This section includes 5814 Mcqs, each offering curated multiple-choice questions to sharpen your Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 2501. |
Due to pertubation of the orbit, satellite orbit parameters are frequently updated on measurements carried out by its |
| A. | six ground stations |
| B. | five ground stations |
| C. | four ground stations |
| D. | three ground stations |
| Answer» C. four ground stations | |
| 2502. |
Which one of the following errors is produced by platform characteristics of the sensor ? |
| A. | altitude variation |
| B. | altitude |
| C. | orbit drift |
| D. | All of these |
| Answer» E. | |
| 2503. |
The spectral region of the electromagnetic radiation which passes through the atmosphere without much attenuation is known as: |
| A. | ozone hole |
| B. | atmospheric window |
| C. | ozone window |
| D. | black hole |
| Answer» C. ozone window | |
| 2504. |
F.S.L. of a canal at its head with respect to parent channel is kept |
| A. | at the same level |
| B. | 15 cm lower |
| C. | 15 cm higher |
| D. | none of these. |
| Answer» C. 15 cm higher | |
| 2505. |
Littoral drift |
| A. | is the raised line of sand, parallel to the sea coast |
| B. | is the slow movement of surface water at sea caused by the wind |
| C. | is a current parallel to the shore, caused due to tangential component of the wind |
| D. | is a current perpendicular to the shore line caused due to wind. |
| Answer» D. is a current perpendicular to the shore line caused due to wind. | |
| 2506. |
The remote sensing techniques applied for the earth's surface features, is generally confined to the following wave lengths : |
| A. | 0.4 to 1.3, 1.5 to 1.8, 2.2 to 2.6 m |
| B. | 2.2 to 2.6, 3.0 to 3.6, 4.2 to 5.0 m |
| C. | 4.2 to 5.0, 7.0 to 15.0 m and 1 cm to 30 cm |
| D. | All of these |
| Answer» E. | |
| 2507. |
Which one of the following land marks on the coast line must be depicted on hydrographic maps ? |
| A. | shore line |
| B. | light houses |
| C. | church spires |
| D. | all the above. |
| Answer» E. | |
| 2508. |
The shore line survey includes : |
| A. | depicting the shore line |
| B. | depicting the prominent details on shore line |
| C. | depicting the high water line |
| D. | depicting the low water line |
| E. | all the above. |
| Answer» F. | |
| 2509. |
In a wet dock system, |
| A. | minimum required depth of water for the vessels is maintained |
| B. | entrance locks are provided with massive gates |
| C. | the locks of dock gate are operated by means of heavy bascule bridges and connected machinery |
| D. | the cost of construction is quite heavy |
| E. | all the above. |
| Answer» F. | |
| 2510. |
The important component of a sea port is |
| A. | terminal buildings |
| B. | the docks |
| C. | the harbour |
| D. | all of these. |
| Answer» E. | |
| 2511. |
For location of soundings a range and one angle from the shore involves the following operations. Which one is correct ? |
| A. | A range line is established |
| B. | The first and the last soundings and every tenth soundings are fixed by angular observations |
| C. | The intermediate soundings are fixed by the time intervals |
| D. | All the above. |
| Answer» E. | |
| 2512. |
The width of the entrances of the harbours is restricted to |
| A. | 100 m |
| B. | 125 m |
| C. | 150 m |
| D. | 180 m |
| Answer» E. | |
| 2513. |
Repetitive observations of the same area at equal interval of time, are useful to monitor the dynamic phenomena : |
| A. | Cloud evolution |
| B. | Vegetative cover |
| C. | Snow cover |
| D. | Forest fires |
| E. | All of these |
| Answer» F. | |
| 2514. |
PERT analysis is based on |
| A. | optimistic time |
| B. | pessimistic time |
| C. | most likely time |
| D. | all the above. |
| Answer» E. | |
| 2515. |
The normal altitude of GPS satellite is about |
| A. | 16, 200 km |
| B. | 20, 200 km |
| C. | 24, 400 km |
| D. | 36, 100 km |
| Answer» C. 24, 400 km | |
| 2516. |
Identification of crops is affected by: |
| A. | the spectral characteristics of the sensor |
| B. | the spatial characteristics of the sensor |
| C. | the radio metric characteristics of the sensor |
| D. | All of these |
| Answer» E. | |
| 2517. |
The main advantage of line organisation, is : |
| A. | effective command and control |
| B. | defined responsibilities at all levels |
