sup> |
C. | 8.5n/mm<sup>2</sup> |
D. | 9.34n/mm<sup>2</sup> |
Answer» B. 6.54n/mm<sup>2</sup> | |
15. |
The steel bearing plates which are anchored serves as: |
A. | Loading |
B. | Bearing |
C. | Stressing |
D. | Deforming |
Answer» C. Stressing | |
16. |
The polygonal trusses are less economical than: |
A. | Circular |
B. | Bow type |
C. | Curved |
D. | Oval |
Answer» B. Bow type | |
17. |
The polygonal trusses with inclined top chords are generally made of: |
A. | 8m Blocks |
B. | 6m blocks |
C. | 12m block |
D. | 65m block |
Answer» C. 12m block | |
18. |
For spans in the range of 18-24m, the trusses are made in how many pieces: |
A. | 4 pieces |
B. | 2 pieces |
C. | 1 piece |
D. | 5 pieces |
Answer» D. 5 pieces | |
19. |
The precast roof slabs are used for: |
A. | Roof coverings |
B. | Slab coverings |
C. | Column coverings |
D. | Beam coverings |
Answer» B. Slab coverings | |
20. |
The chords and struts of trusses are designed for convenience in: |
A. | Plastering |
B. | Fabricating |
C. | Rubbing |
D. | Forrowing |
Answer» C. Rubbing | |