

MCQOPTIONS
Saved Bookmarks
This section includes 5 Mcqs, each offering curated multiple-choice questions to sharpen your Steam And Gas Turbines knowledge and support exam preparation. Choose a topic below to get started.
1. |
Due to metallurgical consideration in closed cycle cooling system the upper temperature is limited to _____________ |
A. | 500 C |
B. | 540 C |
C. | 200 C |
D. | none of the mentioned |
Answer» C. 200 C | |
2. |
With metallurgical considerations the temperature in Gas turbine blades is reduced by ________ |
A. | 2000 F |
B. | 3000 F |
C. | 1000 F |
D. | none of the mentioned |
Answer» B. 3000 F | |
3. |
In a steam turbine a set of ________ blades are connected to casing. |
A. | stationary |
B. | rotating |
C. | stationary & rotating |
D. | none of the mentioned |
Answer» C. stationary & rotating | |
4. |
Two flow rotors use __________ pressure casings. |
A. | low |
B. | high |
C. | medium |
D. | none of the mentioned |
Answer» B. high | |
5. |
Turbine casing also contains __________ working fluid. |
A. | temperature of |
B. | flow direction of |
C. | pressure |
D. | none of the mentioned |
Answer» C. pressure | |