| C. | rigid discipline in the organisation |
| D. | ability of quick decision at all levels |
| E. | all the above. |
| Answer» F. | |
| 2518. |
For completion of a project, the critical path of the network represents |
| A. | minimum time |
| B. | maximum time |
| C. | maximum cost |
| D. | minimum cost. |
| Answer» B. maximum time | |
| 2519. |
In CPM analysis, |
| A. | emphasis is given to activities |
| B. | uncertainties are not allowed |
| C. | activities are represented by arrows |
| D. | beginning and end of an activity, are denoted by nodes |
| E. | all the above. |
| Answer» F. | |
| 2520. |
The final selection of a construction site, is done by |
| A. | departmental representative or user |
| B. | local civil authority representative |
| C. | representative of engineer authority |
| D. | representative of administration |
| E. | all the above. |
| Answer» F. | |
| 2521. |
PERT is |
| A. | an analytic in concept |
| B. | limited of event oriented diagrams |
| C. | used for research and development projects |
| D. | based on three time estimates for activities linking up two events |
| E. | all the above. |
| Answer» F. | |
| 2522. |
Residential buildings are treated as |
| A. | light construction |
| B. | heavy construction |
| C. | industrial construction |
| D. | private construction. |
| Answer» B. heavy construction | |
| 2523. |
The first stage of a construction, is |
| A. | preparation of estimate |
| B. | survey of the site |
| C. | initiation of proposal |
| D. | preparation of tender |
| E. | allotment of funds. |
| Answer» D. preparation of tender | |
| 2524. |
The critical activity has |
| A. | maximum float |
| B. | minimum float |
| C. | zero float |
| D. | none of these. |
| Answer» D. none of these. | |
| 2525. |
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds |
| A. | 2.0% |
| B. | 2.5% |
| C. | 4.0% |
| D. | 5.0% |
| Answer» E. | |
| 2526. |
The following item of earth work is not measured separately. |
| A. | Setting out of works |
| B. | Site clearence |
| C. | dead men |
| D. | Steps in deep exavaction |
| E. | All the above. |
| Answer» F. | |
| 2527. |
While estimating the qualities for the construction of a building, the correct metric unit is |
| A. | Metre for length |
| B. | Cubic metre for area |
| C. | Square metres for volume |
| D. | Kilogram for weight |
| E. | Litre for capacity |
| Answer» F. | |
| 2528. |
The slope of the oultet of 'P trap' below the horizontal is kept |
| A. | 8 |
| B. | 10 |
| C. | 12 |
| D. | 14 |
| Answer» E. | |
| 2529. |
The floor area includes the area of the balcony up to |
| A. | 100% |
| B. | 75% |
| C. | 50% |
| D. | 25% |
| Answer» D. 25% | |
| 2530. |
The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is |
| A. | <img src="/_files/images/civil-engineering/estimating-and-costing/17-23-76-1.png"> |
| B. | <img src="/_files/images/civil-engineering/estimating-and-costing/17-23-76-2.png"> |
| C. | <img src="/_files/images/civil-engineering/estimating-and-costing/17-23-76-3.png"> |
| D. | <img src="/_files/images/civil-engineering/estimating-and-costing/17-23-76-4.png"> |
| Answer» B. <img src="/_files/images/civil-engineering/estimating-and-costing/17-23-76-2.png"> | |
| 2531. |
Consider the following statements regarding the satellite imaging :1. The satellite orbit is fixed in the inertial space2. During successive across-track imaging, the earth rotates beneath the sensor3. The satellite images a skewed area Which one of the following statements is/are correct ? |
| A. | 1, 2, 3 |
| B. | 1, 3 |
| C. | 2, 3 |
| D. | 1, 2 |
| Answer» B. 1, 3 | |
| 2532. |
If flying height of a spacecraft is H, the length of air base is B and the parallax difference between two points is dp, then the difference in height |
| A. | <img src="/_files/images/civil-engineering/elements-of-remote-sensing/19-27-99-1.png"> |
| B. | <img src="/_files/images/civil-engineering/elements-of-remote-sensing/19-27-99-2.png"> |
| C. | <img src="/_files/images/civil-engineering/elements-of-remote-sensing/19-27-99-3.png"> |
| D. | <img src="/_files/images/civil-engineering/elements-of-remote-sensing/19-27-99-4u.png"> |
| Answer» B. <img src="/_files/images/civil-engineering/elements-of-remote-sensing/19-27-99-2.png"> | |
| 2533. |
In GPS, receivers are used are ; |
| A. | electronic clocks |
| B. | atomic clocks |
