

MCQOPTIONS
Saved Bookmarks
This section includes 28 Mcqs, each offering curated multiple-choice questions to sharpen your Prestressed Concrete Structures knowledge and support exam preparation. Choose a topic below to get started.
1. |
The base slab forming the floor or tank is generally made of __________ |
A. | Prestressed concrete |
B. | Reinforced concrete |
C. | Aluminium concrete |
D. | Coloured concrete |
Answer» C. Aluminium concrete | |
2. |
The square or rectangular tanks are required for __________ |
A. | Structural use |
B. | Industrial use |
C. | Aggregate use |
D. | Commercial use |
Answer» C. Aggregate use | |
3. |
An ingenious method of casting spherical shells at the centre with conical shape was adopted by __________ |
A. | Finsterwalder |
B. | Darles |
C. | Hinge |
D. | Larcan |
Answer» B. Darles | |
4. |
The percentage of reinforcement for prestressed concrete pipes varies between __________ |
A. | 0.5 and 1 |
B. | 0.10 and 2 |
C. | 0.8 and 4 |
D. | 0.7 and 3 |
Answer» B. 0.10 and 2 | |
5. |
In design of concrete pipes the full working pressure conforming to the limit state of __________ |
A. | Design |
B. | Collapse |
C. | Serviceability |
D. | Tension |
Answer» D. Tension | |
6. |
The diagram of prestressed concrete pipes of circumferential prestressing may be with or without __________ |
A. | Transversal prestress |
B. | Longitudinal prestress |
C. | Elliptical prestress |
D. | Rounded prestress |
Answer» C. Elliptical prestress | |
7. |
In stage construction, the main function of the longitudinal prestress is to prevent __________ |
A. | Blocking |
B. | Cracking |
C. | Linking |
D. | Wedging |
Answer» C. Linking | |
8. |
In monolyte construction the manufacturing process consists of pouring concrete under high frequency of __________ |
A. | Vibration |
B. | Pressure |
C. | Tension |
D. | Bending |
Answer» B. Pressure | |
9. |
The classification of prestressed concrete pipes may be done depending upon the method of __________ |
A. | Curing |
B. | Placement |
C. | Manufacture |
D. | Tension |
Answer» D. Tension | |
10. |
The pretressed concrete pipes are ideally suited for a pressure range of __________ |
A. | 0.6 to 4n/mm2 |
B. | 0.5 to 4n/mm2 |
C. | 0.8 to 4n/mm2 |
D. | 0.10 to 4n/mm2 |
Answer» C. 0.8 to 4n/mm2 | |
11. |
A preformed spiral of high strength steel is placed in the form, the concrete made by using __________ |
A. | Expanding cements |
B. | High strength cements |
C. | Colored cement |
D. | Aggregates |
Answer» B. High strength cements | |
12. |
In circular prestressing the tension in the wire is produced by pulling it through __________ |
A. | Tendons |
B. | Anchorages |
C. | Bars |
D. | Die |
Answer» E. | |
13. |
In circular prestressing, the member may be prestressed by overlapping __________ |
A. | Anchorages |
B. | Ridges |
C. | Tendons |
D. | Bars |
Answer» D. Bars | |
14. |
A reinforced concrete pressure pipe requires a large amount of __________ |
A. | Span |
B. | Reinforcement |
C. | Area |
D. | Deflection |
Answer» C. Area | |
15. |
The percentage of reinforcement for prestressed concrete pipes varies between:$ |
A. | 0.5 and 1 |
B. | 0.10 and 2 |
C. | 0.8 and 4 |
D. | 0.7 and 3 |
Answer» B. 0.10 and 2 | |
16. |
In design of concrete pipes the full working pressure conforming to the limit state of:$ |
A. | Design |
B. | Collapse |
C. | Serviceability |
D. | Tension |
Answer» D. Tension | |
17. |
The joint between the walls of the tank and floor slab may be any of the following of? |
A. | 3 |
B. | 4 |
C. | 5 |
D. | 6 |
Answer» B. 4 | |
18. |
The base slab forming the floor or tank is generally made of: |
A. | Prestressed concrete |
B. | Reinforced concrete |
C. | Aluminium concrete |
D. | Coloured concrete |
Answer» C. Aluminium concrete | |
19. |
The square or rectangular tanks are required for: |
A. | Structural use |
B. | Industrial use |
C. | Aggregate use |
D. | Commercial use |
Answer» C. Aggregate use | |
20. |
An ingenious method of casting spherical shells at the centre with conical shape was adopted by: |
A. | Finsterwalder |
B. | Darles |
C. | Hinge |
D. | Larcan |
Answer» B. Darles | |
21. |
In stage construction the main function of the longitudinal prestress is to prevent? |
A. | Blocking |
B. | Cracking |
C. | Linking |
D. | Wedging |
Answer» C. Linking | |
22. |
In monolyte construction the manufacturing process consists of pouring concrete under high frequency of: |
A. | Vibration |
B. | Pressure |
C. | Tension |
D. | Bending |
Answer» B. Pressure | |
23. |
The classification of prestressed concrete pipes may be done depending upon the method of: |
A. | Curing |
B. | Placement |
C. | Manufacture |
D. | Tension |
Answer» D. Tension | |
24. |
The pretressed concrete pipes are ideally suited for a pressure range of: |
A. | 0.6 to 4n/mm<sup>2</sup> |
B. | 0.5 to 4n/mm<sup>2</sup> |
C. | 0.8 to 4n/mm<sup>2</sup> |
D. | 0.10 to 4n/mm<sup>2</sup> |
Answer» C. 0.8 to 4n/mm<sup>2</sup> | |
25. |
A preformed spiral of high strength steel is placed in the form, the concrete made by using: |
A. | Expanding cements |
B. | High strength cements |
C. | Colored cement |
D. | Aggregates |
Answer» B. High strength cements | |
26. |
In circular prestressing the tension in the wire is produced by pulling it through: |
A. | Tendons |
B. | Anchorages |
C. | Bars |
D. | Die |
Answer» E. | |
27. |
In circular prestressing, the member may be prestressed by overlapping: |
A. | Anchorages |
B. | Ridges |
C. | Tendons |
D. | Bars |
Answer» D. Bars | |
28. |
A reinforced concrete pressure pipe requires a large amount of: |
A. | Span |
B. | Reinforcement |
C. | Area |
D. | Deflection |
Answer» C. Area | |