| C. | quartz clocks |
| D. | mechanical clocks |
| Answer» D. mechanical clocks | |
| 2534. |
Which one of the following statement is incorrect regarding the electromagnetic radiation? |
| A. | These are produced by the motion of electric charge |
| B. | The oscillation of charged particles sets up changing electric fields. |
| C. | The changing electric fields induce the changing magnetic fields in the surrounding medium. |
| D. | None of these |
| Answer» E. | |
| 2535. |
Referring of given figure, pick up the correct statement from the following: |
| A. | The total length of centre line of four walls is 20 m |
| B. | Length of long wall out-to-out is 6.80 m |
| C. | Length of short walls in-to-in is 3.20 m |
| D. | All the above. |
| Answer» E. | |
| 2536. |
Size, capacity and materials need be specified for |
| A. | Bib-cocks |
| B. | Stop-cocks |
| C. | Ferrules |
| D. | Ball valves |
| E. | All the above. |
| Answer» F. | |
| 2537. |
The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is |
| A. | 1.00 cubic meter |
| B. | 2.00 cubic meter |
| C. | 3.00 cubic meter |
| D. | 4.00 cubic meter |
| Answer» D. 4.00 cubic meter | |
| 2538. |
Anti-siphonage pipe is connected to |
| A. | Main soil pipe |
| B. | Bottom of P trap W.C. |
| C. | Top of P trap W.C. |
| D. | Side of water closet. |
| Answer» D. Side of water closet. | |
| 2539. |
Carpet area does not include the area of |
| A. | the walls along with doors and other openings |
| B. | verandah, corridor and passage |
| C. | bath room and lavatory |
| D. | kitchen and pantry |
| E. | All the above. |
| Answer» F. | |
| 2540. |
The trap which is provided to disconnect the house drain from the street sewer is called |
| A. | Master trap |
| B. | Intercepting trap |
| C. | Interception manhole |
| D. | Intercepterchamber |
| E. | All the above. |
| Answer» F. | |
| 2541. |
Pick up the correct statement regarding the centre line method of estimating a building |
| A. | Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item |
| B. | The centre line is worked out separately for different sections of walls of a building |
| C. | The centre line length is reduced by half the layer of main wall joining the partition wall |
| D. | All the above. |
| Answer» E. | |
| 2542. |
The weight of an item is measured correct to nearest |
| A. | 0.25 kg |
| B. | 0.50 kg |
| C. | 0.75 kg |
| D. | 1.00 kg |
| E. | 5 kg |
| Answer» E. 5 kg | |
| 2543. |
The main disadvantage of line organisation, is |
| A. | rigid structure |
| B. | extraordinary delay in communications |
| C. | top level executions over work |
| D. | all the above. |
| Answer» E. | |
| 2544. |
Pre-tender stage requires |
| A. | acquisition of land |
| B. | selection of site |
| C. | formalisation of alignment of work |
| D. | formalisation of designs and preparation of estimate |
| E. | all the above. |
| Answer» F. | |
| 2545. |
In sun light, water rich in phytoplanktons appears : |
| A. | red |
| B. | green |
| C. | brown |
| D. | blue |
| Answer» C. brown | |
| 2546. |
The semi-infinite snow albedo is proportional to the square root of the grain radius : |
| A. | in the 0.2 to 0.4 m wave length region |
| B. | in the 0.4 to 0.8 m wave length region |
| C. | in the 0.8 to 1.2 m wave length |
| D. | None of these |
| Answer» C. in the 0.8 to 1.2 m wave length | |
| 2547. |
Depending upon the nature of the targeted object and the wave length of the electromagnetic radiation incident on it, the radiation gets : |
| A. | reflected |
| B. | absorbed |
| C. | re-radiated |
| D. | transmitted through |
| E. | All of these |
| Answer» F. | |
| 2548. |
An event is indicated on the network by a number enclosed in |
| A. | a circle |
| B. | a square |
| C. | a triangle |
| D. | an ellipse |
| E. | all the above. |
| Answer» F. | |
| 2549. |
While scheduling a project by C.P.M. |
| A. | a project is divided into various activities |
| B. | required time for each activity is established |
| C. | sequence of various activities is made according to their importance |
| D. | net work is drawn by connecting the activities and the events |
| E. | All the above. |
| Answer» F. | |
| 2550. |
For the network shown in the given figure, the expected time for the activity |
| A. | 1-2 is 4 |
| B. | 2-3 is 7 |
| C. | 3-4 is 8 |
| D. | all the above. |
| Answer» E. | |